Table Rock
4600 STATE HWY 165 STE A, Branson, MO 65616Plant Summary Information
Table Rock is ranked #19 out of 116 power plants in Missouri in terms of total annual net electricity generation.
Table Rock is comprised of 4 generators and generated 172.9 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Table Rock |
---|---|
Utility Name | USCE-Little Rock District |
Location | Taney County, MO |
Initial Operation Date | May 1959 |
Last Update | Dec 2022 |
Annual Generation | 699.5 GWh |
Annual Consumption | 2.7 M MMBtu |
Ranked #1,027 out of 11,249 Power Plants Nationwide | |
Ranked #68 out of 1,354 Water Power Plants Nationwide | |
Ranked #19 out of 116 Missouri Power Plants | |
Ranked #1 out of 7 Missouri Water Power Plants | |
Fuel Types | Water |
Map of Table Rock
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Table Rock.
Monthly Net Generation for Table Rock
Table Rock Details
Summary Information | |
---|---|
Plant Name | Table Rock (2166) |
Plant Address | 4600 STATE HWY 165 STE A Branson, MO 65616 |
Utility | USCE-Little Rock District (19647) |
Latitude, Longitude | 36.597, -93.3086 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | May 1959 |
Annual Generation | 699.5 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwestern Power Administration (SPA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Table Rock Lake |
Ash Impoundment | No |
Transmission / Distribution Owner | Southwestern Power Administration (17716) |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator 1 Details Operating May 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NA |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 53 MW |
Winter Capacity | 53 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating May 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 53 MW |
Winter Capacity | 53 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 3 Details Operating May 1961
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 57.5 MW |
Winter Capacity | 57.5 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1961 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 4 Details Operating June 1961
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 53 MW |
Winter Capacity | 53 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1961 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Table Rock Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#58 | Fort Peck | Fort Peck, MT | 813.6 GWh |
#59 | White Rock/Slab Creek | Placerville, CA | 806.0 GWh |
#60 | Oxbow (OR) | Oxbow, OR | 780.9 GWh |
#61 | Gorge | Rockport, WA | 776.7 GWh |
#62 | Pine Flat | Piedra, CA | 759.1 GWh |
#63 | Gavins Point | Crofton, NE | 752.5 GWh |
#64 | Chickamauga | Chattanooga, TN | 750.1 GWh |
#65 | Pit 5 | Big Bend, CA | 738.8 GWh |
#66 | Poe | Storrie, CA | 737.3 GWh |
#67 | Yellowtail | Hardin, MT | 717.9 GWh |
#69 | Barkley | Kuttawa, KY | 691.2 GWh |
#70 | Calderwood | Tallassee, TN | 689.7 GWh |
#71 | Diablo | Rockport, WA | 683.6 GWh |
#72 | Lay Dam | Clanton, AL | 674.3 GWh |
#73 | J Strom Thurmond | Clarks Hill, SC | 672.0 GWh |
#74 | Osage Dam | Eldon, MO | 629.0 GWh |
#75 | Jaybird | Camino, CA | 627.8 GWh |
#76 | Meldahl Hydroelectric Project | Foster, KY | 622.1 GWh |
#77 | Guntersville | Guntersville, AL | 621.5 GWh |
#78 | Middle Fork | Foresthill, CA | 616.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Table Rock.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beaver Dam | Eureka Springs, AR | 163.2 GWh | 32.3 mi |
Berryville School District Solar | Berryville, AR | 1.6 GWh | 21.8 mi |
Bull Shoals | Mountain Home, AR | 1.1 TWh | 43.8 mi |
Elkins Generating Center | Elkins, AR | 29.8 GWh | 57.9 mi |
Empire Energy Center | Sarcoxie, MO | 283.9 GWh | 57.7 mi |
Harry D Mattison Gas Plant | Tontitown, AR | 208.8 GWh | 61.3 mi |
James River Power Station | Springfield, MO | 155.7 GWh | 35.4 mi |
John Twitty Energy Center | Springfield, MO | 2.2 TWh | 38.6 mi |
Kings Point Wind Energy Center | Golden City, MO | 601.6 GWh | 62 mi |
McCartney | Strafford, MO | 101.5 GWh | 45.6 mi |
Nixa Solar, LLC | Nixa, MO | 15.0 GWh | 30.9 mi |
Noble Hill Landfill | Willard, MO | 4.6 GWh | 54.2 mi |
Noland Wastewater Treatment Plant Hybrid | Fayetteville, AR | 9.0 GWh | 55.2 mi |
Norfork | Salesville, AR | 274.2 GWh | 64.1 mi |
Ozark Beach | Forsyth, MO | 61.8 GWh | 11.1 mi |
Ozarks Natural Energy Community Solar | Springdale, AR | 1.6 GWh | 52.4 mi |
Springfield Solar 1 LLC | Strafford, MO | 9.4 GWh | 45.6 mi |
UA Central Utility Plant | Fayetteville, AR | 43.0 GWh | 60.5 mi |
Waste Management Eco Vista LFGTE | Springdale, AR | 24.6 GWh | 61.6 mi |
Westside Wastewater Treatment Plant Hybrid | Fayetteville, AR | 10.1 GWh | 60.1 mi |