Thunderbird Generator (Tbird)
2100 Road F5, Emporia, KS 66801Plant Summary Information
Thunderbird Generator (Tbird) is ranked #24 out of 61 distillate fuel oil power plants in Kansas in terms of total annual net electricity generation.
Thunderbird Generator (Tbird) is comprised of 1 generator and generated 40.4 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Thunderbird Generator (Tbird) |
---|---|
Utility Name | 4 Rivers Electric Cooperative Inc. |
Location | Lyon County, KS |
Initial Operation Date | May 2019 |
Last Update | Dec 2022 |
Annual Generation | 123.3 MWh |
Annual Consumption | 1.2 k MMBtu |
Ranked #10,868 out of 11,249 Power Plants Nationwide | |
Ranked #836 out of 1,267 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #117 out of 145 Kansas Power Plants | |
Ranked #24 out of 61 Kansas Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Thunderbird Generator (Tbird)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Thunderbird Generator (Tbird).
Monthly Net Generation for Thunderbird Generator (Tbird)
Thunderbird Generator (Tbird) Details
Summary Information | |
---|---|
Plant Name | Thunderbird Generator (Tbird) (63575) |
Plant Address | 2100 Road F5 Emporia, KS 66801 |
Utility | 4 Rivers Electric Cooperative Inc. (63286) |
Latitude, Longitude | 38.46893, -96.25358 |
Generation Dates on File | Jan 2020 to Dec 2022 |
Initial Operation Date | May 2019 |
Annual Generation | 123.3 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | 4 Rivers Electric Cooperative, Inc. (64196) KS |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator TBRID Details Operating May 2019
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Thunderbird Generator (Tbird) Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#826 | Shenandoah | Shenandoah, IA | 129.6 MWh |
#827 | Regeneron Pharmaceuticals Inc. | Tarrytown, NY | 139.7 MWh |
#828 | Falling Spring | Chambersburg, PA | 1.3 GWh |
#829 | Baldwin City Plant No 2 | Baldwin City, KS | 489.1 MWh |
#830 | Farmers Electric Cooperative - Kalona | Kalona, IA | 127.6 MWh |
#831 | Beloit | Beloit, KS | 291.8 MWh |
#832 | St. Olaf StandBy Generators | Northfield, MN | 126.8 MWh |
#833 | Robbins Lumber | Searsmont, ME | 126.6 MWh |
#834 | Elk River | Elk River, MN | 70.2 GWh |
#835 | Redwood Falls | Redwood Falls, MN | 452.2 MWh |
#837 | University of Washington Power Plant | Seattle, WA | 3.9 GWh |
#838 | Ord | Ord, NE | 121.6 MWh |
#839 | Greenville Electric Generating Station | Greenville, OH | 211.5 GWh |
#840 | Alliant SBD 9203 Profol | Cedar Rapids, IA | 119.8 MWh |
#841 | Hurricane Creek Lift Station | Greenwood, IN | 119.7 MWh |
#842 | Kennett | Kennett, MO | 6.3 GWh |
#843 | Castleton Energy Center | Castleton, NY | 198.7 GWh |
#844 | La Porte | La Porte City, IA | 117.5 MWh |
#845 | Cumberland (WI) | Cumberland, WI | 166.2 MWh |
#846 | Kindred School | Kindred, ND | 116.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Thunderbird Generator (Tbird).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Americus | Emporia, KS | 2.5 GWh | 8 mi |
Baldwin City Plant No 2 | Baldwin City, KS | 489.1 MWh | 60.8 mi |
Burlingame | Burlingame, KS | 33.5 MWh | 30 mi |
Burlington (KS) | Burlington, KS | 169.1 MWh | 33.3 mi |
Corvias - Fort Riley II | Fort Riley, KS | 2.4 GWh | 52.2 mi |
DeGraff Butler Electric | Burns, KS | 2.6 GWh | 46.9 mi |
Diamond Vista Wind Project, LLC | Tampa, KS | 1.0 TWh | 43.1 mi |
East Kansas Agri-Energy, LLC | Garnett, KS | 4.4 GWh | 56.5 mi |
El Dorado Refinery | El Dorado, KS | 243.0 GWh | 57.7 mi |
Emporia Energy Center | Emporia, KS | 1.5 TWh | 10.3 mi |
Iola | Iola, KS | 1.7 GWh | 58.7 mi |
Jeffrey Energy Center | St. Mary's, KS | 5.8 TWh | 57 mi |
Ottawa | Ottawa, KS | 705.3 MWh | 53.6 mi |
Reading Wind Project | Reading, KS | 656.4 GWh | 15.6 mi |
Sharpe | Waverly, KS | 1.9 GWh | 33.6 mi |
Sunflower Energy Center, LLC | Peabody, KS | 451.9 GWh | 46 mi |
Waste Management Rolling Meadows LFGTE | Topeka, KS | 49.7 GWh | 56.3 mi |
Waverly Wind Farm LLC | Waverly, KS | 821.9 GWh | 28 mi |
Wolf Creek Generating Station | Burlington, KS | 11.2 TWh | 34.4 mi |
Wolf Creek Generator | Burlington, KS | 129.9 MWh | 33.7 mi |