Tennessee Eastman Operations
Eastman Road and Lincoln St, Kingsport, TN 37662Plant Summary Information
Tennessee Eastman Operations is ranked #10 out of 84 power plants in Tennessee in terms of total annual net electricity generation.
Tennessee Eastman Operations is comprised of 19 generators and generated 305.7 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Tennessee Eastman Operations |
---|---|
Utility Name | Eastman Chemical Co-TN Ops |
Location | Sullivan County, TN |
Initial Operation Date | September 1936 |
Last Update | Aug 2024 |
Annual Generation | 1.1 TWh |
Annual Consumption | 45.0 M MMBtu |
Ranked #691 out of 11,835 Power Plants Nationwide | |
Ranked #529 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #10 out of 84 Tennessee Power Plants | |
Ranked #5 out of 16 Tennessee Natural Gas Power Plants | |
Fuel Types | Natural Gas : 53.9% Bituminous Coal : 44.4% Other Gas : 1.0% Sludge Waste : 0.7% |
Map of Tennessee Eastman Operations
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tennessee Eastman Operations.
Monthly Net Generation for Tennessee Eastman Operations
Tennessee Eastman Operations Details
Summary Information | |
---|---|
Plant Name | Tennessee Eastman Operations (50481) |
Plant Address | Eastman Road and Lincoln St, Kingsport, TN 37662 |
Utility | Eastman Chemical Co-TN Ops (5610) |
Latitude, Longitude | 36.5219, -82.5431 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | September 1936 |
Annual Generation | 1.1 TWh |
Fuel Types | Natural Gas : 53.9% Bituminous Coal : 44.4% Other Gas : 1.0% Sludge Waste : 0.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 92-13-000, 92-13-001 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Chemical Manufacturing (325) |
Sector | Industrial CHP (7) |
Water Source | South Fork - Holston River |
Ash Impoundment | No |
Transmission / Distribution Owner | Kingsport Power Co (10331) TN |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | EAST TENNESSEE NATURAL GAS LLC |
Natural Gas Storage | No |
Generator TGO7 Details Operating September 1936
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 6 MW |
Winter Capacity | 6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1936 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Bituminous Coal / Natural Gas / Sludge Waste / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TGO8 Details Operating September 1939
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 6 MW |
Nameplate Power Factor | 0.86 |
Summer Capacity | 6 MW |
Winter Capacity | 6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1939 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Bituminous Coal / Natural Gas / Sludge Waste / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TGO9 Details Operating July 1941
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 6 MW |
Winter Capacity | 6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1941 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Bituminous Coal / Natural Gas / Sludge Waste / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG10 Details Operating February 1946
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 6 MW |
Winter Capacity | 6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1946 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Bituminous Coal / Natural Gas / Sludge Waste / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG11 Details Operating May 1949
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 6 MW |
Winter Capacity | 6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1949 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | B |
Energy Source | Bituminous Coal / Natural Gas / Sludge Waste / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG12 Details Operating February 1953
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 6 MW |
Winter Capacity | 6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1953 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | B |
Energy Source | Bituminous Coal / Natural Gas / Sludge Waste / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG13 Details Operating January 1960
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 7 MW |
Winter Capacity | 7 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1960 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Bituminous Coal / Sludge Waste / Other Fuel / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG14 Details Operating April 1962
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1962 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | B |
Energy Source | Bituminous Coal / Natural Gas / Sludge Waste / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG15 Details Operating October 1963
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 7.5 MW |
Winter Capacity | 7.5 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1963 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Bituminous Coal / Sludge Waste / Other Fuel / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG17 Details Operating October 1966
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 10.4 MW |
Winter Capacity | 10.4 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1966 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG16 Details Operating July 1966
