Tatanka Ridge
19139 479 Ave, Toronto, SD 57268Plant Summary Information
Tatanka Ridge is ranked #14 out of 50 power plants in South Dakota in terms of total annual net electricity generation.
Tatanka Ridge generated 124.7 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Tatanka Ridge |
---|---|
Utility Name | Tatanka Ridge LLC |
Location | Deuel County, SD |
Initial Operation Date | January 2021 |
Last Update | Sep 2024 |
Annual Generation | 599.5 GWh |
Annual Consumption | 2.2 M MMBtu |
Ranked #1,095 out of 11,852 Power Plants Nationwide | |
Ranked #250 out of 1,345 Wind Power Plants Nationwide | |
Ranked #14 out of 50 South Dakota Power Plants | |
Ranked #9 out of 25 South Dakota Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Avangrid Renewables LLC (2016 to 2019) Tatanka Ridge LLC (2020 to 2023) |
Map of Tatanka Ridge
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tatanka Ridge.
Monthly Net Generation for Tatanka Ridge
Tatanka Ridge Details
Summary Information | |
---|---|
Plant Name | Tatanka Ridge (61046) |
Plant Address | 19139 479 Ave, Toronto, SD 57268 |
Utility | Tatanka Ridge LLC (63897) |
Latitude, Longitude | 44.592, -96.576 |
Generation Dates on File | Jan 2021 to Sep 2024 |
Initial Operation Date | January 2021 |
Annual Generation | 599.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Otter Tail Power Co (14232) MN |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator WT1 Details Operating January 2021
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | OTP.TATANKARID |
RTO ISO Location Designation For Reporting Wholesale Sales Data | OTP.TATANKARID |
Nameplate Capacity | 154 MW |
Summer Capacity | 154 MW |
Winter Capacity | 154 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 56 |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Turbine Details | |
Number Of Turbines | 56 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.82-127 |
Design Wind Speed | 17.8 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 292 |
Tatanka Ridge Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#240 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 613.0 GWh |
#241 | Maple Ridge Wind Farm | Lowville, NY | 612.7 GWh |
#242 | Raymond Wind Farm, LLC | Lyford, TX | 611.8 GWh |
#243 | Boiling Springs Wind Farm | Woodward, OK | 610.5 GWh |
#244 | Coyote Wind LLC | Snyder, TX | 609.9 GWh |
#245 | Foxtail Wind, LLC | Forbes, ND | 608.9 GWh |
#246 | Bison 4 Wind Energy Center | New Salem, ND | 608.4 GWh |
#247 | South Plains Wind Phase I | Floydada, TX | 601.3 GWh |
#248 | Cedar Creek II | New Raymer, CO | 600.9 GWh |
#249 | Sweetwater Wind 4 LLC | Roscoe, TX | 600.7 GWh |
#251 | NaturEner Rim Rock Energy | Kevin, MT | 595.6 GWh |
#252 | Chapman Ranch Wind I | Corpus Christi, TX | 595.2 GWh |
#253 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 595.1 GWh |
#254 | Astra Wind Farm | Happy, TX | 594.3 GWh |
#255 | Limestone Wind Project | Coolidge, TX | 594.3 GWh |
#256 | Solano Wind | Rio Vista, CA | 592.9 GWh |
#257 | Golden Hill Wind | Wasco, OR | 590.4 GWh |
#258 | Cedar Springs II | Douglas, WY | 590.0 GWh |
#259 | Jumbo Hill Wind Project | Andrews, TX | 589.0 GWh |
#260 | Wild Horse | Ellensburg, WA | 589.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tatanka Ridge.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Astoria Station | Astoria, SD | 395.9 GWh | 1.4 mi |
Autumn Hills LLC | Hendricks, MN | 3.7 GWh | 14.2 mi |
Blazing Star 2 Wind Farm | Hendricks, MN | 839.4 GWh | 15 mi |
Blazing Star Wind Farm 1 | Hendricks, MN | 830.9 GWh | 10.7 mi |
Buffalo Ridge I LLC | Elkton, SD | 81.3 GWh | 12 mi |
Buffalo Ridge II LLC | Elkton, SD | 334.6 GWh | 5.1 mi |
Buffalo Ridge Wind | Lake Benton, MN | 451.7 GWh | 18 mi |
Coyote Ridge | White, SD | 392.9 GWh | 9.9 mi |
Deer Creek Station | White, SD | 1.1 TWh | 13.7 mi |
Deuel Harvest Wind Energy LLC | Clear Lake, SD | 1.0 TWh | 18.9 mi |
Jack River LLC | Hendricks, MN | 3.7 GWh | 13.4 mi |
Jessica Mills LLC | Hendricks, MN | 3.7 GWh | 13.4 mi |
Julia Hills LLC | Hendricks, MN | 3.7 GWh | 13.3 mi |
Lakota Ridge LLC | Hendricks, MN | 13.3 GWh | 15.2 mi |
Lincoln Heights I | Lake Benton, MN | 8.5 GWh | 22.2 mi |
Lincoln Heights II | Lake Benton, MN | 10.6 GWh | 22.6 mi |
Red Pine Wind Project | Ivanhoe, MN | 714.4 GWh | 22.2 mi |
Shaokatan Hills LLC | Hendricks, MN | 14.9 GWh | 13.7 mi |
Sun River LLC | Hendricks, MN | 3.7 GWh | 13.2 mi |
Tsar Nicholas LLC | Hendricks, MN | 3.7 GWh | 13.8 mi |