Thomas Hill
5693 Highway F, Clifton Hill, MO 65244Plant Summary Information
Thomas Hill is ranked #3 out of 5 coal plants nationwide in terms of total annual net electricity generation.
Thomas Hill is comprised of 3 generators and generated 1.7 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Thomas Hill |
---|---|
Utility Name | Associated Electric Coop, Inc |
Location | Randolph County, MO |
Initial Operation Date | December 1966 |
Last Update | Aug 2024 |
Annual Generation | 6.2 TWh |
Annual Consumption | 65.4 M MMBtu |
Ranked #154 out of 11,835 Power Plants Nationwide | |
Ranked #3 out of 5 Refined Coal Power Plants Nationwide | |
Ranked #3 out of 120 Missouri Power Plants | |
Ranked #1 out of 2 Missouri Refined Coal Power Plants | |
Fuel Types | Refined Coal : 99.9% |
Map of Thomas Hill
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Thomas Hill.
Monthly Net Generation for Thomas Hill
Thomas Hill Details
Summary Information | |
---|---|
Plant Name | Thomas Hill (2168) |
Plant Address | 5693 Highway F, Clifton Hill, MO 65244 |
Utility | Associated Electric Coop, Inc (924) |
Latitude, Longitude | 39.5522, -92.6381 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | December 1966 |
Annual Generation | 6.2 TWh |
Fuel Types | Refined Coal : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Associated Electric Cooperative, Inc. (AECI) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Thomas Hill Lake |
Ash Impoundment | Yes Lined Operating |
Transmission / Distribution Owner | Associated Electric Coop, Inc (924) |
Grid Voltage | 161.00 kV / 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 1966
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 171.7 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 164 MW |
Winter Capacity | 167 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1966 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Refined Coal |
---|---|
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Other Combustion Technology | Yes |
Subcritical Technology | Yes |
Other Planned Modifications | Yes |
Other Modifications | October 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating March 1969
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 272 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 263 MW |
Winter Capacity | 272 MW |
Minimum Load | 150 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1969 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Refined Coal |
---|---|
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Other Combustion Technology | Yes |
Subcritical Technology | Yes |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating May 1982
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 738 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 703 MW |
Winter Capacity | 714 MW |
Minimum Load | 170 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1982 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Refined Coal |
---|---|
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Other Planned Modifications | Yes |
Other Modifications | September 2025 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Thomas Hill Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Refined Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | FirstEnergy Harrison Power Station | Haywood, WV | 11.9 TWh |
#2 | Coal Creek | Underwood, ND | 7.7 TWh |
#4 | New Madrid | New Madrid, MO | 5.2 TWh |
#5 | Spiritwood Station | Spiritwood, ND | 181.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Thomas Hill.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Altona Solar, LLC | Centralia, MO | 7.8 GWh | 32.3 mi |
Chillicothe | Chillicothe, MO | 9.0 GWh | 51.8 mi |
Chillicothe Solar Farm | Chillicothe, MO | 4.2 GWh | 50.5 mi |
Clarence Cannon | Monroe City, MO | 94.2 GWh | 53 mi |
Columbia (MO) | Columbia, MO | 16.6 GWh | 44.1 mi |
Columbia Energy Center | Columbia, MO | 20.1 GWh | 41.9 mi |
La Plata | La Plata, MO | 19.0 MWh | 33.6 mi |
Macon Energy Center | Macon, MO | 87.3 GWh | 19.2 mi |
Macon Solar Power Project | Macon, MO | 4.2 GWh | 17.2 mi |
Marceline | Marceline, MO | 7.0 MWh | 19.9 mi |
Marshall (MO) | Marshall, MO | 1.7 GWh | 42.5 mi |
Marshall Solar Farm (MO) | Marshall, MO | 4.2 GWh | 44 mi |
Mexico | Mexico, MO | 12.7 MWh | 51.4 mi |
MJMEUC Generating Station #1 | Laddonia, MO | 110.4 GWh | 57.2 mi |
Moberly | Moberly, MO | 30.0 MWh | 12.1 mi |
MU Combined Heat and Power Plant | Columbia, MO | 190.5 GWh | 45 mi |
Shelbina Power #1 | Shelbina, MO | 7.0 MWh | 33 mi |
Shelbina Power #2 | Shelbina, MO | 31.0 MWh | 33 mi |
Shelbina Power #3 | Shelbina, MO | 8.0 MWh | 32.7 mi |
Truman Solar | Colombia, MO | 22.7 GWh | 46.3 mi |