Techren Solar I LLC
15103 Highway US 95 South, Boulder, NV 89005Plant Summary Information
Techren Solar I LLC is ranked #44 out of 104 power plants in Nevada in terms of total annual net electricity generation.
Techren Solar I LLC generated 51.0 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Techren Solar I LLC |
---|---|
Utility Name | Techren Solar I LLC |
Location | Clark County, NV |
Initial Operation Date | March 2019 |
Last Update | Mar 2024 |
Annual Generation | 208.9 GWh |
Annual Consumption | 712.6 k MMBtu |
Ranked #2,292 out of 11,249 Power Plants Nationwide | |
Ranked #232 out of 5,158 Solar Power Plants Nationwide | |
Ranked #44 out of 104 Nevada Power Plants | |
Ranked #19 out of 54 Nevada Solar Power Plants | |
Fuel Types | Solar |
Map of Techren Solar I LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Techren Solar I LLC.
Monthly Net Generation for Techren Solar I LLC
Techren Solar I LLC Details
Summary Information | |
---|---|
Plant Name | Techren Solar I LLC (61611) |
Plant Address | 15103 Highway US 95 South Boulder, NV 89005 |
Utility | Techren Solar I LLC (61532) |
Latitude, Longitude | 35.85134, -114.97439 |
Generation Dates on File | Mar 2019 to Mar 2024 |
Initial Operation Date | March 2019 |
Annual Generation | 208.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG17-76-000, EG17137-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator TECH1 Details Operating March 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NSO_2_N008 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSO_2_N008 |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Lenses Mirrors | No |
---|---|
Single Axis Tracking | Yes |
Azimuth Angle | 180 |
DC Net Capacity | 132.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Techren Solar I LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#222 | OCI Alamo 5 LLC | Uvalde, TX | 217.2 GWh |
#223 | OETN1 | Obion, TN | 216.6 GWh |
#224 | White Pine Solar, LLC | Butler, GA | 212.9 GWh |
#225 | Aulander Holloman Solar, LLC | Aulander, NC | 212.6 GWh |
#226 | Utah Red Hills Renewable Energy Park | Parowan, UT | 212.6 GWh |
#227 | Sigurd Solar LLC | Sigurd, UT | 212.3 GWh |
#228 | North Star Solar Project | North Branch, MN | 211.0 GWh |
#229 | Maplewood Solar | Climax, VA | 210.3 GWh |
#230 | Lapetus | Andrews, TX | 209.6 GWh |
#231 | Two Creeks Solar | Two Rivers, WI | 209.3 GWh |
#233 | Graphite Solar I | Wellington, UT | 208.8 GWh |
#234 | Granite Mountain Solar East, LLC | Cedar City, UT | 208.3 GWh |
#235 | Clover Creek Solar Community Solar | Mona, UT | 208.0 GWh |
#236 | Wagyu | Damon, TX | 207.8 GWh |
#237 | Playa Solar 1, LLC | North Las Vegas, NV | 207.8 GWh |
#238 | Solverde 1 | Lancaster, CA | 207.6 GWh |
#239 | RE Astoria 2 | Rosamond, CA | 206.9 GWh |
#240 | Ivanpah 2 | Nipton, CA | 212.9 GWh |
#241 | Water Strider Solar | Nathalie, VA | 201.6 GWh |
#242 | Lancaster Solar GA | Arlington, GA | 201.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Techren Solar I LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boulder Solar II, LLC | Boulder City, NV | 135.6 GWh | 1.7 mi |
Clark (NVE) | Las Vegas, NV | 643.7 GWh | 16.9 mi |
CM10 | Boulder City, NV | 19.8 GWh | 4.5 mi |
CM48 | Boulder City, NV | 102.4 GWh | 4.9 mi |
Copper Mountain Solar 2 | Boulder City, NV | 381.0 GWh | 4.5 mi |
Copper Mountain Solar 3 | Boulder City, NV | 647.5 GWh | 2.8 mi |
Copper Mountain Solar 4, LLC | Boulder City, NV | 249.7 GWh | 4.8 mi |
Copper Mountain Solar 5, LLC | Boulder City, NV | 721.6 GWh | 5.2 mi |
Desert Star Energy Center | Boulder City, NV | 1.9 TWh | 4.5 mi |
Dignity - Siena Campus | Henderson, NV | 3.0 GWh | 13.2 mi |
Hoover Dam (AZ) | Boulder City, AZ | 1.6 TWh | 17.4 mi |
Hoover Dam (NV) | Boulder City, NV | 1.3 TWh | 17.4 mi |
Nevada Solar One | Boulder City, NV | 98.0 GWh | 3.6 mi |
River Mountains Solar | Henderson, NV | 24.6 GWh | 12.7 mi |
Saguaro Power | Henderson, NV | 209.1 GWh | 13.3 mi |
Techren Solar II LLC | Boulder, NV | 574.3 GWh | 1.5 mi |
Techren Solar III LLC | Boulder, NV | 60.4 GWh | 0.5 mi |
Techren Solar IV LLC | Boulder, NV | 64.7 GWh | 3.6 mi |
Techren Solar V | Boulder, NV | 131.7 GWh | 4.3 mi |
Townsite Solar Project Hybrid | Boulder City, NV | 455.1 GWh | 7.8 mi |