Taygete II Energy Project
5177 Tipton Rd., Coyanosa, TX 79730Plant Summary Information
Taygete II Energy Project is ranked #21 out of 161 solar farms in Texas in terms of total annual net electricity generation.
Taygete II Energy Project generated 155.4 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Taygete II Energy Project |
---|---|
Utility Name | West Texas Solar Project II LLC |
Location | Pecos County, TX |
Initial Operation Date | July 2023 |
Last Update | Aug 2024 |
Annual Generation | 491.0 GWh |
Annual Consumption | 1.9 M MMBtu |
Ranked #1,310 out of 11,835 Power Plants Nationwide | |
Ranked #64 out of 5,643 Solar Power Plants Nationwide | |
Ranked #245 out of 749 Texas Power Plants | |
Ranked #21 out of 161 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
7X Energy, Inc. (2020 to 2020) West Texas Solar Project II LLC (2021 to 2023) |
Map of Taygete II Energy Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Taygete II Energy Project.
Monthly Net Generation for Taygete II Energy Project
Taygete II Energy Project Details
Summary Information | |
---|---|
Plant Name | Taygete II Energy Project (64075) |
Plant Address | 5177 Tipton Rd., Coyanosa, TX 79730 |
Utility | West Texas Solar Project II LLC (64569) |
Latitude, Longitude | 31.186, -103.128 |
Generation Dates on File | Jan 2023 to Aug 2024 |
Initial Operation Date | July 2023 |
Annual Generation | 491.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator TAYG2 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | TAYGETE2_ALL |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NA |
Nameplate Capacity | 203.8 MW |
Summer Capacity | 203.8 MW |
Winter Capacity | 203.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Other Solar Technology | No |
DC Net Capacity | 258.4 MW |
Thin Film Other | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Taygete II Energy Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#54 | Azure Sky Solar | Haskell, TX | 505.1 GWh |
#55 | Lumina Solar Project | Snyder, TX | 510.3 GWh |
#56 | Dunn's Bridge 1 Solar | Wheatfield, IN | 505.0 GWh |
#57 | Cool Springs Solar (Hybrid) | Bainbridge, GA | 500.3 GWh |
#58 | Galloway 1 Solar Farm | Paint Rock, TX | 496.6 GWh |
#59 | Yellowbud Solar, LLC | Williamsport, OH | 495.8 GWh |
#60 | Waco Solar | Mount Calm, TX | 495.4 GWh |
#61 | RE Maplewood | McCamey, TX | 491.6 GWh |
#62 | Centinela Solar Energy | Calexico, CA | 491.6 GWh |
#63 | Solar Blue | Lemoore, CA | 502.3 GWh |
#65 | Lumina II Solar Project | Snyder, TX | 489.6 GWh |
#66 | Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 475.5 GWh |
#67 | Taygete Energy Project LLC | Coyanosa, TX | 475.0 GWh |
#68 | Pisgah Ridge Solar, LLC | Richland, TX | 474.9 GWh |
#69 | Eiffel Solar Project | Paris, TX | 474.7 GWh |
#70 | SE Athos II, LLC | Desert Center, CA | 473.9 GWh |
#71 | Misae Solar | Childress, TX | 472.4 GWh |
#72 | Mesquite Solar 3, LLC | Tonopah, AZ | 462.5 GWh |
#73 | Townsite Solar Project Hybrid | Boulder City, NV | 444.2 GWh |
#74 | RE Tranquillity | Cantua Creek, CA | 450.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Taygete II Energy Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 238.9 GWh | 52.4 mi |
Barilla Solar | Fort Stockton, TX | 79.1 GWh | 20.4 mi |
Castle Gap Solar Hybrid | McCarney, TX | 385.9 GWh | 50.8 mi |
CED Crane Solar | Crane, TX | 405.5 GWh | 48.5 mi |
East Pecos Solar | McCamey, TX | 259.2 GWh | 51.7 mi |
Emerald Grove | Crane, TX | 281.6 GWh | 45.9 mi |
Greasewood Solar | Fort Stockton, TX | 165.2 GWh | 39.3 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 561.3 GWh | 52.4 mi |
Oberon IA | Odessa, TX | 276.9 GWh | 43.7 mi |
Oberon IB | Odessa, TX | 56.3 GWh | 43.2 mi |
Permian Basin | Monahans, TX | 344.7 GWh | 29.2 mi |
Phoebe Solar | Kermit, TX | 518.7 GWh | 47.9 mi |
RE Roserock | Fort Stockton, TX | 368.6 GWh | 18.8 mi |
Sherbino II | Ft. Stockton, TX | 533.6 GWh | 46.6 mi |
Taygete Energy Project LLC | Coyanosa, TX | 475.0 GWh | 1.4 mi |
Upton County Solar | McCamey, TX | 287.4 GWh | 49.7 mi |
WAL897 | Fort Stockton, TX | 174.0 MWh | 23.9 mi |
West of the Pecos Solar | TBD, TX | 232.6 GWh | 39.3 mi |
Woodward Mountain I | Girvin, TX | 175.7 GWh | 45.3 mi |
Woodward Mountain II | Girvin, TX | 168.8 GWh | 45.3 mi |