Tenaska Georgia Generation Facility

2100 George Brown Road, Franklin, GA 30217

Plant Summary Information

Tenaska Georgia Generation Facility is ranked #47 out of 238 power plants in Georgia in terms of total annual net electricity generation.

Tenaska Georgia Generation Facility is comprised of 6 generators and generated 11.8 GWh during the 3-month period between February 2024 to May 2024.

Plant NameTenaska Georgia Generation Facility
Utility NameTenaska Georgia Partners LP
LocationHeard County, GA
Initial Operation DateJune 2001
Last Update May 2024
Annual Generation 214.0 GWh
Annual Consumption 2.6 M MMBtu
Ranked #2,228 out of 11,835 Power Plants Nationwide
Ranked #733 out of 2,253 Natural Gas Power Plants Nationwide
Ranked #47 out of 238 Georgia Power Plants
Ranked #15 out of 47 Georgia Natural Gas Power Plants
Fuel Types Natural Gas : 97.4% Distillate Fuel Oil : 2.6%

Map of Tenaska Georgia Generation Facility

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tenaska Georgia Generation Facility.

Create Your Account Today

Monthly Net Generation for Tenaska Georgia Generation Facility

Tenaska Georgia Generation Facility Details

Summary Information
Plant NameTenaska Georgia Generation Facility (55061)
Plant Address2100 George Brown Road, Franklin, GA 30217
UtilityTenaska Georgia Partners LP (18535)
Latitude, Longitude33.3516, -84.9996
Generation Dates on FileJun 2001 to May 2024
Initial Operation DateJune 2001
Annual Generation 214.0 GWh
Fuel Types Natural Gas : 97.4% Distillate Fuel Oil : 2.6%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket Number99-160-000
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionSERC
Balancing AuthoritySouthern Company Services, Inc. - Trans (SOCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water SourceHeard County Water Authority
Ash Impoundment No
Transmission / Distribution OwnerGeorgia Power Co (7140) GA
Grid Voltage 500.00 kV
Energy StorageNo
 
Natural Gas Information
Pipeline Name Other - Please explain in pipeline notes below.
Pipeline NotesWILLIAMS TRANSCONTINENTAL
Natural Gas StorageNo

Generator GTG1 Details Operating June 2001

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipJointly Owned
RTO ISO LMP Node DesignationSOCO
RTO ISO Location Designation For Reporting Wholesale Sales DataSOCO
Nameplate Capacity183.2 MW
Nameplate Power Factor0.9
Summer Capacity157.5 MW
Winter Capacity157.5 MW
Minimum Load90 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2001
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas157.5 MW
Net Winter Capacity With Natural Gas157.5 MW
Net Winter Capacity With Oil165.8 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes

Generator GTG3 Details Operating June 2001

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipJointly Owned
RTO ISO LMP Node DesignationSOCO
RTO ISO Location Designation For Reporting Wholesale Sales DataSOCO
Nameplate Capacity183.2 MW
Nameplate Power Factor0.9
Summer Capacity157.5 MW
Winter Capacity157.5 MW
Minimum Load90 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2001
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas157.5 MW
Net Winter Capacity With Natural Gas157.5 MW
Net Winter Capacity With Oil165.8 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes

Generator GTG2 Details Operating August 2001

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipJointly Owned
RTO ISO LMP Node DesignationSOCO
RTO ISO Location Designation For Reporting Wholesale Sales DataSOCO
Nameplate Capacity183.2 MW
Nameplate Power Factor0.9
Summer Capacity157.5 MW
Winter Capacity157.5 MW
Minimum Load90 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 2001
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas157.5 MW
Net Winter Capacity With Natural Gas157.5 MW
Net Winter Capacity With Oil165.8 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes

Generator GTG4 Details Operating June 2002

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipJointly Owned
RTO ISO LMP Node DesignationSOCO
RTO ISO Location Designation For Reporting Wholesale Sales DataSOCO
Nameplate Capacity183.2 MW
Nameplate Power Factor0.9
Summer Capacity157.5 MW
Winter Capacity157.5 MW
Minimum Load90 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2002
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas157.5 MW
Net Winter Capacity With Natural Gas157.5 MW
Net Winter Capacity With Oil165.8 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes

Generator GTG5 Details Operating June 2002

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipJointly Owned
RTO ISO LMP Node DesignationSOCO
RTO ISO Location Designation For Reporting Wholesale Sales DataSOCO
Nameplate Capacity183.2 MW
Nameplate Power Factor0.9
Summer Capacity157.5 MW
Winter Capacity157.5 MW
Minimum Load90 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2002
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas157.5 MW
Net Winter Capacity With Natural Gas157.5 MW
Net Winter Capacity With Oil165.8 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes

Generator GTG6 Details Operating June 2002

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipJointly Owned
RTO ISO LMP Node DesignationSOCO
RTO ISO Location Designation For Reporting Wholesale Sales DataSOCO
Nameplate Capacity183.2 MW
Nameplate Power Factor0.9
Summer Capacity157.5 MW
Winter Capacity157.5 MW
Minimum Load90 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2002
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas157.5 MW
Net Winter Capacity With Natural Gas157.5 MW
Net Winter Capacity With Oil165.8 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes

