Texas Solar Nova 1
2465 County Road 233, Spur, TX 79370Plant Summary Information
Texas Solar Nova 1 is ranked #22 out of 5,655 solar farms nationwide in terms of total annual net electricity generation.
Texas Solar Nova 1 generated 210.0 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Texas Solar Nova 1 |
---|---|
Utility Name | Texas Solar Nova 1, LLC |
Location | Kent County, TX |
Initial Operation Date | December 2023 |
Last Update | Sep 2024 |
Annual Generation | 666.4 GWh |
Annual Consumption | 2.4 M MMBtu |
Ranked #1,010 out of 11,852 Power Plants Nationwide | |
Ranked #22 out of 5,655 Solar Power Plants Nationwide | |
Ranked #178 out of 754 Texas Power Plants | |
Ranked #9 out of 166 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Texas Solar Nova 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Texas Solar Nova 1.
Monthly Net Generation for Texas Solar Nova 1
Texas Solar Nova 1 Details
Summary Information | |
---|---|
Plant Name | Texas Solar Nova 1 (65654) |
Plant Address | 2465 County Road 233, Spur, TX 79370 |
Utility | Texas Solar Nova 1, LLC (64931) |
Latitude, Longitude | 33.32064, -100.9822 |
Generation Dates on File | May 2023 to Sep 2024 |
Initial Operation Date | December 2023 |
Annual Generation | 666.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | |
Transmission / Distribution Owner | Wind Energy Transmission Texas LLC (60066) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator TSN1 Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 252 MW |
Summer Capacity | 252 MW |
Winter Capacity | 252 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
East West Fixed Tilt | Yes |
Azimuth Angle | 25 |
Tilt Angle | 2 |
DC Net Capacity | 1.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Texas Solar Nova 1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#12 | Juno Solar Project | Lamesa, TX | 793.4 GWh |
#13 | Prospero Solar | Andrews, TX | 747.8 GWh |
#14 | Neptune Energy Center Hybrid | Boone, CO | 701.6 GWh |
#15 | Solar Star 2 | Rosamond, CA | 708.8 GWh |
#16 | Copper Mountain Solar 5, LLC | Boulder City, NV | 691.5 GWh |
#17 | Slate Hybrid | Stratford, CA | 665.0 GWh |
#18 | IP Radian, LLC | Brookesmith, TX | 681.1 GWh |
#19 | Agua Caliente Solar Project | Dateland, AZ | 675.2 GWh |
#20 | Prospero Solar II | Andrews, TX | 675.0 GWh |
#21 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 653.6 GWh |
#23 | Desert Sunlight 300, LLC | Desert Center, CA | 659.4 GWh |
#24 | Arlington Energy Center II | Blythe, CA | 628.1 GWh |
#25 | Silver State Solar Power South | Primm Valley, NV | 650.9 GWh |
#26 | Mojave Solar Project | Hinkley, CA | 627.0 GWh |
#27 | California Valley Solar Ranch | California Valley, CA | 623.8 GWh |
#28 | Stateline Solar | Nipton, CA | 618.5 GWh |
#29 | Arrow Canyon Solar Hybrid | Moapa, NV | 607.5 GWh |
#30 | Copper Mountain Solar 3 | Boulder City, NV | 615.4 GWh |
#31 | Moapa Southern Paiute | Moapa, NV | 615.1 GWh |
#32 | Genesis Solar Energy Project | Blythe, CA | 613.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Texas Solar Nova 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amadeus Wind Farm | Rotan, TX | 767.3 GWh | 34.4 mi |
BayWa r.e Mozart LLC | Jayton, TX | 59.1 GWh | 35.9 mi |
Brazos Wind Farm | Fluvanna, TX | 82.9 GWh | 27.5 mi |
Coyote Wind LLC | Snyder, TX | 609.9 GWh | 33.3 mi |
Dermott Wind | Snyder, TX | 889.4 GWh | 31.6 mi |
EG178 Facility | Snyder, TX | 686.9 GWh | 39.7 mi |
Fluvanna | Fluvanna, TX | 525.2 GWh | 28.4 mi |
Gopher Creek Wind Farm | Fluvanna, TX | 613.9 GWh | 33.5 mi |
Lorenzo Wind | Lorenzo, TX | 352.9 GWh | 40.8 mi |
Lumina II Solar Project | Snyder, TX | 553.5 GWh | 33.1 mi |
Lumina Solar Project | Snyder, TX | 573.9 GWh | 29 mi |
McAdoo Wind Energy LLC | McAdoo, TX | 395.1 GWh | 29.8 mi |
Pleasant Hill Wind Energy Project | Lorenzo, TX | 32.0 GWh | 40.9 mi |
Post Wind Farm LP | Fluvanna, TX | 311.7 GWh | 30.6 mi |
Ralls Wind Farm | Ralls, TX | 11.0 GWh | 33.2 mi |
Sage Draw Wind | Wilson, TX | 1.1 TWh | 39 mi |
Scurry County Wind LP | Snyder, TX | 233.6 GWh | 41.5 mi |
Tahoka Wind | Tahoka, TX | 1.1 TWh | 42 mi |
Texas Solar Nova 2 | Spur, TX | 375.9 GWh | 0 mi |
Wake Wind Energy Center | Floydada, TX | 954.0 GWh | 35.5 mi |