Thomas A Smith Energy Facility
925 Loopers Bridge Road, Dalton, GA 30721Plant Summary Information
Thomas A Smith Energy Facility is ranked #22 out of 2,253 natural gas power plants nationwide in terms of total annual net electricity generation.
Thomas A Smith Energy Facility is comprised of 6 generators and generated 2.5 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Thomas A Smith Energy Facility |
---|---|
Utility Name | Oglethorpe Power Corporation |
Location | Murray County, GA |
Initial Operation Date | June 2002 |
Last Update | Aug 2024 |
Annual Generation | 8.5 TWh |
Annual Consumption | 68.5 M MMBtu |
Ranked #89 out of 11,835 Power Plants Nationwide | |
Ranked #22 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #5 out of 238 Georgia Power Plants | |
Ranked #2 out of 47 Georgia Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Thomas A Smith Energy Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Thomas A Smith Energy Facility.
Monthly Net Generation for Thomas A Smith Energy Facility
Thomas A Smith Energy Facility Details
Summary Information | |
---|---|
Plant Name | Thomas A Smith Energy Facility (55382) |
Plant Address | 925 Loopers Bridge Road, Dalton, GA 30721 |
Utility | Oglethorpe Power Corporation (13994) |
Latitude, Longitude | 34.7094, -84.9175 |
Generation Dates on File | Jun 2002 to Aug 2024 |
Initial Operation Date | June 2002 |
Annual Generation | 8.5 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 02-28-000 |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | |
Transmission / Distribution Owner | Georgia Power Co (7140) GA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | EAST TENNESSEE NATURAL GAS LLC |
Natural Gas Storage | No |
Generator 1GT1 Details Operating June 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 147 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 185 MW |
Winter Capacity | 190 MW |
Minimum Load | 90 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator 1GT2 Details Operating June 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 147 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 185 MW |
Winter Capacity | 190 MW |
Minimum Load | 90 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator 1STG Details Operating June 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | 1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 302 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 302 MW |
Winter Capacity | 311 MW |
Minimum Load | 90 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator 2GT1 Details Operating June 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 147 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 185 MW |
Winter Capacity | 190 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2GT2 Details Operating June 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 147 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 185 MW |
Winter Capacity | 190 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2STG Details Operating July 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | 2 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 302 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 302 MW |
Winter Capacity | 310 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Thomas A Smith Energy Facility Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#12 | Lackawanna Energy Center | Jessup, PA | 10.3 TWh |
#13 | Forney Energy Center | Forney, TX | 9.9 TWh |
#14 | Hanging Rock Energy Facility | Ironton, OH | 9.6 TWh |
#15 | Warren County | Front Royal, VA | 9.2 TWh |
#16 | Nine Mile Point | Westwego, LA | 8.9 TWh |
#17 | Fort Myers | Ft. Myers, FL | 8.9 TWh |
#18 | Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.9 TWh |
#19 | York Energy Center | Delta, PA | 8.8 TWh |
#20 | Sherwood H Smith Jr Energy Complex | Hamlet, NC | 8.8 TWh |
#21 | South Field Energy | Wellsville, OH | 8.5 TWh |
#23 | Sanford | DeBary, FL | 8.4 TWh |
#24 | Hummel Station LLC | Shamokin Dam, PA | 8.4 TWh |
#25 | Wansley Combined Cycle | Franklin, GA | 8.3 TWh |
#26 | Seminole (FL) | Palatka, FL | 11.1 TWh |
#27 | McIntosh Combined Cycle Facility | Rincon, GA | 8.2 TWh |
#28 | Brunswick County Power Station | Freeman, VA | 7.9 TWh |
#29 | Port Washington Generating Station | Port Washington, WI | 7.9 TWh |
#30 | Fairless Energy Center | Fairless Hills, PA | 7.8 TWh |
#31 | Indeck Niles Energy Center | Niles, MI | 7.7 TWh |
#32 | Moxie Freedom Generation Plant | Salem Township, PA | 7.7 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Thomas A Smith Energy Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allatoona | Cartersville, GA | 111.5 GWh | 39.2 mi |
Apalachia | Reliance, TN | 435.9 GWh | 47.4 mi |
Bartow Davidson | Cartersville, GA | 869.0 MWh | 31.6 mi |
Blue Ridge | Blue Ridge, GA | 21.2 GWh | 38 mi |
Bowen | Cartersville, GA | 11.0 TWh | 40.3 mi |
Carters | Chatsworth, GA | 7.4 GWh | 15.4 mi |
Chattanooga Metropolitan Airport Solar | Chattanooga, TN | 2.4 GWh | 27.3 mi |
Chickamauga | Chattanooga, TN | 657.3 GWh | 32.4 mi |
CS Murphy Point, LLC | Murphy, NC | 1.2 GWh | 46.8 mi |
Dalton 2 | Dalton, GA | 8.6 GWh | 1 mi |
Inland Paperboard Packaging Rome | Rome, GA | 358.0 GWh | 39.2 mi |
Murphy Farm Power, LLC | Culberson, NC | 1.2 GWh | 47.5 mi |
Murray Treadwell Farms | Chatsworth, GA | 6.4 GWh | 7.2 mi |
Nickajack | New Hope, TN | 509.6 GWh | 44.7 mi |
Ocoee 1 | Benton, TN | 69.8 GWh | 30.7 mi |
Ocoee 2 | Benton, TN | 80.7 GWh | 35.3 mi |
Ocoee 3 | Benton, TN | 141.4 GWh | 35.3 mi |
Rockmart | Rockmart, GA | 5.5 GWh | 48.4 mi |
Sequoyah | Soddy Daisy, TN | 17.5 TWh | 37.1 mi |
Volkswagen Solar System | Chattanooga, TN | 11.7 GWh | 29.3 mi |