Tenaska Georgia Generation Facility Plant Owners

Owner NameAddressGeneratorOwnership
Tenaska Georgia I LP14302 FNB Parkway, Omaha, NE 68154Generator GTG199.00%
Tenaska Georgia Inc14302 FNB Parkway, Omaha, NE 68154Generator GTG10.35%
Diamond Georgia LLC14302 FNB Parkway, Omaha, NE 68154Generator GTG10.30%
Georgia TC GP LLC14302 FNB Parkway, Omaha, NE 68154Generator GTG10.35%
Tenaska Georgia I LP14302 FNB Parkway, Omaha, NE 68154Generator GTG299.00%
Tenaska Georgia Inc14302 FNB Parkway, Omaha, NE 68154Generator GTG20.35%
Diamond Georgia LLC14302 FNB Parkway, Omaha, NE 68154Generator GTG20.30%
Georgia TC GP LLC14302 FNB Parkway, Omaha, NE 68154Generator GTG20.35%
Tenaska Georgia I LP14302 FNB Parkway, Omaha, NE 68154Generator GTG399.00%
Tenaska Georgia Inc14302 FNB Parkway, Omaha, NE 68154Generator GTG30.35%
Diamond Georgia LLC14302 FNB Parkway, Omaha, NE 68154Generator GTG30.30%
Georgia TC GP LLC14302 FNB Parkway, Omaha, NE 68154Generator GTG30.35%
Tenaska Georgia I LP14302 FNB Parkway, Omaha, NE 68154Generator GTG499.00%
Tenaska Georgia Inc14302 FNB Parkway, Omaha, NE 68154Generator GTG40.35%
Diamond Georgia LLC14302 FNB Parkway, Omaha, NE 68154Generator GTG40.30%
Georgia TC GP LLC14302 FNB Parkway, Omaha, NE 68154Generator GTG40.35%
Tenaska Georgia I LP14302 FNB Parkway, Omaha, NE 68154Generator GTG599.00%
Tenaska Georgia Inc14302 FNB Parkway, Omaha, NE 68154Generator GTG50.35%
Diamond Georgia LLC14302 FNB Parkway, Omaha, NE 68154Generator GTG50.30%
Georgia TC GP LLC14302 FNB Parkway, Omaha, NE 68154Generator GTG50.35%
Tenaska Georgia I LP14302 FNB Parkway, Omaha, NE 68154Generator GTG699.00%
Tenaska Georgia Inc14302 FNB Parkway, Omaha, NE 68154Generator GTG60.35%
Diamond Georgia LLC14302 FNB Parkway, Omaha, NE 68154Generator GTG60.30%
Georgia TC GP LLC14302 FNB Parkway, Omaha, NE 68154Generator GTG60.35%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#723UCLA So Campus Cogen ProjectLos Angeles, CA214.4 GWh
#724TulsaTulsa, OK214.3 GWh
#725Essential Power Rock Springs LLCRising Sun, MD213.7 GWh
#726Cass CountyPlattsmouth, NE210.4 GWh
#727Saguaro PowerHenderson, NV210.4 GWh
#728PerrymanHarford County, MD220.2 GWh
#729Milford Power LPMilford, MA210.3 GWh
#730Silver CreekPrentiss, MS210.2 GWh
#731Exelon West Medway II LLCMedway, MA210.2 GWh
#732Mead Coated BoardMahrt, AL758.7 GWh
#734University Park NorthUniversity Park, IL208.2 GWh
#735Texas PetrochemicalsHouston, TX236.3 GWh
#736A.J. Mihm Generating StationPelkie, MI207.9 GWh
#737Crossroads Energy CenterClarksdale, MS207.9 GWh
#738Hartwell Energy FacilityHartwell, GA207.1 GWh
#739Calvert CityCalvert City, KY206.7 GWh
#740Agua FriaGlendale, AZ197.1 GWh
#741Mass Inst Tech Cntrl Utilities/Cogen PltCambridge, MA204.5 GWh
#742Groton Generation StationGroton, SD201.9 GWh
#743AES Alamitos LLCLong Beach, CA201.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Tenaska Georgia Generation Facility.

Plant NamePlant LocationAnnual GenerationDistance
Atlanta Falcons SolarAtlanta, GA1.1 GWh44.3 mi
Camp Solar PlantWoodbury, GA3.2 GWh37.5 mi
Chattahoochee Energy FacilityFranklin, GA3.3 TWh4.5 mi
GreenvilleGreenville, GA1.4 GWh26.8 mi
Harris DamLineville, AL128.9 GWh36.2 mi
Harris ShilohShiloh, GA4.3 GWh42.1 mi
Hawk Road FacilityFranklin, GA569.4 GWh0.7 mi
Jack McDonoughSmyrna, GA18.3 TWh44.4 mi
Kimberly-Clark SolarLaGrange, GA2.7 GWh24.4 mi
LaFayette Solar FarmLaFayette, AL166.8 GWh39.8 mi
MAS ASB Cogen PlantAtlanta, GA39.2 GWh40.7 mi
Meriwether JacksonMachester, GA5.9 GWh38.7 mi
Sewell Creek EnergyCedartown, GA425.2 GWh44.2 mi
Troup RC50Pine Mountain, GA4.6 GWh32.7 mi
Troup RC50 IIPine Mountain, GA2.9 GWh31.9 mi
Turnipseed Solar, LLCDouglasville, GA5.2 GWh30.3 mi
Wansley Combined CycleFranklin, GA8.3 TWh4.4 mi
Wansley Unit 9Franklin, GA3.2 TWh4.6 mi
West Point (GA)West Point, GA198.7 GWh31.9 mi
YatesNewnan, GA2.2 TWh9.6 mi