T B Simon Power Plant
354 Service Rd., East Lansing, MI 48824Plant Summary Information
T B Simon Power Plant is ranked #45 out of 256 power plants in Michigan in terms of total annual net electricity generation.
T B Simon Power Plant is comprised of 9 generators and generated 63.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | T B Simon Power Plant |
---|---|
Utility Name | Michigan State University |
Location | Ingham County, MI |
Initial Operation Date | December 1965 |
Last Update | Sep 2024 |
Annual Generation | 235.5 GWh |
Annual Consumption | 5.3 M MMBtu |
Ranked #2,114 out of 11,852 Power Plants Nationwide | |
Ranked #691 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #45 out of 256 Michigan Power Plants | |
Ranked #19 out of 73 Michigan Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of T B Simon Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for T B Simon Power Plant.
Monthly Net Generation for T B Simon Power Plant
T B Simon Power Plant Details
Summary Information | |
---|---|
Plant Name | T B Simon Power Plant (10328) |
Plant Address | 354 Service Rd., East Lansing, MI 48824 |
Utility | Michigan State University (12436) |
Latitude, Longitude | 42.7178, -84.4836 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | December 1965 |
Annual Generation | 235.5 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | EL21-50-000, QF21-222-001 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Educational Services (611) |
Sector | Commercial CHP (5) |
Water Source | Ground Water |
Ash Impoundment | No |
Transmission / Distribution Owner | Consumers Energy Co (4254) MI |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CONSUMERS ENERGY COMPANY |
Natural Gas Storage | No |
Generator GEN1 Details Operating December 1965
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 12.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 12.5 MW |
Winter Capacity | 12.5 MW |
Minimum Load | 2.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1965 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating September 1966
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 12.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 12.5 MW |
Winter Capacity | 12.5 MW |
Minimum Load | 2.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1966 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating December 1974
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 15 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 15 MW |
Winter Capacity | 15 MW |
Minimum Load | 2.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1974 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Operating August 1993
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 21 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 21 MW |
Winter Capacity | 21 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1993 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
---|---|
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Fluidized Bed Technology | No |
Pulverized Coal Technology | No |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN6 Details Operating April 2006
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 14.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 12.6 MW |
Winter Capacity | 14.3 MW |
Minimum Load | 9 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2006 |
Combined Heat & Power | No |
---|---|
Sector Name | Commercial CHP (5) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating May 2006
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 24 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 23.8 MW |
Winter Capacity | 23.8 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2006 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
---|---|
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN7 Details Operating February 2022
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 9.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 9.4 MW |
Winter Capacity | 9.4 MW |
Minimum Load | 6.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2022 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GEN8 Details Operating February 2022
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 9.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 9.4 MW |
Winter Capacity | 9.4 MW |
Minimum Load | 6.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2022 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GEN9 Details Operating February 2022
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 9.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 9.4 MW |
Winter Capacity | 9.4 MW |
Minimum Load | 6.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2022 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
T B Simon Power Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#681 | Arapahoe Combustion Turbine Project | Denver, CO | 242.6 GWh |
#682 | Dahlberg | Nicholson, GA | 242.8 GWh |
#683 | Georgetown | Indianapolis, IN | 239.4 GWh |
#684 | Central Utility Plant Cincinnati | Cincinnati, OH | 238.9 GWh |
#685 | Eagle Point Power Generation | Westville, NJ | 238.5 GWh |
#686 | Dickerson Power | Dickerson, MD | 239.6 GWh |
#687 | Larsen Memorial | Lakeland, FL | 237.6 GWh |
#688 | Valero Wilmington Cogeneration Plant | Wilmington, CA | 236.7 GWh |
#689 | Waterford 1 & 2 | Killona, LA | 239.7 GWh |
#690 | Louisa Generation Facility | Gordonsville, VA | 236.9 GWh |
#692 | Port Arthur Texas Refinery | Port Arthur, TX | 234.8 GWh |
#693 | Saranac Facility | Plattsburgh, NY | 234.4 GWh |
#694 | NAEA Ocean Peaking Power LLC | Lakewood, NJ | 232.6 GWh |
#695 | Portside Energy | Portage, IN | 232.0 GWh |
#696 | ArcelorMittal Burns Harbor | Burns Harbor, IN | 820.3 GWh |
#697 | Richland | Defiance, OH | 231.5 GWh |
#698 | Gramercy Holdings LLC | Gramercy, LA | 231.1 GWh |
#699 | Georgia-Pacific Brewton Mill | Brewton, AL | 490.5 GWh |
#700 | Empire Energy Center | Sarcoxie, MO | 239.0 GWh |
#701 | Indiana Harbor West | East Chicago, IN | 229.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding T B Simon Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Assembly Solar II LLC | Lennon, MI | 217.5 GWh | 34.8 mi |
Assembly Solar III | Lennon, MI | 154.2 GWh | 34.6 mi |
Assembly Solar Project | Venice Township, MI | 99.6 GWh | 34.5 mi |
Bingham Solar, LLC | St. Johns, MI | 38.4 GWh | 20.5 mi |
Blue Elk III Solar, LLC | Eaton Rapids, MI | 433.0 MWh | 15 mi |
Delta Energy Park | Lansing, MI | 847.3 GWh | 9 mi |
Delta Solar Power I | Grand Ledge, MI | 13.3 GWh | 11.1 mi |
Delta Solar Power II | Grand Ledge, MI | 25.8 GWh | 11 mi |
Frank Jenkins | Portland, MI | 101.0 MWh | 23.3 mi |
Grand River | Grand Ledge, MI | 6.4 GWh | 11.9 mi |
Heartland Farms | Middleton, MI | 185.9 GWh | 35.1 mi |
Jackson Generating Station | Jackson, MI | 2.0 TWh | 32.9 mi |
Lansing BWL REO Town Plant | Lansing, MI | 539.2 GWh | 3.5 mi |
Lennon Generating | Lennon, MI | 27.3 GWh | 31.4 mi |
Lyons Road | Owosso, MI | 36.9 GWh | 24.3 mi |
Midcontinent Solar, LLC | Owosso, MI | 795.0 MWh | 24 mi |
Shipsterns Solar, LLC | Albion, MI | 1.3 GWh | 32.1 mi |
Spartan PV 1, LLC | East Lansing, MI | 12.6 GWh | 0.2 mi |
Venice Resources Gas Recovery | Lennon, MI | 11.2 GWh | 31.6 mi |
Webber | Lyons, MI | 11.1 GWh | 26.7 mi |