Sunflower County
3766 Highway 49N, Ruleville, MS 38771Plant Summary Information
Sunflower County is ranked #28 out of 52 power plants in Mississippi in terms of total annual net electricity generation.
Sunflower County generated 27.7 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Sunflower County |
---|---|
Utility Name | Sunflower County Solar Project, LLC |
Location | Sunflower County, MS |
Initial Operation Date | September 2022 |
Last Update | Aug 2024 |
Annual Generation | 143.6 GWh |
Annual Consumption | 558.3 k MMBtu |
Ranked #2,719 out of 11,852 Power Plants Nationwide | |
Ranked #413 out of 5,655 Solar Power Plants Nationwide | |
Ranked #28 out of 52 Mississippi Power Plants | |
Ranked #2 out of 17 Mississippi Solar Power Plants | |
Fuel Types | Solar |
Map of Sunflower County
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sunflower County.
Monthly Net Generation for Sunflower County
Sunflower County Details
Summary Information | |
---|---|
Plant Name | Sunflower County (64081) |
Plant Address | 3766 Highway 49N, Ruleville, MS 38771 |
Utility | Sunflower County Solar Project, LLC (63718) |
Latitude, Longitude | 33.75777, -90.53647 |
Generation Dates on File | Sep 2022 to Aug 2024 |
Initial Operation Date | September 2022 |
Annual Generation | 143.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Entergy Mississippi LLC (12685) MS |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator SUNFL Details Operating September 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2022 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 110.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Sunflower County Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#403 | Union Springs Solar Center | Lake Butler, FL | 145.7 GWh |
#404 | Bay Tree | Harrells, NC | 145.6 GWh |
#405 | Columbia Solar Power Plant | Fort White, FL | 145.2 GWh |
#406 | Blue Heron Solar | Clewiston, FL | 145.0 GWh |
#407 | Regulus Solar Project | Bakersfield, CA | 144.5 GWh |
#408 | Palmer Solar | Fountain, CO | 144.1 GWh |
#409 | Santa Fe Solar Power Plant | Archer, FL | 143.9 GWh |
#410 | Rodeo Solar Center | Arcadia, FL | 143.9 GWh |
#411 | Prairie Creek FL | TBD, FL | 143.8 GWh |
#412 | Indian River Solar Center | Vero Beach, FL | 143.7 GWh |
#414 | Magnolia Springs Solar Center | Green Cove Springs, FL | 143.5 GWh |
#415 | Longbow Solar, LLC | Liverpool, TX | 143.4 GWh |
#416 | High Springs Solar Power Plant | High Springs, FL | 143.3 GWh |
#417 | Centerfield Cooper Solar, LLC | Chesterfield, SC | 142.9 GWh |
#418 | Eastover Solar | Eastover, SC | 142.2 GWh |
#419 | Encino Solar Energy Center | Rio Rancho Estates, NM | 142.2 GWh |
#420 | Palm Bay Solar | Palm Bay, FL | 142.0 GWh |
#421 | Dileo Solar | Clifton, TX | 142.0 GWh |
#422 | Pecan Solar | Pleasant Hill, NC | 141.8 GWh |
#423 | Cotton Creek Solar Energy Center | McDavid, FL | 141.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sunflower County.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Attala | Sallis, MS | 2.9 TWh | 71.4 mi |
Batesville Generation Facility | Batesville, MS | 4.6 TWh | 53 mi |
C&L | Star City, AR | 2.2 GWh | 77.3 mi |
CF Industries Yazoo City Complex | Yazoo City, MS | 145.6 GWh | 59.7 mi |
Chicot Solar | Lake Village, AR | 209.1 GWh | 50.6 mi |
Choctaw County | French Camp, MS | 5.6 TWh | 72 mi |
Clearwater Paper APP CB | Arkansas City, AR | 110.7 GWh | 40.4 mi |
Crossroads Energy Center | Clarksdale, MS | 207.9 GWh | 29.4 mi |
Dam 2 | Dumas, AR | 342.3 GWh | 47.4 mi |
Delta Wind Farm (MS) | Dundee, MS | 201.2 GWh | 49.8 mi |
Delta's Edge Solar | Greenwood, MS | 185.5 GWh | 30.8 mi |
Gerald Andrus | Greenville, MS | 221.5 GWh | 43.7 mi |
Harvest Gold Solar | Indianola, MS | 42.7 GWh | 18.4 mi |
L L Wilkins | Clarksdale, MS | 90.0 MWh | 29.5 mi |
Pine Bluff Energy Center | Pine Bluff, AR | 1.3 TWh | 84.5 mi |
Prairie Mist Solar | Montrose, AR | 5.4 GWh | 73.9 mi |
Quantum Choctaw Power LLC | Ackerman, MS | 2.9 TWh | 80.8 mi |
Red Hills Generating Facility | Ackerman, MS | 1.7 TWh | 80.3 mi |
Stuttgart Solar | Stuttgart, AR | 154.8 GWh | 69.9 mi |
Walnut Bend Solar Station PV | Moro, AR | 100.0 MWh | 74 mi |