Sunnyside Cogen Associates
#1 Power Plant Road, Sunnyside, UT 84539Plant Summary Information
Sunnyside Cogen Associates is ranked #8 out of 14 coal plants nationwide in terms of total annual net electricity generation.
Sunnyside Cogen Associates is comprised of 1 generator and generated 100.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Sunnyside Cogen Associates |
---|---|
Utility Name | Sunnyside Cogeneration Assoc |
Location | Carbon County, UT |
Initial Operation Date | February 1993 |
Last Update | Sep 2024 |
Annual Generation | 340.7 GWh |
Annual Consumption | 4.6 M MMBtu |
Ranked #1,690 out of 11,852 Power Plants Nationwide | |
Ranked #8 out of 14 Waste/Other Coal Power Plants Nationwide | |
Ranked #11 out of 121 Utah Power Plants | |
Ranked #1 out of 1 Utah Waste/Other Coal Power Plants | |
Fuel Types | Waste/Other Coal : 99.8% |
Map of Sunnyside Cogen Associates
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sunnyside Cogen Associates.
Monthly Net Generation for Sunnyside Cogen Associates
Sunnyside Cogen Associates Details
Summary Information | |
---|---|
Plant Name | Sunnyside Cogen Associates (50951) |
Plant Address | #1 Power Plant Road, Sunnyside, UT 84539 |
Utility | Sunnyside Cogeneration Assoc (21734) |
Latitude, Longitude | 39.5472, -110.3917 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | February 1993 |
Annual Generation | 340.7 GWh |
Fuel Types | Waste/Other Coal : 99.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 86-556-003 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Grassy Trail Creek |
Ash Impoundment | No |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating February 1993
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 58.1 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 51 MW |
Winter Capacity | 51 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1993 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
---|---|
Energy Source | Waste/Other Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Fluidized Bed Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Sunnyside Cogen Associates Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Colmac Utah, Inc. | 1105 N. Market Street, Wilmington, DE 19801 | 50.00% |
Sunnyside Holdings I, Inc. | 1105 N. Market Street, Wilmington, DE 19801 | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Waste/Other Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Seward (PA) | New Florence, PA | 2.6 TWh |
#2 | Colver Green Energy | Colver, PA | 702.3 GWh |
#3 | St Nicholas Cogen Project | Shenandoah, PA | 634.9 GWh |
#4 | John B Rich Memorial Power Station | Frackville, PA | 624.1 GWh |
#5 | Grant Town Power Plant | Grant Town, WV | 598.7 GWh |
#6 | Northampton Generating Company LP | Northampton, PA | 499.4 GWh |
#7 | Panther Creek Energy Facility | Nesquehoning, PA | 476.5 GWh |
#9 | Colstrip Energy LP | Colstrip, MT | 306.2 GWh |
#10 | Scrubgrass Reclamation CO. LP. | Kennerdell, PA | 287.6 GWh |
#11 | Ebensburg Power | Ebensburg, PA | 285.1 GWh |
#12 | Westwood Generation LLC | Tremont, PA | 156.3 GWh |
#13 | Healy | Healy, AK | 385.0 GWh |
#14 | Foster Wheeler Mt Carmel Cogen | Marion Heights, PA | 103.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sunnyside Cogen Associates.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bartholomew | Springville, UT | 1.7 GWh | 72.7 mi |
Bonanza | Vernal, UT | 3.3 TWh | 69.6 mi |
Castle Solar, LLC | Huntington, UT | 66.0 GWh | 35.2 mi |
Graphite Solar I | Wellington, UT | 193.0 GWh | 17.1 mi |
Gunnison Solar | Gunnison, UT | 3.9 GWh | 79.7 mi |
Hunter | Castle Dale, UT | 3.5 TWh | 42.7 mi |
Hunter Solar LLC (UT) | Clawson, UT | 270.1 GWh | 45 mi |
Huntington | Huntington, UT | 2.4 TWh | 38.4 mi |
Hydro Plant No 3 | east of Ephraim, UT | 2.8 GWh | 55.6 mi |
Lake Creek Dam | Heber City, UT | 3.1 GWh | 81.5 mi |
Manti Lower | Manti, UT | 1.8 GWh | 68.7 mi |
Manti Upper | Manti, UT | 58.0 MWh | 68.7 mi |
Nebo Power Station | Payson, UT | 825.0 GWh | 79.4 mi |
Payson | Payson, UT | 5.0 MWh | 79.4 mi |
Spanish Fork | Spanish Fork, UT | 11.5 GWh | 74.2 mi |
Spanish Fork Community Solar | Spanish Fork, UT | 7.2 GWh | 77.1 mi |
Spanish Fork Wind Park 2 LLC | Spanish Fork, UT | 42.0 GWh | 72.8 mi |
Uintah | Neola, UT | 6.3 GWh | 70.6 mi |
Unit 4 | Mt Pleasent, UT | 3.2 GWh | 54.7 mi |
Whitehead | Springville, UT | 9.5 GWh | 78.5 mi |