Taftville
607 Norwich Avenue, Taftville, CT 6380Plant Summary Information
Taftville is ranked #12 out of 13 hydroelectric power plants in Connecticut in terms of total annual net electricity generation.
Taftville is comprised of 5 generators and generated 935.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Taftville |
---|---|
Utility Name | FirstLight Power Resources Services LLC |
Location | Southeastern Connecticut Planning Region, CT |
Initial Operation Date | January 1906 |
Last Update | Dec 2023 |
Annual Generation | 4.7 GWh |
Annual Consumption | 17.3 k MMBtu |
Ranked #7,776 out of 11,835 Power Plants Nationwide | |
Ranked #1,178 out of 1,371 Water Power Plants Nationwide | |
Ranked #81 out of 156 Connecticut Power Plants | |
Ranked #12 out of 13 Connecticut Water Power Plants | |
Fuel Types | Water |
Map of Taftville
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Taftville.
Monthly Net Generation for Taftville
Taftville Details
Summary Information | |
---|---|
Plant Name | Taftville (554) |
Plant Address | 607 Norwich Avenue, Taftville, CT 6380 |
Utility | FirstLight Power Resources Services LLC (54895) |
Latitude, Longitude | 41.5725, -72.0458 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1906 |
Annual Generation | 4.7 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 00-94-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Shetucket |
Ash Impoundment | No |
Transmission / Distribution Owner | Connecticut Light & Power Co (4176) CT |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator 2 Details Operating January 1906
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1906 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Generator 3 Details Operating January 1906
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1906 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Generator 1 Details Operating January 1926
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1926 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Generator 4 Details Operating January 1949
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1949 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Generator 5 Details Operating January 1949
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1949 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Taftville Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
FirstLight Hydro Generating Company | 143 West Street Ext. Suite E, New Milford, CT 6776 | Generator 1 | 100.00% |
FirstLight Hydro Generating Company | 143 West Street Ext. Suite E, New Milford, CT 6776 | Generator 2 | 100.00% |
FirstLight Hydro Generating Company | 143 West Street Ext. Suite E, New Milford, CT 6776 | Generator 3 | 100.00% |
FirstLight Hydro Generating Company | 143 West Street Ext. Suite E, New Milford, CT 6776 | Generator 4 | 100.00% |
FirstLight Hydro Generating Company | 143 West Street Ext. Suite E, New Milford, CT 6776 | Generator 5 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1168 | Beaver Valley Patterson Dam | Beaver Falls, PA | 4.8 GWh |
#1169 | Kleber | Onaway, MI | 4.8 GWh |
#1170 | Mora Drop Hydroelectric Project | Kuna, ID | 4.8 GWh |
#1171 | Blind Canyon Hydro | Wendell, ID | 4.8 GWh |
#1172 | Tuckasegee | Tuckasegee, NC | 4.8 GWh |
#1173 | 45 Mile Hydroelectric Project | Culver, OR | 4.8 GWh |
#1174 | Hillcrest Pump Station | Denver, CO | 4.8 GWh |
#1175 | Michell Butte Power Project | Nyssa, OR | 4.8 GWh |
#1176 | Clam River Dam | Danbury, WI | 4.8 GWh |
#1177 | Austin | Austin, TX | 4.7 GWh |
#1179 | Chasm Hydro Partnership | Chateaugay, NY | 4.7 GWh |
#1180 | Stairs | Salt Lake City, UT | 4.6 GWh |
#1181 | Center Falls | Greenwich, NY | 4.6 GWh |
#1182 | Pelzer Upper | Petzer, SC | 4.6 GWh |
#1183 | Pelzer Lower | Williamston, SC | 4.6 GWh |
#1184 | Franklin (NC) | Franklin, NC | 4.6 GWh |
#1185 | Little Mac Project | Buhl, ID | 4.5 GWh |
#1186 | Chester Lake | Metlakatla, AK | 4.5 GWh |
#1187 | Gantt | Andalusia, AL | 4.5 GWh |
#1188 | Lower No 2 | Idaho Falls, ID | 4.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Taftville.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Backus Microgrid Project | Norwich, CT | 988.0 MWh | 3.2 mi |
Clinton Solar | Griswold, CT | 1.6 GWh | 7.5 mi |
CMEEC - Bozrah | Bozrah, CT | 3.1 GWh | 5.8 mi |
CMEEC - Norwich Stott St Solar Hybrid | Norwich, CT | 2.4 GWh | 3.1 mi |
CMEEC - Rogers Rd Solar | Norwich, CT | 1.6 GWh | 4.6 mi |
Conn Mun Electric Energy Coop | Norwich, CT | 1.3 GWh | 4.6 mi |
Covanta Southeastern Connecticut Company | Preston, CT | 116.9 GWh | 6.8 mi |
Fort Hill 1, 2, 3 & 4 | Uncasville, CT | 742.0 MWh | 7.6 mi |
Foxwoods CoGen | Mashantucket, CT | 10.8 GWh | 8.2 mi |
Fusion Solar Center LLC | Baltic, CT | 37.9 GWh | 3.6 mi |
Jackson Solar (CT) | Griswold, CT | 1.6 GWh | 7.4 mi |
Jewett City 1 | Jewett City, CT | 198.0 MWh | 3.9 mi |
LNG 1 & 2 | Norwich, CT | 573.0 MWh | 3.7 mi |
North Main Street | Norwich, CT | 138.5 MWh | 3.3 mi |
Norwich WWTP | Norwich, CT | 1.0 MWh | 3.8 mi |
Scotland Dam | Windham, CT | 9.6 GWh | 7.5 mi |
Sherman Solar | Griswold, CT | 1.6 GWh | 7.5 mi |
Tenth Street | Norwich, CT | 3.5 GWh | 2.3 mi |
Tunnel | Preston, CT | 11.9 GWh | 1.2 mi |
Wheelabrator Lisbon | Lisbon, CT | 99.4 GWh | 0.9 mi |