Tenaska Georgia Generation Facility
2100 George Brown Road, Franklin, GA 30217Plant Summary Information
Tenaska Georgia Generation Facility is ranked #19 out of 46 natural gas power plants in Georgia in terms of total annual net electricity generation.
Tenaska Georgia Generation Facility is comprised of 6 generators and generated 13.9 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Tenaska Georgia Generation Facility |
---|---|
Utility Name | Tenaska Georgia Partners LP |
Location | Heard County, GA |
Initial Operation Date | June 2001 |
Last Update | Feb 2024 |
Annual Generation | 248.0 GWh |
Annual Consumption | 2.7 M MMBtu |
Ranked #2,087 out of 11,249 Power Plants Nationwide | |
Ranked #691 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #51 out of 218 Georgia Power Plants | |
Ranked #19 out of 46 Georgia Natural Gas Power Plants | |
Fuel Types | Natural Gas : 97.8% Distillate Fuel Oil : 2.2% |
Map of Tenaska Georgia Generation Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tenaska Georgia Generation Facility.
Monthly Net Generation for Tenaska Georgia Generation Facility
Tenaska Georgia Generation Facility Details
Summary Information | |
---|---|
Plant Name | Tenaska Georgia Generation Facility (55061) |
Plant Address | 2100 George Brown Road Franklin, GA 30217 |
Utility | Tenaska Georgia Partners LP (18535) |
Latitude, Longitude | 33.3516, -84.9996 |
Generation Dates on File | Jun 2001 to Feb 2024 |
Initial Operation Date | June 2001 |
Annual Generation | 248.0 GWh |
Fuel Types | Natural Gas : 97.8% Distillate Fuel Oil : 2.2% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 99-160-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Heard County Water Authority |
Ash Impoundment | No |
Transmission / Distribution Owner | Georgia Power Co (7140) GA |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | Other - Please explain in pipeline notes below. |
Pipeline Notes | WILLIAMS TRANSCONTINENTAL |
Natural Gas Storage | No |
Generator GTG1 Details Operating June 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | SOCO |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SOCO |
Nameplate Capacity | 183.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 157.5 MW |
Winter Capacity | 157.5 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 157.5 MW |
Net Winter Capacity With Natural Gas | 157.5 MW |
Net Winter Capacity With Oil | 165.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator GTG3 Details Operating June 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | SOCO |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SOCO |
Nameplate Capacity | 183.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 157.5 MW |
Winter Capacity | 157.5 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 157.5 MW |
Net Winter Capacity With Natural Gas | 157.5 MW |
Net Winter Capacity With Oil | 165.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator GTG2 Details Operating August 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | SOCO |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SOCO |
Nameplate Capacity | 183.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 157.5 MW |
Winter Capacity | 157.5 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 157.5 MW |
Net Winter Capacity With Natural Gas | 157.5 MW |
Net Winter Capacity With Oil | 165.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator GTG4 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | SOCO |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SOCO |
Nameplate Capacity | 183.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 157.5 MW |
Winter Capacity | 157.5 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 157.5 MW |
Net Winter Capacity With Natural Gas | 157.5 MW |
Net Winter Capacity With Oil | 165.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator GTG5 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | SOCO |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SOCO |
Nameplate Capacity | 183.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 157.5 MW |
Winter Capacity | 157.5 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 157.5 MW |
Net Winter Capacity With Natural Gas | 157.5 MW |
Net Winter Capacity With Oil | 165.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator GTG6 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | SOCO |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SOCO |
Nameplate Capacity | 183.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 157.5 MW |
Winter Capacity | 157.5 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 157.5 MW |
Net Winter Capacity With Natural Gas | 157.5 MW |
