Sun Streams 2
TBD, Hassayampa, AZ 85322Plant Summary Information
Sun Streams 2 is ranked #39 out of 158 power plants in Arizona in terms of total annual net electricity generation.
Sun Streams 2 generated 86.6 GWh during the 3-month period between August 2024 to November 2024.
Plant Name | Sun Streams 2 |
---|---|
Utility Name | Sun Streams 2, LLC |
Location | Maricopa County, AZ |
Initial Operation Date | June 2021 |
Last Update | Nov 2024 |
Annual Generation | 311.7 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,811 out of 11,899 Power Plants Nationwide | |
Ranked #157 out of 5,700 Solar Power Plants Nationwide | |
Ranked #39 out of 158 Arizona Power Plants | |
Ranked #11 out of 105 Arizona Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
First Solar Project Development (2019 to 2020) Sun Streams 2, LLC (2021 to 2023) |
Map of Sun Streams 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sun Streams 2.
Monthly Net Generation for Sun Streams 2
Sun Streams 2 Details
Summary Information | |
---|---|
Plant Name | Sun Streams 2 (63440) |
Plant Address | TBD, Hassayampa, AZ 85322 |
Utility | Sun Streams 2, LLC (64851) |
Latitude, Longitude | 33.32041, -112.81677 |
Generation Dates on File | Jun 2021 to Nov 2024 |
Initial Operation Date | June 2021 |
Annual Generation | 311.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | N/A |
Ash Impoundment | |
Transmission / Distribution Owner | Salt River Project (16572) AZ |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator GEN01 Details Operating June 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 150 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 199.2 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Sun Streams 2 Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#147 | Umbriel Solar | Livington, TX | 329.3 GWh |
#148 | Campo Verde Solar | El Centro, CA | 328.6 GWh |
#149 | Hecate Energy Highland LLC | Buford, OH | 328.3 GWh |
#150 | Sun Streams 3 | Arlington, AZ | 458.2 GWh |
#151 | BigBeau Solar, LLC | Rosamond, CA | 325.0 GWh |
#152 | American Kings Solar, LLC | Lemoore, CA | 324.0 GWh |
#153 | CA Flats Solar 150, LLC | Shandon, CA | 323.3 GWh |
#154 | Fort Powhatan Solar | Disputanta, VA | 322.1 GWh |
#155 | Lily Solar Hybrid | Scurry, TX | 315.5 GWh |
#156 | Midway Solar - TX | Fort Stockton, TX | 315.7 GWh |
#158 | Storey Solar and Storage | Coolidge, AZ | 299.1 GWh |
#159 | Edwards Sanborn E2 | Mojave, CA | 294.9 GWh |
#160 | Cove Mountain Solar 2 | Beryl, UT | 310.5 GWh |
#161 | Montague Solar | Arlington, OR | 310.0 GWh |
#162 | Quitman II Solar | Quitman, GA | 309.3 GWh |
#163 | Drew Solar LLC | Calexico, CA | 308.3 GWh |
#164 | Blythe Solar IV, LLC | Blythe, CA | 299.9 GWh |
#165 | Elora Solar | Elora, TN | 307.5 GWh |
#166 | Maverick Solar 7, LLC | Desert Center, CA | 303.2 GWh |
#167 | SR DeSoto I, LLC | DeSoto, GA | 302.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sun Streams 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agave | AZ | 76.3 GWh | 1.3 mi |
Arlington Valley Energy Facility | Arlington, AZ | 3.6 TWh | 4.5 mi |
Arlington Valley Solar Energy II | Arlington, AZ | 348.5 GWh | 1.5 mi |
Badger 1 | Tonopah, AZ | 33.2 GWh | 12.3 mi |
Buckeye Union HS District 201 | Buckeye, AZ | 6.3 GWh | 15.5 mi |
Desert Star Hybrid | Buckeye, AZ | 30.0 GWh | 15.1 mi |
Harquahala Generating Project | Tonopah, AZ | 3.0 TWh | 20.2 mi |
Mesquite Generating Station Block 1 | Arlington, AZ | 3.5 TWh | 3.2 mi |
Mesquite Generating Station Block 2 | Arlington, AZ | 3.4 TWh | 3.2 mi |
Mesquite Solar 1 | Tonopah, AZ | 403.9 GWh | 5.3 mi |
Mesquite Solar 2, LLC | Tonopah, AZ | 276.3 GWh | 5.5 mi |
Mesquite Solar 3, LLC | Tonopah, AZ | 456.0 GWh | 7.2 mi |
Mesquite Solar 4, LLC | Tonopah, AZ | 138.8 GWh | 5.9 mi |
Mesquite Solar 5, LLC | Tonopah, AZ | 116.3 GWh | 5.9 mi |
Palo Verde | Wintersburg, AZ | 32.4 TWh | 5.3 mi |
Red Hawk | Arlington, AZ | 3.9 TWh | 1.7 mi |
Saddle Mountain Solar I | Tonopah, AZ | 30.9 GWh | 21.4 mi |
Sonoran Solar Energy | Buckeye, AZ | 1.1 TWh | 16.6 mi |
Sun Streams 3 | Arlington, AZ | 458.2 GWh | 0.8 mi |
Sun Streams, LLC | Arlington, AZ | 407.9 GWh | 2.2 mi |