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 10.4 MW |
Winter Capacity | 10.4 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1966 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG18 Details Operating July 1967
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 10.4 MW |
Winter Capacity | 10.4 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1967 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG21 Details Operating July 1969
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 15 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 15 MW |
Winter Capacity | 15 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1969 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | B |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG19 Details Operating March 1970
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 10.4 MW |
Winter Capacity | 10.4 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1970 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG20 Details Operating April 1972
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 10.4 MW |
Winter Capacity | 10.4 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1972 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG22 Details Operating September 1982
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 15.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 15.4 MW |
Winter Capacity | 15.4 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1982 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Bituminous Coal / Natural Gas / Other Gas / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG24 Details Operating July 1983
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 16.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 16.8 MW |
Winter Capacity | 16.8 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1983 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | B |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG26 Details Operating October 1994
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 16.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 16.6 MW |
Winter Capacity | 16.6 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1994 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
---|---|
Energy Source | Bituminous Coal / Natural Gas / Other Gas / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Supercritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG25 Details Operating December 1994
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 18 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18 MW |
Winter Capacity | 18 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1994 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Bituminous Coal / Natural Gas / Other Gas / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Tennessee Eastman Operations Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#519 | Vandolah Power Station | Wauchula, FL | 614.8 GWh |
#520 | Morris Cogeneration LLC | Morris, IL | 611.4 GWh |
#521 | Alliant Energy Neenah | Neenah, WI | 610.1 GWh |
#522 | Masspower | Indian Orchard, MA | 609.1 GWh |
#523 | Gary Works | Gary, IN | 1.2 TWh |
#524 | Belle River | China Twp, MI | 6.0 TWh |
#525 | John R Kelly | Gainesville, FL | 603.3 GWh |
#526 | Hunlock Power Station | Hunlok Creek, PA | 603.0 GWh |
#527 | SCA Cogen 2 | Sacramento, CA | 598.8 GWh |
#528 | Freeport LP Pretreatment Facility | Freeport, TX | 598.3 GWh |
#530 | Riverside Generating LLC | Catlettsburg, KY | 595.1 GWh |
#531 | Bethpage Power Plant | Hicksville, NY | 594.8 GWh |
#532 | Dean | East China, MI | 589.1 GWh |
#533 | BASF Freeport Works | Feeeport, TX | 588.6 GWh |
#534 | Ocotillo | Tempe, AZ | 583.7 GWh |
#535 | NAFTA Region Olefins Complex Cogen Fac | Port Arthur, TX | 582.0 GWh |
#536 | Beatrice | Beatrice, NE | 579.6 GWh |
#537 | Mustang | Oklahoma City, OK | 575.4 GWh |
#538 | Hawk Road Facility | Franklin, GA | 569.4 GWh |
#539 | Vermillion Energy Facility | Cayuga, IN | 568.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tennessee Eastman Operations.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boone Dam | Kingsport, TN | 153.2 GWh | 8.1 mi |
Bristol Plant | Bristol, VA | 2.3 GWh | 22.9 mi |
Buchanan Generation LLC | Keen Mountain, VA | 329.2 GWh | 55.4 mi |
Cherokee Dam | Rudledge, TN | 301.3 GWh | 58.5 mi |
Clinch River | Cleveland, VA | 181.5 GWh | 34.2 mi |
Domtar Kingsport Mill | Kingsport, TN | 171.8 GWh | 2.3 mi |
Fort Patrick Henry | Kingsport, TN | 94.4 GWh | 2.5 mi |
Hot Springs Energy Storage & Microgrid | Hot Springs, NC | 1.9 GWh | 46.4 mi |
John Sevier | Rogersville, TN | 3.9 TWh | 25.4 mi |
Mountain Home Energy Center | Mountain Home, TN | 4.6 GWh | 17.3 mi |
Powell Valley | Kyles Ford, TN | 66.0 MWh | 27.4 mi |
South Holston | Bristol, TN | 94.6 GWh | 25.1 mi |
SR Greenville I | Limestone, TN | 10.3 GWh | 17.9 mi |
SR Greenville II | Greeneville, TN | 10.2 GWh | 25.4 mi |
SR Jonesborough | Jonesborough, TN | 7.6 GWh | 18.7 mi |
SR Washington I, LLC | Jonesborough, TN | 20.2 GWh | 12.4 mi |
Virginia City Hybrid Energy Center | St. Paul, VA | 854.9 GWh | 29.5 mi |
Watauga | Elizabethton, TN | 113.0 GWh | 26.3 mi |
Wilbur | Elizabethon, TN | 13.4 GWh | 26.3 mi |
Wolf Hills Energy | Bristol, VA | 77.1 GWh | 26.3 mi |