Surry
5570 Hog Island Road, Surry, VA 23883Plant Summary Information
Surry is ranked #40 out of 11,852 power plants nationwide in terms of total annual net electricity generation.
Surry is comprised of 2 generators and generated 3.7 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Surry |
---|---|
Utility Name | Virginia Electric & Power Co |
Location | Surry County, VA |
Initial Operation Date | December 1972 |
Last Update | Sep 2024 |
Annual Generation | 13.8 TWh |
Annual Consumption | 157.4 M MMBtu |
Ranked #40 out of 11,852 Power Plants Nationwide | |
Ranked #33 out of 54 Nuclear Power Plants Nationwide | |
Ranked #2 out of 212 Virginia Power Plants | |
Ranked #2 out of 2 Virginia Nuclear Power Plants | |
Fuel Types | Nuclear |
Map of Surry
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Surry.
Monthly Net Generation for Surry
Surry Details
Summary Information | |
---|---|
Plant Name | Surry (3806) |
Plant Address | 5570 Hog Island Road, Surry, VA 23883 |
Utility | Virginia Electric & Power Co (19876) |
Latitude, Longitude | 37.1661, -76.6986 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | December 1972 |
Annual Generation | 13.8 TWh |
Fuel Types | Nuclear |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | James River |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 1972
Technology | Nuclear |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 847.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 838 MW |
Winter Capacity | 875 MW |
Minimum Load | 189 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1972 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Nuclear |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Generator 2 Details Operating May 1973
Technology | Nuclear |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 847.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 838 MW |
Winter Capacity | 875 MW |
Minimum Load | 189 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1973 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Nuclear |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Surry Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Nuclear.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#23 | Nine Mile Point Nuclear Station | Lycoming, NY | 15.5 TWh |
#24 | Quad Cities Generating Station | Cordova, IL | 15.5 TWh |
#25 | North Anna | Mineral, VA | 15.4 TWh |
#26 | Dresden Generating Station | Morris, IL | 15.3 TWh |
#27 | Beaver Valley | Shippingport, PA | 15.2 TWh |
#28 | St Lucie | Jensen Beach, FL | 15.0 TWh |
#29 | Calvert Cliffs Nuclear Power Plant | Lusby, MD | 14.8 TWh |
#30 | Turkey Point | Homestead, FL | 21.4 TWh |
#31 | Joseph M Farley | Columbia, AL | 14.2 TWh |
#32 | Edwin I Hatch | Baxley, GA | 14.1 TWh |
#34 | Seabrook | Seabrook, NH | 10.9 TWh |
#35 | Perry | Perry, OH | 10.7 TWh |
#36 | Grand Gulf | Port Gibson, MS | 10.6 TWh |
#37 | Point Beach Nuclear Plant | Two Rivers, WI | 10.1 TWh |
#38 | Columbia Generating Station | Richland, WA | 9.9 TWh |
#39 | Callaway | Fulton, MO | 9.4 TWh |
#40 | Clinton Power Station | Clinton, IL | 9.3 TWh |
#41 | Wolf Creek Generating Station | Burlington, KS | 9.1 TWh |
#42 | PSEG Hope Creek Generating Station | Hancocks Bridge, NJ | 8.6 TWh |
#43 | V C Summer | Jenkinsville, SC | 8.4 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Surry.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Carvers Creek Solar | Gloucester, VA | 13.2 GWh | 27.8 mi |
Cavalier Solar | Smithfield, VA | 108.8 GWh | 10.4 mi |
Charles City | Providence Forge, VA | 54.0 GWh | 30.2 mi |
Colonial Trail West | Spring Grove, VA | 279.9 GWh | 11.4 mi |
Correctional Solar LLC | Barhamsville, VA | 30.1 GWh | 22.6 mi |
Fort Powhatan Solar | Disputanta, VA | 318.0 GWh | 22 mi |
Gloucester Solar | Gloucester, VA | 37.5 GWh | 23.9 mi |
Gravel Neck | Surry, VA | 89.3 GWh | 0.7 mi |
Norge Solar Farm | Williamsburg, VA | 1.9 GWh | 14.4 mi |
Puller Solar | Topping, VA | 27.7 GWh | 30.8 mi |
Rochambeau Solar | Williamsburg, VA | 33.6 GWh | 13.1 mi |
Solidago Solar | Windsor, VA | 15.9 GWh | 19.1 mi |
Spring Grove I | Spring Grove, VA | 155.4 GWh | 12.2 mi |
TWE Myrtle Solar Farm, LLC | Suffolk, VA | 20.7 GWh | 26 mi |
Waste Management Bethel LFGTE | Hampton, VA | 37.4 GWh | 15.3 mi |
Waste Management Middle Peninsula LFGTE | Glenns, VA | 50.0 GWh | 24.8 mi |
Waverly Solar, LLC | Waverly, VA | 158.0 GWh | 25.4 mi |
Western Branch High School | Chesapeake, VA | 1.1 GWh | 27.2 mi |
WestRock-West Point Mill | West Point, VA | 504.4 GWh | 26.4 mi |
Woodland Solar Farm | Smithfield, VA | 30.0 GWh | 19.7 mi |