Net Winter Capacity With Oil | 165.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Tenaska Georgia Generation Facility Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Tenaska Georgia I LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 99.00% |
Tenaska Georgia Inc | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 0.35% |
Diamond Georgia LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 0.30% |
Georgia TC GP LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 0.35% |
Tenaska Georgia I LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 99.00% |
Tenaska Georgia Inc | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 0.35% |
Diamond Georgia LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 0.30% |
Georgia TC GP LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 0.35% |
Tenaska Georgia I LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 99.00% |
Tenaska Georgia Inc | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 0.35% |
Diamond Georgia LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 0.30% |
Georgia TC GP LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 0.35% |
Tenaska Georgia I LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG4 | 99.00% |
Tenaska Georgia Inc | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG4 | 0.35% |
Diamond Georgia LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG4 | 0.30% |
Georgia TC GP LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG4 | 0.35% |
Tenaska Georgia I LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG5 | 99.00% |
Tenaska Georgia Inc | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG5 | 0.35% |
Diamond Georgia LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG5 | 0.30% |
Georgia TC GP LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG5 | 0.35% |
Tenaska Georgia I LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG6 | 99.00% |
Tenaska Georgia Inc | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG6 | 0.35% |
Diamond Georgia LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG6 | 0.30% |
Georgia TC GP LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG6 | 0.35% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#681 | Kimberly Clark-Unit 1,2,3 | New Milford, CT | 256.5 GWh |
#682 | Sylvarena | Raleigh, MS | 256.3 GWh |
#683 | Ormond Beach | Oxnard, CA | 255.9 GWh |
#684 | Paris (WI) | Union Grove, WI | 255.6 GWh |
#685 | Dearborn Energy Center | Dearborn, MI | 251.0 GWh |
#686 | Central Utility Plant Cincinnati | Cincinnati, OH | 250.3 GWh |
#687 | Salinas River Cogeneration | San Ardo, CA | 249.0 GWh |
#688 | PSEG Kearny Generating Station | Kearny, NJ | 245.4 GWh |
#689 | Audrain Generating Station | Vandalia, MO | 243.6 GWh |
#690 | El Dorado Refinery | El Dorado, KS | 243.0 GWh |
#692 | University of California San Diego Hybrid | La Jolla, CA | 241.9 GWh |
#693 | University of Michigan | Ann Arbor, MI | 242.0 GWh |
#694 | A.J. Mihm Generating Station | Pelkie, MI | 240.9 GWh |
#695 | Eagle Point Power Generation | Westville, NJ | 245.2 GWh |
#696 | Masspower | Indian Orchard, MA | 240.1 GWh |
#697 | Bennett Mountain | Mountain Home, ID | 239.8 GWh |
#698 | Valero Wilmington Cogeneration Plant | Wilmington, CA | 239.2 GWh |
#699 | Ingredion Incorporated | Bedford Park, IL | 236.1 GWh |
#700 | Port Arthur Texas Refinery | Port Arthur, TX | 236.0 GWh |
#701 | Perryman | Harford County, MD | 245.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tenaska Georgia Generation Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Atlanta Falcons Solar | Atlanta, GA | 1.3 GWh | 44.3 mi |
Camp Solar Plant | Woodbury, GA | 4.0 GWh | 37.5 mi |
Chattahoochee Energy Facility | Franklin, GA | 3.8 TWh | 4.5 mi |
Greenville | Greenville, GA | 1.5 GWh | 26.8 mi |
Harris Dam | Lineville, AL | 176.7 GWh | 36.2 mi |
Harris Shiloh | Shiloh, GA | 4.6 GWh | 42.1 mi |
Hawk Road Facility | Franklin, GA | 812.7 GWh | 0.7 mi |
Jack McDonough | Smyrna, GA | 19.3 TWh | 44.4 mi |
Kimberly-Clark Solar | LaGrange, GA | 4.5 GWh | 24.4 mi |
LaFayette Solar Farm | LaFayette, AL | 179.8 GWh | 39.8 mi |
MAS ASB Cogen Plant | Atlanta, GA | 47.2 GWh | 40.7 mi |
Meriwether Jackson | Machester, GA | 6.5 GWh | 38.7 mi |
Sewell Creek Energy | Cedartown, GA | 455.2 GWh | 44.2 mi |
Troup RC50 | Pine Mountain, GA | 5.1 GWh | 32.7 mi |
Troup RC50 II | Pine Mountain, GA | 3.3 GWh | 31.9 mi |
Turnipseed Solar, LLC | Douglasville, GA | 5.3 GWh | 30.3 mi |
Wansley Combined Cycle | Franklin, GA | 9.5 TWh | 4.4 mi |
Wansley Unit 9 | Franklin, GA | 3.1 TWh | 4.6 mi |
West Point (GA) | West Point, GA | 234.9 GWh | 31.9 mi |
Yates | Newnan, GA | 1.5 TWh | 9.6 mi |