Sweetland Wind Farm, LLC
36898 205th St., St. Lawrence, SD 57373Plant Summary Information
Sweetland Wind Farm, LLC is ranked #10 out of 50 power plants in South Dakota in terms of total annual net electricity generation.
Sweetland Wind Farm, LLC generated 189.1 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Sweetland Wind Farm, LLC |
---|---|
Utility Name | Sweetland Wind Farm, LLC |
Location | Hand County, SD |
Initial Operation Date | October 2023 |
Last Update | Sep 2024 |
Annual Generation | 793.8 GWh |
Annual Consumption | 2.7 M MMBtu |
Ranked #885 out of 11,852 Power Plants Nationwide | |
Ranked #141 out of 1,345 Wind Power Plants Nationwide | |
Ranked #10 out of 50 South Dakota Power Plants | |
Ranked #6 out of 25 South Dakota Wind Power Plants | |
Fuel Types | Wind |
Map of Sweetland Wind Farm, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sweetland Wind Farm, LLC.
Monthly Net Generation for Sweetland Wind Farm, LLC
Sweetland Wind Farm, LLC Details
Summary Information | |
---|---|
Plant Name | Sweetland Wind Farm, LLC (66496) |
Plant Address | 36898 205th St., St. Lawrence, SD 57373 |
Utility | Sweetland Wind Farm, LLC (65553) |
Latitude, Longitude | 44.38681, -98.80108 |
Generation Dates on File | Oct 2023 to Sep 2024 |
Initial Operation Date | October 2023 |
Annual Generation | 793.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG23-85-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | WAPA-- Western Area Power Administration (27000) SD |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator SLW Details Operating October 2023
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Minimum Load | 200 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 71 |
Turbine Details | |
Number Of Turbines | 71 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.82-127 |
Design Wind Speed | 19.9 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 291.9 |
Sweetland Wind Farm, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#131 | Sunflower Energy Center, LLC | Peabody, KS | 808.8 GWh |
#132 | Ninnescah Wind Energy, LLC | Cunningham, KS | 806.6 GWh |
#133 | Lundgren Wind Project | Otho, IA | 805.8 GWh |
#134 | Crowned Ridge Wind II Energy Center | Watertown, SD | 804.3 GWh |
#135 | Cedar Bluff Wind, LLC | Brownwell, KS | 802.5 GWh |
#136 | Freeborn Wind Farm | Glenville, MN | 799.1 GWh |
#137 | Ledyard Windpower, LLC | Lakota, IA | 797.7 GWh |
#138 | Red Dirt Wind Project | Hennessy, OK | 797.0 GWh |
#139 | Heartland Divide II | Audubon, IA | 796.8 GWh |
#140 | Javelina Wind Energy, LLC | Mirando City, TX | 795.5 GWh |
#142 | Karankawa Wind LLC | Mathis, TX | 793.2 GWh |
#143 | Bluestem | Beaver, OK | 793.2 GWh |
#144 | Whispering Willow North | Latimer, IA | 792.9 GWh |
#145 | Great Pathfinder Wind | Stratford, IA | 790.8 GWh |
#146 | Limon III Wind LLC | Limon, CO | 788.5 GWh |
#147 | Lower Snake River Wind Energy Project | Pomeroy, WA | 787.8 GWh |
#148 | Flat Top Wind I | Mullin, TX | 786.7 GWh |
#149 | Plymouth Wind | Remsen, IA | 777.8 GWh |
#150 | Kingman Wind | Cunningham, KS | 777.4 GWh |
#151 | Longhorn Wind | Silverton, TX | 776.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sweetland Wind Farm, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aberdeen CT | Aberdeen, SD | 44.3 GWh | 73.6 mi |
Aurora County Wind | White Lake, SD | 70.8 GWh | 45.4 mi |
Big Bend Dam | Chamberlain, SD | 770.5 GWh | 40 mi |
Bob Glanzer Generating Station | Huron, SD | 96.4 GWh | 31.1 mi |
Brule County Wind | Kimball, SD | 64.6 GWh | 46.7 mi |
Chamberlain Wind Project | Chamberlain, SD | 98.0 MWh | 43.3 mi |
Crocker Wind Farm | Conde, SD | 811.3 GWh | 66.3 mi |
Day County Wind LLC | Conde, SD | 424.0 GWh | 72.1 mi |
Ft. Pierre | Fort Pierre, SD | 52.9 MWh | 78 mi |
Groton Generation Station | Groton, SD | 201.9 GWh | 76.4 mi |
Lake Preston | Lake Preston, SD | 76.0 MWh | 70.1 mi |
North Bend Wind Project, LLC | Highmore, SD | 633.8 GWh | 42.4 mi |
Oak Tree Energy | Clark, SD | 66.7 GWh | 64.3 mi |
Pierre Solar | Pierre, SD | 17.0 MWh | 74.4 mi |
POET Bioprocessing- Mitchell | Mitchell, SD | 17.6 GWh | 53.2 mi |
Prairie Winds SD1 | Crow Lake, SD | 343.7 GWh | 34.6 mi |
Rolling Thunder Wind Farm Hybrid | Miller, SD | 79.7 GWh | 17.6 mi |
South Dakota Wind Energy Cente | Highmore, SD | 80.3 GWh | 36.2 mi |
Triple H Wind Project | Highmore, SD | 988.3 GWh | 39.6 mi |
Wessington Springs | Wessington Springs, SD | 228.5 GWh | 28.5 mi |