Sun Valley Solar Project
884 HCR 3110 S, Abbott, TX 76621Plant Summary Information
Sun Valley Solar Project is ranked #18 out of 181 solar farms in Texas in terms of total annual net electricity generation.
Sun Valley Solar Project generated 94.8 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Sun Valley Solar Project |
---|---|
Utility Name | Sun Valley Solar LLC |
Location | Hill County, TX |
Initial Operation Date | December 2022 |
Last Update | Jan 2025 |
Annual Generation | 547.3 GWh |
Annual Consumption | 2.0 M MMBtu |
Ranked #1,211 out of 11,979 Power Plants Nationwide | |
Ranked #57 out of 5,765 Solar Power Plants Nationwide | |
Ranked #226 out of 774 Texas Power Plants | |
Ranked #18 out of 181 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Sun Valley Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sun Valley Solar Project.
Monthly Net Generation for Sun Valley Solar Project
Sun Valley Solar Project Details
Summary Information | |
---|---|
Plant Name | Sun Valley Solar Project (65303) |
Plant Address | 884 HCR 3110 S, Abbott, TX 76621 |
Utility | Sun Valley Solar LLC (64608) |
Latitude, Longitude | 31.86976, -97.01498 |
Generation Dates on File | Dec 2022 to Jan 2025 |
Initial Operation Date | December 2022 |
Annual Generation | 547.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator SUNS Details Operating December 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 250 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 250 MW |
Winter Capacity | 250 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 347.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Sun Valley Solar Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#47 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 566.1 GWh |
#48 | Oberon II Solar Project | Desert Center, CA | 564.7 GWh |
#49 | Blythe Mesa Solar II | Blythe, CA | 557.1 GWh |
#50 | AV Solar Ranch One | Lancaster, CA | 569.2 GWh |
#51 | RE Maplewood | McCamey, TX | 563.8 GWh |
#52 | Eiffel Solar Project | Paris, TX | 562.7 GWh |
#53 | Dodge Flat | Reno, NV | 552.2 GWh |
#54 | Golden Field Solar III, LLC | Rosamond, CA | 545.9 GWh |
#55 | Oberon Solar Project | Desert Center, CA | 532.4 GWh |
#56 | Daggett 2 | Daggett, CA | 536.0 GWh |
#58 | Desert Sunlight 250, LLC | Desert Center, CA | 543.5 GWh |
#59 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 535.8 GWh |
#60 | Dunn's Bridge 1 Solar | Wheatfield, IN | 532.7 GWh |
#61 | ENGIE Long Draw Solar LLC | Gail, TX | 530.2 GWh |
#62 | Texas Solar Nova 2 | Spur, TX | 524.9 GWh |
#63 | Yellowbud Solar, LLC | Williamsport, OH | 523.0 GWh |
#64 | Phoebe Solar | Kermit, TX | 520.2 GWh |
#65 | Azure Sky Solar | Haskell, TX | 512.2 GWh |
#66 | Victory Pass | Desert Center, CA | 513.8 GWh |
#67 | Galloway 1 Solar Farm | Paint Rock, TX | 511.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sun Valley Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bosque County Peaking | Laquna Park, TX | 4.0 TWh | 20.2 mi |
BPL Files Solar | Itasca, TX | 279.4 GWh | 22 mi |
BPL Sol Solar LLC | Chilton, TX | 193.8 GWh | 36.4 mi |
Briar Creek Solar 1 | Corsicana, TX | 231.7 GWh | 28.7 mi |
Copperhead Solar, LLC | Riesel, TX | 111.2 GWh | 30.4 mi |
Dileo Solar | Clifton, TX | 152.6 GWh | 29.7 mi |
Elm Branch Solar 1 | Bardwell, TX | 263.2 GWh | 30.9 mi |
Griffin Solar | Robinson, TX | 11.3 GWh | 28.3 mi |
Hubbard Wind | Mt Calm, TX | 989.8 GWh | 12.8 mi |
Limestone Wind Project | Coolidge, TX | 734.7 GWh | 22.9 mi |
Markum Solar Farm | Valley Mills, TX | 61.3 GWh | 24.4 mi |
Pisgah Ridge Solar, LLC | Richland, TX | 503.8 GWh | 32.2 mi |
Pitts Dudik Solar | Hubbard, TX | 106.8 GWh | 8.4 mi |
Prairie Hill Wind Project | Mart, TX | 187.1 GWh | 23 mi |
Roseland Solar Project, LLC | Riesel, TX | 946.0 GWh | 30.4 mi |
Sandy Creek Energy Station | Riesel, TX | 3.0 TWh | 27.5 mi |
TPE Whitney Solar, LLC | Kopperl, TX | 18.8 GWh | 23.3 mi |
True North Solar, LLC | Otto, TX | 67.4 GWh | 30.6 mi |
Waco Solar | Mount Calm, TX | 835.8 GWh | 15.9 mi |
Whitney | Clifton, TX | 2.5 GWh | 20.6 mi |