The Dalles
3545 Bret Clodfelter Way, The Dalles, OR 97058Plant Summary Information
The Dalles is ranked #6 out of 1,371 hydroelectric power plants nationwide in terms of total annual net electricity generation.
The Dalles is comprised of 24 generators and generated 1.1 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | The Dalles |
---|---|
Utility Name | USACE Northwestern Division |
Location | Wasco County, OR |
Initial Operation Date | June 1957 |
Last Update | Sep 2024 |
Annual Generation | 5.4 TWh |
Annual Consumption | 19.5 M MMBtu |
Ranked #195 out of 11,852 Power Plants Nationwide | |
Ranked #6 out of 1,371 Water Power Plants Nationwide | |
Ranked #2 out of 255 Oregon Power Plants | |
Ranked #2 out of 60 Oregon Water Power Plants | |
Fuel Types | Water |
Map of The Dalles
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for The Dalles.
Monthly Net Generation for The Dalles
The Dalles Details
Summary Information | |
---|---|
Plant Name | The Dalles (3895) |
Plant Address | 3545 Bret Clodfelter Way, The Dalles, OR 97058 |
Utility | USACE Northwestern Division (19400) |
Latitude, Longitude | 45.614, -121.1346 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | June 1957 |
Annual Generation | 5.4 TWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Columbia River |
Ash Impoundment | No |
Transmission / Distribution Owner | Bonneville Power Administration (1738) OR |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating October 1957
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 78 MW |
Winter Capacity | 78 MW |
Minimum Load | 24.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1957 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 2 Details Operating November 1957
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 78 MW |
Winter Capacity | 78 MW |
Minimum Load | 24.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1957 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator F1 Details OA June 1957
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 14 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 14 MW |
Winter Capacity | 14 MW |
Minimum Load | 14 MW |
Uprate/Derate Completed | No |
Status | OA |
---|---|
First Operation Date | June 1957 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator F2 Details OA July 1957
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 14 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 14 MW |
Winter Capacity | 14 MW |
Minimum Load | 14 MW |
Uprate/Derate Completed | No |
Status | OA |
---|---|
First Operation Date | July 1957 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 5 Details Operating October 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 89.7 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 92.7 MW |
Winter Capacity | 92 MW |
Minimum Load | 24.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 6 Details Operating November 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 78 MW |
Winter Capacity | 78 MW |
Minimum Load | 24.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 3 Details Operating February 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 78 MW |
Winter Capacity | 78 MW |
Minimum Load | 24.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 4 Details OA May 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 78 MW |
Winter Capacity | 78 MW |
Minimum Load | 24.8 MW |
Uprate/Derate Completed | No |
Status | OA |
---|---|
First Operation Date | May 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 10 Details Operating November 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 78 MW |
Winter Capacity | 78 MW |
Minimum Load | 24.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 9 Details Operating November 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 78 MW |
Winter Capacity | 78 MW |
Minimum Load | 24.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 7 Details Operating February 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 78 MW |
Winter Capacity | 78 MW |
Minimum Load | 24.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 8 Details OA May 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 78 MW |
Winter Capacity | 78 MW |
Minimum Load | 24.8 MW |
Uprate/Derate Completed | No |
Status | OA |
---|---|
First Operation Date | May 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 14 Details Operating November 1960
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 78 MW |
Winter Capacity | 78 MW |
Minimum Load | 24.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1960 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 11 Details OA February 1960
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 78 MW |
Winter Capacity | 78 MW |
Minimum Load | 24.8 MW |
Uprate/Derate Completed | No |
Status | OA |
---|---|
First Operation Date | February 1960 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 12 Details Operating May 1960
