Taos Mesa Energy Facility Hybrid
180 Lower Las Colonis RD, El Prado, NM 87529Plant Summary Information
Taos Mesa Energy Facility Hybrid is ranked #16 out of 79 solar farms in New Mexico in terms of total annual net electricity generation.
Taos Mesa Energy Facility Hybrid generated 8.9 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Taos Mesa Energy Facility Hybrid |
---|---|
Utility Name | Taos Mesa Energy Facility, LLC |
Location | Taos County, NM |
Initial Operation Date | November 2022 |
Last Update | Mar 2024 |
Annual Generation | 41.4 GWh |
Annual Consumption | 145.9 k MMBtu |
Ranked #4,044 out of 11,249 Power Plants Nationwide | |
Ranked #757 out of 5,158 Solar Power Plants Nationwide | |
Ranked #58 out of 135 New Mexico Power Plants | |
Ranked #16 out of 79 New Mexico Solar Power Plants | |
Fuel Types | Solar |
Map of Taos Mesa Energy Facility Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Taos Mesa Energy Facility Hybrid.
Monthly Net Generation for Taos Mesa Energy Facility Hybrid
Taos Mesa Energy Facility Hybrid Details
Summary Information | |
---|---|
Plant Name | Taos Mesa Energy Facility Hybrid (63728) |
Plant Address | 180 Lower Las Colonis RD El Prado, NM 87529 |
Utility | Taos Mesa Energy Facility, LLC (63420) |
Latitude, Longitude | 36.44, -105.62 |
Generation Dates on File | Nov 2022 to Mar 2024 |
Initial Operation Date | November 2022 |
Annual Generation | 41.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of New Mexico (PNM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Kit Carson Electric Coop, Inc (10378) NM |
Grid Voltage | 24.90 kV |
Energy Storage | Yes |
Generator BESS Details Operating November 2022
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 12 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 12 MW |
Winter Capacity | 12 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Other Combustion Technology | No |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 25 |
---|---|
Maximum Charge Rate | 12 MW |
Maximum Discharge Rate | 12 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 5 |
Storage Enclosure Type | CS |
System Peak Shaving | Yes |
Load Management | Yes |
Excess Wind And Solar Generation | Yes |
Generator TMEF1 Details Operating November 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 15 MW |
Summer Capacity | 15 MW |
Winter Capacity | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2022 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Other Combustion Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 19.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Taos Mesa Energy Facility Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#747 | Richland Solar Center | Jeffersonville, GA | 43.8 GWh |
#748 | Solar Blythe LLC | Blythe, CA | 43.7 GWh |
#749 | Mt. Home Solar 1, LLC | Pocatello, ID | 43.6 GWh |
#750 | Cogentrix of Alamosa | Mosca, CO | 43.3 GWh |
#751 | Arica Solar | Desert Center, CA | 43.2 GWh |
#752 | American Falls Solar | American Falls, ID | 43.1 GWh |
#753 | RE Adams East, LLC | Fresno, CA | 43.1 GWh |
#754 | BPL Sol Solar LLC | Chilton, TX | 43.1 GWh |
#755 | Butler Solar Farm 20 | Butler, GA | 42.8 GWh |
#756 | Energix Leatherwood, LLC | Axton, VA | 42.8 GWh |
#758 | CoTAL Solar Farm | Tallahassee, FL | 42.7 GWh |
#759 | Portal Ridge Solar B, LLC | Lancaster, CA | 42.6 GWh |
#760 | Briel Solar Farm | Standston, VA | 42.5 GWh |
#761 | Gloucester Solar | Gloucester, VA | 42.5 GWh |
#762 | Nicolis Solar PV Plant | Delano, CA | 42.4 GWh |
#763 | Montross Solar | Montross, VA | 42.3 GWh |
#764 | Temperance Solar, LLC | Erie, MI | 42.1 GWh |
#765 | Hyder Solar Hybrid | Hyder, AZ | 42.1 GWh |
#766 | Fusion Solar Center LLC | Baltic, CT | 42.0 GWh |
#767 | Red Rock | Red Rock, AZ | 41.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Taos Mesa Energy Facility Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Abiquiu Dam | Abiquiu, NM | 23.3 GWh | 46.8 mi |
Alcalde Solar Array | Alcalde, NM | 6.5 GWh | 33.6 mi |
Blue Sky One | Taos, NM | 2.9 GWh | 38.1 mi |
Cimarron Solar Facility | Springer, NM | 63.9 GWh | 54.7 mi |
Conejos 1 Community Solar Array | La Jara, CO | 4.3 GWh | 55.9 mi |
El Vado Dam | Tierra Amarilla, NM | 3.6 GWh | 62.7 mi |
Kit Carson | Amalia, NM | 2.7 GWh | 37.8 mi |
Las Vegas Solar Energy Center | Las Vegas, NM | 10.6 GWh | 59.7 mi |
Los Alamos PV Site | Los Alamos, NM | 561.0 MWh | 54.8 mi |
Questa Solar Facility | Questa, NM | 704.4 MWh | 19.1 mi |
San Luis Solar Garden | Antonito, CO | 3.3 GWh | 48.7 mi |
San Miguel I Solar Energy Center | Las Vegas, NM | 27.6 GWh | 60.9 mi |
San Miguel II Solar Energy Center | Las Vegas, NM | 27.9 GWh | 61 mi |
Santa Fe Solar Energy Center | Santa Fe, NM | 23.6 GWh | 63.8 mi |
Springer Solar 1 | Springer, NM | 2.4 GWh | 57.1 mi |
Storrie Lake Solar Project | Las Vegas, NM | 3.5 GWh | 59.3 mi |
Syncarpha Eagle Nest | Eagle Nest, NM | 2.6 GWh | 20.4 mi |
Syncarpha El Rito | El Rito, NM | 4.0 GWh | 32.6 mi |
Syncarpha Questa | Cerro, NM | 4.2 GWh | 25.7 mi |
Syncarpha Taos | Taos, NM | 8.5 GWh | 5.2 mi |