Thunderhead Wind Energy LLC
TBD, Boone, NE 68620Plant Summary Information
Thunderhead Wind Energy LLC is ranked #34 out of 1,343 wind farms nationwide in terms of total annual net electricity generation.
Thunderhead Wind Energy LLC generated 220.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Thunderhead Wind Energy LLC |
---|---|
Utility Name | Invenergy Services LLC |
Location | Antelope County, NE |
Initial Operation Date | November 2022 |
Last Update | Aug 2024 |
Annual Generation | 1.2 TWh |
Annual Consumption | 4.2 M MMBtu |
Ranked #668 out of 11,835 Power Plants Nationwide | |
Ranked #34 out of 1,343 Wind Power Plants Nationwide | |
Ranked #4 out of 116 Nebraska Power Plants | |
Ranked #1 out of 34 Nebraska Wind Power Plants | |
Fuel Types | Wind |
Map of Thunderhead Wind Energy LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Thunderhead Wind Energy LLC.
Monthly Net Generation for Thunderhead Wind Energy LLC
Thunderhead Wind Energy LLC Details
Summary Information | |
---|---|
Plant Name | Thunderhead Wind Energy LLC (62956) |
Plant Address | TBD, Boone, NE 68620 |
Utility | Invenergy Services LLC (49893) |
Latitude, Longitude | 42.062, -98.23896 |
Generation Dates on File | Nov 2022 to Aug 2024 |
Initial Operation Date | November 2022 |
Annual Generation | 1.2 TWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Nebraska Public Power District (13337) NE |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating November 2022
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 300 MW |
Summer Capacity | 300 MW |
Winter Capacity | 300 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2022 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 108 |
Turbine Details | |
Number Of Turbines | 108 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.82-127 |
Design Wind Speed | 14 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 295 |
Thunderhead Wind Energy LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#24 | High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.3 TWh |
#25 | Inertia Wind Project | Haskell, TX | 1.2 TWh |
#26 | Neosho Ridge Wind Energy Center | Galesburg, KS | 1.2 TWh |
#27 | Santa Rita Wind Energy | Big Lake, TX | 1.2 TWh |
#28 | Jordan Creek Wind Farm, LLC | Judyville, IN | 1.2 TWh |
#29 | Iron Star Wind Project | Dodge City, KS | 1.2 TWh |
#30 | Foard City Wind | Crowell, TX | 1.2 TWh |
#31 | Red Cloud Wind LLC | Corona, NM | 1.2 TWh |
#32 | Mesquite Star | Roscoe, TX | 1.2 TWh |
#33 | Ranchero Wind Farm LLC | Iraan, TX | 1.2 TWh |
#35 | Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh |
#36 | Santa Rita East | Barnhart, TX | 1.1 TWh |
#37 | Flat Ridge 2 Wind Energy LLC | Zenda, KS | 1.1 TWh |
#38 | Western Plains Wind Farm | Spearville, KS | 1.1 TWh |
#39 | 25 Mile Creek | Gage, OK | 1.1 TWh |
#40 | Soldier Creek Wind | Corning, KS | 1.1 TWh |
#41 | Sage Draw Wind | Wilson, TX | 1.1 TWh |
#42 | Stephens Ranch Wind Energy LLC | O'Donnell, TX | 1.1 TWh |
#43 | TG East | Truscott, TX | 1.1 TWh |
#44 | Arbor Hill Wind Farm | Greenfield, IA | 1.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Thunderhead Wind Energy LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Burwell | Burwell, NE | 35.0 MWh | 50.1 mi |
Creston Ridge II, LLC | Creston, NE | 24.6 GWh | 51.1 mi |
Creston Ridge Wind Farm | Creston, NE | 26.1 GWh | 51.3 mi |
Crofton Bluffs Wind LLC | Bloomfield, NE | 119.0 GWh | 55.4 mi |
Elkhorn Ridge Wind LLC | Bloomfield, NE | 157.2 GWh | 54.1 mi |
Grande Prairie Wind Farm | O'Neill, NE | 1.0 TWh | 38.9 mi |
Haystack Wind Project, LLC | Carroll, NE | 827.8 GWh | 55.2 mi |
Laredo Ridge Wind LLC | Petersburg, NE | 240.3 GWh | 16.7 mi |
Madison Utilities | Madison, NE | 26.0 MWh | 43.3 mi |
Monroe (NE) | Monroe, NE | 27.0 GWh | 51.3 mi |
Ord | Ord, NE | 59.0 MWh | 47.5 mi |
Plum Creek Wind Project (NE) | Winside, NE | 810.2 GWh | 53.5 mi |
Prairie Breeze | Elgin, NE | 765.7 GWh | 11.3 mi |
Prairie Breeze II | Elgin, NE | 270.4 GWh | 5.3 mi |
Prairie Breeze III | Elgin, NE | 131.3 GWh | 5.3 mi |
Sholes Wind Energy Center | Randolph, NE | 710.9 GWh | 48 mi |
South 49th 013445 SCS Norfolk, LLC | Norfolk, NE | 18.2 GWh | 38.9 mi |
Spalding | Spalding, NE | 5.0 MWh | 27.1 mi |
TPW Petersburg | Petersburg, NE | 151.1 GWh | 19.7 mi |
Upstream Wind Energy LLC | Neligh, NE | 798.1 GWh | 16.4 mi |