Tatanka Ridge
19139 479 Ave, Toronto, SD 57268Plant Summary Information
Tatanka Ridge is ranked #14 out of 51 power plants in South Dakota in terms of total annual net electricity generation.
Tatanka Ridge generated 154.7 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Tatanka Ridge |
---|---|
Utility Name | Tatanka Ridge LLC |
Location | Deuel County, SD |
Initial Operation Date | January 2021 |
Last Update | Dec 2024 |
Annual Generation | 598.2 GWh |
Annual Consumption | 2.2 M MMBtu |
Ranked #1,110 out of 11,949 Power Plants Nationwide | |
Ranked #259 out of 1,354 Wind Power Plants Nationwide | |
Ranked #14 out of 51 South Dakota Power Plants | |
Ranked #9 out of 26 South Dakota Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Avangrid Renewables LLC (2016 to 2019) Tatanka Ridge LLC (2020 to 2023) |
Map of Tatanka Ridge
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tatanka Ridge.
Monthly Net Generation for Tatanka Ridge
Tatanka Ridge Details
Summary Information | |
---|---|
Plant Name | Tatanka Ridge (61046) |
Plant Address | 19139 479 Ave, Toronto, SD 57268 |
Utility | Tatanka Ridge LLC (63897) |
Latitude, Longitude | 44.592, -96.576 |
Generation Dates on File | Jan 2021 to Dec 2024 |
Initial Operation Date | January 2021 |
Annual Generation | 598.2 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Otter Tail Power Co (14232) MN |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator WT1 Details Operating January 2021
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | OTP.TATANKARID |
RTO ISO Location Designation For Reporting Wholesale Sales Data | OTP.TATANKARID |
Nameplate Capacity | 154 MW |
Summer Capacity | 154 MW |
Winter Capacity | 154 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 56 |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Turbine Details | |
Number Of Turbines | 56 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.82-127 |
Design Wind Speed | 17.8 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 292 |
Tatanka Ridge Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#249 | Route 66 Wind Plant | Panhandle, TX | 614.8 GWh |
#250 | Raymond Wind Farm, LLC | Lyford, TX | 613.8 GWh |
#251 | King Creek Wind Farm 2, LLC | Throckmorton, TX | 611.9 GWh |
#252 | Horseshoe Bend Wind LLC | Arlington, OR | 608.6 GWh |
#253 | Bison 4 Wind Energy Center | New Salem, ND | 608.4 GWh |
#254 | Frontier Windpower II | Blackwell, OK | 608.2 GWh |
#255 | Prairie Queen Wind Farm | Moran, KS | 604.4 GWh |
#256 | Chickasaw Wind Farm | New Hampton, IA | 601.4 GWh |
#257 | NaturEner Rim Rock Energy | Kevin, MT | 600.5 GWh |
#258 | Cedar Springs II | Douglas, WY | 600.0 GWh |
#260 | Heart of Texas Wind Project | Brady, TX | 595.8 GWh |
#261 | Chapman Ranch Wind I | Corpus Christi, TX | 595.2 GWh |
#262 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 595.1 GWh |
#263 | Prairie Wind Farm | Montezuma, IA | 595.0 GWh |
#264 | Castle Gap Wind | Goldthwaite, TX | 594.9 GWh |
#265 | Jumbo Hill Wind Project | Andrews, TX | 593.8 GWh |
#266 | Moraine Sands Wind Power | Mason City, IL | 592.5 GWh |
#267 | South Plains Wind Phase I | Floydada, TX | 592.4 GWh |
#268 | Limon Wind I | Limon, CO | 591.7 GWh |
#269 | Blue Cloud Wind Energy LLC | Sudan, TX | 591.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tatanka Ridge.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Astoria Station | Astoria, SD | 413.2 GWh | 1.4 mi |
Autumn Hills LLC | Hendricks, MN | 3.7 GWh | 14.2 mi |
Blazing Star 2 Wind Farm | Hendricks, MN | 826.8 GWh | 15 mi |
Blazing Star Wind Farm 1 | Hendricks, MN | 817.1 GWh | 10.7 mi |
Buffalo Ridge I LLC | Elkton, SD | 79.8 GWh | 12 mi |
Buffalo Ridge II LLC | Elkton, SD | 341.5 GWh | 5.1 mi |
Buffalo Ridge Wind | Lake Benton, MN | 451.1 GWh | 18 mi |
Coyote Ridge | White, SD | 393.2 GWh | 9.9 mi |
Deer Creek Station | White, SD | 1.1 TWh | 13.7 mi |
Deuel Harvest Wind Energy LLC | Clear Lake, SD | 1.0 TWh | 18.9 mi |
Jack River LLC | Hendricks, MN | 3.7 GWh | 13.4 mi |
Jessica Mills LLC | Hendricks, MN | 3.7 GWh | 13.4 mi |
Julia Hills LLC | Hendricks, MN | 3.7 GWh | 13.3 mi |
Lakota Ridge LLC | Hendricks, MN | 13.3 GWh | 15.2 mi |
Lincoln Heights I | Lake Benton, MN | 8.5 GWh | 22.2 mi |
Lincoln Heights II | Lake Benton, MN | 10.6 GWh | 22.6 mi |
Red Pine Wind Project | Ivanhoe, MN | 704.0 GWh | 22.2 mi |
Shaokatan Hills LLC | Hendricks, MN | 14.9 GWh | 13.7 mi |
Sun River LLC | Hendricks, MN | 3.7 GWh | 13.2 mi |
Tsar Nicholas LLC | Hendricks, MN | 3.7 GWh | 13.8 mi |