Taygete Energy Project LLC
TBD, Coyanosa, TX 79730Plant Summary Information
Taygete Energy Project LLC is ranked #27 out of 170 solar farms in Texas in terms of total annual net electricity generation.
Taygete Energy Project LLC generated 123.2 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Taygete Energy Project LLC |
---|---|
Utility Name | Taygete Energy Project LLC |
Location | Pecos County, TX |
Initial Operation Date | March 2021 |
Last Update | Oct 2024 |
Annual Generation | 458.7 GWh |
Annual Consumption | 1.7 M MMBtu |
Ranked #1,372 out of 11,866 Power Plants Nationwide | |
Ranked #77 out of 5,672 Solar Power Plants Nationwide | |
Ranked #256 out of 758 Texas Power Plants | |
Ranked #27 out of 170 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
7X Energy, Inc. (2018 to 2022) Taygete Energy Project LLC (2023 to 2023) |
Map of Taygete Energy Project LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Taygete Energy Project LLC.
Monthly Net Generation for Taygete Energy Project LLC
Taygete Energy Project LLC Details
Summary Information | |
---|---|
Plant Name | Taygete Energy Project LLC (62483) |
Plant Address | TBD, Coyanosa, TX 79730 |
Utility | Taygete Energy Project LLC (65925) |
Latitude, Longitude | 31.16525, -103.12587 |
Generation Dates on File | Jan 2021 to Oct 2024 |
Initial Operation Date | March 2021 |
Annual Generation | 458.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator PV1 Details Operating March 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 255 MW |
Summer Capacity | 255 MW |
Winter Capacity | 255 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 60 |
DC Net Capacity | 344.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Taygete Energy Project LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
TE Taygete Energy HoldCo, LLC | 3809 Juniper Trace, Suite 100, Austin, TX 78738 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#67 | Taygete II Energy Project | Coyanosa, TX | 495.7 GWh |
#68 | Cool Springs Solar (Hybrid) | Bainbridge, GA | 492.2 GWh |
#69 | Centinela Solar Energy | Calexico, CA | 491.6 GWh |
#70 | SE Athos II, LLC | Desert Center, CA | 478.3 GWh |
#71 | Arica Solar | Desert Center, CA | 470.0 GWh |
#72 | Misae Solar | Childress, TX | 470.1 GWh |
#73 | Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 467.8 GWh |
#74 | Townsite Solar Project Hybrid | Boulder City, NV | 445.2 GWh |
#75 | Noble Solar | Krum, TX | 458.3 GWh |
#76 | RE Tranquillity | Cantua Creek, CA | 450.4 GWh |
#78 | Mesquite Solar 3, LLC | Tonopah, AZ | 454.4 GWh |
#79 | Fort Bend Solar LLC | East Bernard, TX | 453.2 GWh |
#80 | Pleinmont Solar 2 | Spotsylvania, VA | 447.1 GWh |
#81 | Blue Jay Solar I, LLC | Iola, TX | 439.4 GWh |
#82 | Chaparral Springs | Rosamond, CA | 442.5 GWh |
#83 | Rambler | San Angelo, TX | 441.4 GWh |
#84 | Muscle Shoals | Cherokee, AL | 427.7 GWh |
#85 | Twiggs Solar | Dry Branch, GA | 427.0 GWh |
#86 | McFarland A Solar and Storage | Dateland, AZ | 417.8 GWh |
#87 | Texas Solar Nova 2 | Spur, TX | 423.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Taygete Energy Project LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 236.3 GWh | 52 mi |
Barilla Solar | Fort Stockton, TX | 79.1 GWh | 19.4 mi |
Castle Gap Solar Hybrid | McCarney, TX | 391.8 GWh | 50.8 mi |
CED Crane Solar | Crane, TX | 404.1 GWh | 48.5 mi |
East Pecos Solar | McCamey, TX | 253.8 GWh | 51.2 mi |
Emerald Grove | Crane, TX | 280.4 GWh | 45.6 mi |
Greasewood II LLC | Girvin, TX | 73.9 GWh | 31 mi |
Greasewood Solar | Fort Stockton, TX | 160.2 GWh | 38.8 mi |
Oberon IA | Odessa, TX | 269.9 GWh | 44.8 mi |
Oberon IB | Odessa, TX | 54.2 GWh | 44.3 mi |
Permian Basin | Monahans, TX | 344.7 GWh | 30.5 mi |
Phoebe Solar | Kermit, TX | 512.7 GWh | 49.3 mi |
RE Roserock | Fort Stockton, TX | 365.4 GWh | 17.8 mi |
Sherbino II | Ft. Stockton, TX | 533.6 GWh | 45.7 mi |
Taygete II Energy Project | Coyanosa, TX | 495.7 GWh | 1.4 mi |
Upton County Solar | McCamey, TX | 276.0 GWh | 49.7 mi |
WAL897 | Fort Stockton, TX | 174.0 MWh | 22.6 mi |
West of the Pecos Solar | TBD, TX | 233.7 GWh | 40.1 mi |
Woodward Mountain I | Girvin, TX | 175.7 GWh | 44.6 mi |
Woodward Mountain II | Girvin, TX | 168.8 GWh | 44.6 mi |