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 78 MW |
Winter Capacity | 78 MW |
Minimum Load | 24.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1960 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 13 Details Operating August 1960
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 78 MW |
Winter Capacity | 78 MW |
Minimum Load | 24.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1960 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 21 Details Operating November 1973
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 86 MW |
Winter Capacity | 86 MW |
Minimum Load | 29 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1973 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 22 Details Operating December 1973
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 86 MW |
Winter Capacity | 86 MW |
Minimum Load | 29 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1973 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 15 Details Operating February 1973
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 86 MW |
Winter Capacity | 86 MW |
Minimum Load | 29 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1973 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 16 Details Operating February 1973
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 86 MW |
Winter Capacity | 86 MW |
Minimum Load | 29 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1973 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 17 Details Operating March 1973
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 86 MW |
Winter Capacity | 86 MW |
Minimum Load | 29 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1973 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 18 Details Operating March 1973
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 86 MW |
Winter Capacity | 86 MW |
Minimum Load | 29 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1973 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 19 Details Out of Service May 1973
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 86 MW |
Winter Capacity | 86 MW |
Minimum Load | 29 MW |
Status | Out of Service |
---|---|
First Operation Date | May 1973 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 20 Details Out of Service June 1973
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 86 MW |
Winter Capacity | 86 MW |
Minimum Load | 29 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
---|---|
First Operation Date | June 1973 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
The Dalles Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Robert Moses Niagara | Lewiston, NY | 15.8 TWh |
#2 | Grand Coulee | Grand Coulee, WA | 15.0 TWh |
#3 | Chief Joseph | Bridgeport, WA | 9.0 TWh |
#4 | Robert Moses Power Dam | Massena, NY | 7.5 TWh |
#5 | John Day | Rufus, OR | 6.9 TWh |
#7 | Rocky Reach | Wenatchee, WA | 4.8 TWh |
#8 | Wanapum | Beverly, WA | 4.0 TWh |
#9 | Priest Rapids | Mattawa, WA | 3.8 TWh |
#10 | McNary | Umatilla, OR | 3.6 TWh |
#11 | Bonneville | Cascade Locks, OR | 3.5 TWh |
#12 | Wells | Pateros, WA | 3.4 TWh |
#13 | Boundary | Metaline, WA | 3.1 TWh |
#14 | Glen Canyon Dam | Page, AZ | 2.8 TWh |
#15 | Edward C Hyatt | Oroville, CA | 2.4 TWh |
#16 | Shasta | Redding, CA | 2.4 TWh |
#17 | Wilson Dam | Muscle Shoals, AL | 2.2 TWh |
#18 | Garrison | Riverside, ND | 2.1 TWh |
#19 | Brownlee | Cambridge, ID | 2.1 TWh |
#20 | Oahe | Pierre, SD | 2.1 TWh |
#21 | Conowingo | Darlington, MD | 2.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding The Dalles.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Biglow Canyon Wind Farm | Wasco, OR | 949.7 GWh | 25.8 mi |
Copper Dam Plant | Hood River, OR | 15.6 GWh | 19.1 mi |
Dalles Dam North Fishway Project | The Dalles, OR | 41.6 GWh | 0.1 mi |
Golden Hill Wind | Wasco, OR | 590.4 GWh | 20.9 mi |
Goldendale Generating Station | Goldendale, WA | 2.2 TWh | 19.9 mi |
Goodnoe Hills | Goldendale, WA | 223.9 GWh | 31.8 mi |
Hay Canyon Wind Power LLC | Wasco, OR | 175.4 GWh | 27.9 mi |
John Day | Rufus, OR | 6.9 TWh | 22.4 mi |
Klondike Wind Power | Wasco, OR | 30.9 GWh | 28.5 mi |
Klondike Windpower II | Wasco, OR | 229.2 GWh | 26.4 mi |
Klondike Windpower III | Wasco, OR | 692.4 GWh | 30.5 mi |
Linden Wind Energy Project | Goldendale, WA | 116.7 GWh | 19.2 mi |
Middle Fork Irrigation District | Parkdale, OR | 20.2 GWh | 24.3 mi |
PaTu Wind Farm LLC | Wasco, OR | 25.5 GWh | 25 mi |
Peters Drive Plant | Hood River, OR | 6.3 GWh | 20.3 mi |
Star Point Wind Project LLC | Wasco, OR | 194.0 GWh | 32.5 mi |
Timothy Lake Powerhouse | Estacada, OR | 946.0 MWh | 34.5 mi |
Tuolumne Wind Project | Goldendale, WA | 329.8 GWh | 24.2 mi |
Windy Flats Wind Project | Centerville, WA | 567.8 GWh | 16.5 mi |
WyEast Solar | Wasco, OR | 19.6 GWh | 25.9 mi |