Terreva Wayne County RNG, LLC
460B South Landfill Road, Dudley, NC 28333Plant Summary Information
Terreva Wayne County RNG, LLC is ranked #14 out of 18 landfill gas power plants in North Carolina in terms of total annual net electricity generation.
Terreva Wayne County RNG, LLC is comprised of 2 generators and generated 3.0 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Terreva Wayne County RNG, LLC |
---|---|
Utility Name | Terreva Wayne County RNG, LLC |
Location | Wayne County, NC |
Initial Operation Date | December 2010 |
Last Update | Dec 2022 |
Annual Generation | 9.9 GWh |
Annual Consumption | 100.7 k MMBtu |
Ranked #5,915 out of 11,249 Power Plants Nationwide | |
Ranked #244 out of 297 Landfill Gas Power Plants Nationwide | |
Ranked #304 out of 858 North Carolina Power Plants | |
Ranked #14 out of 18 North Carolina Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Previous Operators |
MP Wayne LLC (2013 to 2019) Mas Wayne Co Power, LLC (2020 to 2021) Terreva Wayne County RNG, LLC (2022 to 2022) |
Map of Terreva Wayne County RNG, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Terreva Wayne County RNG, LLC.
Monthly Net Generation for Terreva Wayne County RNG, LLC
Terreva Wayne County RNG, LLC Details
Summary Information | |
---|---|
Plant Name | Terreva Wayne County RNG, LLC (57366) |
Plant Address | 460B South Landfill Road Dudley, NC 28333 |
Utility | Terreva Wayne County RNG, LLC (65245) |
Latitude, Longitude | 35.2889, -78.0703 |
Generation Dates on File | Dec 2010 to Dec 2022 |
Initial Operation Date | December 2010 |
Annual Generation | 9.9 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF 11-15 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 22.86 kV |
Energy Storage | No |
Generator 1A Details Operating December 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 1B Details Operating December 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Terreva Wayne County RNG, LLC Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#234 | Winnebago County Landfill Gas | Oshkosh, WI | 10.8 GWh |
#235 | Veolia ES Blackfoot Landfill Facility | Winslow, IN | 10.7 GWh |
#236 | Adrian Energy Associates LLC | Adrian, MI | 10.7 GWh |
#237 | Glades Pike Generation Plant | Somerset, PA | 10.7 GWh |
#238 | Santa Cruz Energy | Santa Cruz, CA | 10.6 GWh |
#239 | Nelson Gardens Landfill Gas to Energy | San Antonio, TX | 10.6 GWh |
#240 | Prairie Bluff | Houston, MS | 10.3 GWh |
#241 | Sonoma Central Landfill Phase II | Petaluma, CA | 10.1 GWh |
#242 | Flathead Landfill to Gas Energy Facility | Kalispell, MT | 9.9 GWh |
#243 | Sonoma Central Landfill Phase I | Petaluma, CA | 9.9 GWh |
#245 | St Joseph Landfill Generating Station | St Joseph, MO | 9.8 GWh |
#246 | Norther Tier Landfill | Burlington, PA | 9.8 GWh |
#247 | CII Methane Management IV, LLC | Smithfield, NC | 9.2 GWh |
#248 | MM Tulare Energy | Visalia, CA | 8.8 GWh |
#249 | Enoree Phase II Landfill Gas Recovery | Greer, SC | 8.7 GWh |
#250 | Frederick County LFGTE Facility | Winchester, VA | 8.7 GWh |
#251 | Roseburg LFG | Roseburg, OR | 8.3 GWh |
#252 | Ameresco Janesville | Janesville, WI | 8.1 GWh |
#253 | Morehead Generating Facility | Morehead, KY | 7.7 GWh |
#254 | Henrico | Glen Allen, VA | 7.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Terreva Wayne County RNG, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Belafonte | Calypso, NC | 7.1 GWh | 8.9 mi |
Blueberry One | Grantham, NC | 10.1 GWh | 5 mi |
Eros Solar, LLC | Mt Olive, NC | 10.7 GWh | 8.6 mi |
Harrell's Hill Solar Center LLC | Mt. Olive, NC | 9.3 GWh | 5.6 mi |
Lane II Solar, LLC | Goldsboro, NC | 11.4 GWh | 7.7 mi |
Lane Solar | Goldsboro, NC | 10.4 GWh | 7.4 mi |
Lee Combined Cycle Plant | Goldsboro, NC | 6.6 TWh | 6 mi |
Mount Olive Farm | Mount Olive, NC | 10.3 GWh | 6 mi |
Mount Olive Solar | Mount Olive, NC | 3.6 GWh | 7.7 mi |
Mt Olive Farm 2 | Mt Olive, NC | 9.9 GWh | 4.9 mi |
Mt Olive Solar 1 | Mt. Olive, NC | 9.4 GWh | 7.6 mi |
Oakwood Solar | Mebane, NC | 10.8 GWh | 0.8 mi |
Overman Solar | Goldsboro, NC | 11.4 GWh | 0.8 mi |
Robin Solar | Dudley, NC | 8.8 GWh | 1.8 mi |
Ruskin Solar | Dudley, NC | 4.2 GWh | 2.9 mi |
Solar Lee, LLC | Mount Olive, NC | 9.8 GWh | 7.2 mi |
Summit Solar | Mount Olive, NC | 713.0 MWh | 4.6 mi |
Wayne County | Goldsboro, NC | 574.3 GWh | 6.2 mi |
Wayne Solar I LLC | Mount Olive, NC | 7.8 GWh | 5.5 mi |
Wayne Solar II LLC | Goldsboro, NC | 8.7 GWh | 1.9 mi |