Techren Solar IV LLC
15103 Highway US 95 South, Boulder, NV 89005Plant Summary Information
Techren Solar IV LLC is ranked #35 out of 60 solar farms in Nevada in terms of total annual net electricity generation.
Techren Solar IV LLC generated 14.9 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Techren Solar IV LLC |
---|---|
Utility Name | Techren Solar IV LLC |
Location | Clark County, NV |
Initial Operation Date | October 2020 |
Last Update | Oct 2024 |
Annual Generation | 58.5 GWh |
Annual Consumption | 216.5 k MMBtu |
Ranked #3,707 out of 11,866 Power Plants Nationwide | |
Ranked #748 out of 5,672 Solar Power Plants Nationwide | |
Ranked #74 out of 109 Nevada Power Plants | |
Ranked #35 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Map of Techren Solar IV LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Techren Solar IV LLC.
Monthly Net Generation for Techren Solar IV LLC
Techren Solar IV LLC Details
Summary Information | |
---|---|
Plant Name | Techren Solar IV LLC (61932) |
Plant Address | 15103 Highway US 95 South, Boulder, NV 89005 |
Utility | Techren Solar IV LLC (61535) |
Latitude, Longitude | 35.89266, -114.93653 |
Generation Dates on File | Sep 2020 to Oct 2024 |
Initial Operation Date | October 2020 |
Annual Generation | 58.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG17-76-000, EG17137-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator TECH4 Details Operating October 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NSO_2_N008 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSO_2_N008 |
Nameplate Capacity | 25 MW |
Summer Capacity | 25 MW |
Winter Capacity | 25 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 33 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Techren Solar IV LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#738 | Midway Solar Farm II | Calipatria, CA | 61.7 GWh |
#739 | Techren Solar III LLC | Boulder, NV | 61.5 GWh |
#740 | Bison Solar LLC | Wellington, CO | 61.4 GWh |
#741 | Copperhead Solar, LLC | Riesel, TX | 60.3 GWh |
#742 | Robin Hollow Solar | West Greenwich, RI | 61.0 GWh |
#743 | Prairie Creek Solar | Jacksonville, IL | 61.0 GWh |
#744 | Pawpaw Solar Plant | Butler, GA | 60.9 GWh |
#745 | Dry Bridge Solar (Brown University) | North Kingstown, RI | 60.8 GWh |
#746 | Kawailoa Solar | Haleiwa, HI | 59.0 GWh |
#747 | AES Waikoloa Solar Hybrid | Waikoloa Village, HI | 59.4 GWh |
#749 | Hayworth Solar | Edison, CA | 58.4 GWh |
#750 | Waiawa Solar Power Hybrid | Waipahu, HI | 57.7 GWh |
#751 | Caden Energix Hickory LLC | Chesapeake, VA | 57.9 GWh |
#752 | Willowbrook Solar I, LLC | Morystown, OH | 57.4 GWh |
#753 | Gulf Coast Solar Center I | Valparaiso, FL | 57.3 GWh |
#754 | Cimarron Solar Facility | Springer, NM | 57.0 GWh |
#755 | Sunray 2 | Daggett, CA | 56.7 GWh |
#756 | Webberville Solar Project | Manor, TX | 56.4 GWh |
#757 | Kingbird A Solar LLC | Rosamond, CA | 56.2 GWh |
#758 | Bonnie Mine Solar | Bartow, FL | 55.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Techren Solar IV LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boulder Solar II, LLC | Boulder City, NV | 124.4 GWh | 3 mi |
CM10 | Boulder City, NV | 19.2 GWh | 7.9 mi |
CM48 | Boulder City, NV | 93.3 GWh | 8.3 mi |
Copper Mountain Solar 2 | Boulder City, NV | 348.7 GWh | 7.5 mi |
Copper Mountain Solar 3 | Boulder City, NV | 612.5 GWh | 1.2 mi |
Copper Mountain Solar 4, LLC | Boulder City, NV | 214.2 GWh | 7.9 mi |
Copper Mountain Solar 5, LLC | Boulder City, NV | 671.5 GWh | 8.3 mi |
Desert Star Energy Center | Boulder City, NV | 1.1 TWh | 7.9 mi |
Dignity - Siena Campus | Henderson, NV | 2.9 GWh | 12.6 mi |
Hoover Dam (AZ) | Boulder City, AZ | 1.5 TWh | 14 mi |
Hoover Dam (NV) | Boulder City, NV | 1.4 TWh | 14 mi |
IGS LAS1 | Henderson, NV | 1.0 GWh | 12.9 mi |
Nevada Solar One | Boulder City, NV | 92.9 GWh | 6.9 mi |
River Mountains Solar | Henderson, NV | 28.9 GWh | 9.6 mi |
Saguaro Power | Henderson, NV | 213.3 GWh | 11.1 mi |
Techren Solar I LLC | Boulder, NV | 199.7 GWh | 3.6 mi |
Techren Solar II LLC | Boulder, NV | 502.5 GWh | 2.1 mi |
Techren Solar III LLC | Boulder, NV | 61.5 GWh | 3.9 mi |
Techren Solar V | Boulder, NV | 118.2 GWh | 0.8 mi |
Townsite Solar Project Hybrid | Boulder City, NV | 445.2 GWh | 4.3 mi |