Sun Streams 3
35911 W Narramore, Arlington, AZ 85322Plant Summary Information
Sun Streams 3 is ranked #30 out of 159 power plants in Arizona in terms of total annual net electricity generation.
Sun Streams 3 generated 187.2 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Sun Streams 3 |
---|---|
Utility Name | Sun Streams PVS, LLC |
Location | Maricopa County, AZ |
Initial Operation Date | Not Available |
Last Update | Dec 2024 |
Annual Generation | 547.4 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,206 out of 11,949 Power Plants Nationwide | |
Ranked #120 out of 5,739 Solar Power Plants Nationwide | |
Ranked #30 out of 159 Arizona Power Plants | |
Ranked #9 out of 106 Arizona Solar Power Plants | |
Fuel Types | Solar : 69.9% Electricity used for energy storage : 30.1% |
Map of Sun Streams 3
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sun Streams 3.
Monthly Net Generation for Sun Streams 3
Sun Streams 3 Details
Summary Information | |
---|---|
Plant Name | Sun Streams 3 (67285) |
Plant Address | 35911 W Narramore, Arlington, AZ 85322 |
Utility | Sun Streams PVS, LLC (66151) |
Latitude, Longitude | 33.33167, -112.81194 |
Generation Dates on File | May 2024 to Dec 2024 |
Initial Operation Date | Not Available |
Annual Generation | 547.4 GWh |
Fuel Types | Solar : 69.9% Electricity used for energy storage : 30.1% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 20-24-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Arizona Public Service Company (AZPS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Salt River Project (16572) AZ |
Grid Voltage | 525.00 kV |
Energy Storage | Yes |
Sun Streams 3 Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#110 | Yellow Pine Solar | Enterprise, NV | 381.0 GWh |
#111 | RE Garland | Rosamond, CA | 383.7 GWh |
#112 | North Rosamond Solar LLC | Rosamond, CA | 392.7 GWh |
#113 | Riverstart Solar Park LLC | Modoc, IN | 388.6 GWh |
#114 | Imperial Solar Energy Center West | Seeley, CA | 388.3 GWh |
#115 | Buena Vista Energy Center | Chaparral, NM | 384.6 GWh |
#116 | Brazoria County Solar Project (Danciger) | Damon, TX | 387.4 GWh |
#117 | Chestnut | Lemoore, CA | 384.5 GWh |
#118 | Hillcrest Solar | Mt. Orab, OH | 384.3 GWh |
#119 | Mustang Two | Lemoore, CA | 384.1 GWh |
#121 | Holstein 1 Solar Farm | Wingate, TX | 382.1 GWh |
#122 | Solar Gen 2 Solar Facility | Calipatria, CA | 376.5 GWh |
#123 | Buckthorn Westex | Ft. Stockton, TX | 376.1 GWh |
#124 | Maverick Solar, LLC | Desert Center, CA | 375.4 GWh |
#125 | Madison Fields Solar Project, LLC | Irwin, OH | 370.6 GWh |
#126 | Indiana Crossroads Solar Park | Reynolds, IN | 367.8 GWh |
#127 | Prairie Wolf Solar LLC | Ashmore Township, IL | 366.6 GWh |
#128 | RE Roserock | Fort Stockton, TX | 365.8 GWh |
#129 | Blythe Solar III, LLC Hybrid | Blythe, CA | 349.4 GWh |
#130 | Calhoun Solar | Battle Creek, MI | 358.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sun Streams 3.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agave | AZ | 98.9 GWh | 1.7 mi |
Arlington Valley Energy Facility | Arlington, AZ | 3.6 TWh | 4.5 mi |
Arlington Valley Solar Energy II | Arlington, AZ | 348.5 GWh | 2.2 mi |
Badger 1 | Tonopah, AZ | 33.2 GWh | 11.5 mi |
Buckeye Union HS District 201 | Buckeye, AZ | 6.3 GWh | 14.9 mi |
Desert Star Hybrid | Buckeye, AZ | 30.0 GWh | 15.6 mi |
Harquahala Generating Project | Tonopah, AZ | 3.3 TWh | 20 mi |
Mesquite Generating Station Block 1 | Arlington, AZ | 3.6 TWh | 3.2 mi |
Mesquite Generating Station Block 2 | Arlington, AZ | 3.4 TWh | 3.2 mi |
Mesquite Solar 1 | Tonopah, AZ | 403.9 GWh | 5.4 mi |
Mesquite Solar 2, LLC | Tonopah, AZ | 276.6 GWh | 5.7 mi |
Mesquite Solar 3, LLC | Tonopah, AZ | 456.3 GWh | 7.3 mi |
Mesquite Solar 4, LLC | Tonopah, AZ | 146.8 GWh | 6.2 mi |
Mesquite Solar 5, LLC | Tonopah, AZ | 117.0 GWh | 6.1 mi |
Palo Verde | Wintersburg, AZ | 32.4 TWh | 4.8 mi |
Red Hawk | Arlington, AZ | 4.2 TWh | 1.7 mi |
Saddle Mountain Solar I | Tonopah, AZ | 30.9 GWh | 21.5 mi |
Sonoran Solar Energy | Buckeye, AZ | 1.1 TWh | 16.6 mi |
Sun Streams 2 | Hassayampa, AZ | 311.9 GWh | 0.8 mi |
Sun Streams, LLC | Arlington, AZ | 408.0 GWh | 1.8 mi |