Summit Winds
4388 Dyer Road, Livermore, CA 94551Plant Summary Information
Summit Winds is ranked #42 out of 108 wind farms in California in terms of total annual net electricity generation.
Summit Winds generated 63.4 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Summit Winds |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | Alameda County, CA |
Initial Operation Date | July 2021 |
Last Update | Aug 2024 |
Annual Generation | 166.5 GWh |
Annual Consumption | 627.0 k MMBtu |
Ranked #2,533 out of 11,835 Power Plants Nationwide | |
Ranked #765 out of 1,343 Wind Power Plants Nationwide | |
Ranked #287 out of 1,569 California Power Plants | |
Ranked #42 out of 108 California Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Altamont Winds, LLC (2020 to 2020) Greenbacker Renewable Energy Corporation (2021 to 2023) |
Map of Summit Winds
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Summit Winds.
Monthly Net Generation for Summit Winds
Summit Winds Details
Summary Information | |
---|---|
Plant Name | Summit Winds (64326) |
Plant Address | 4388 Dyer Road, Livermore, CA 94551 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 37.76115, -121.69067 |
Generation Dates on File | Jul 2021 to Aug 2024 |
Initial Operation Date | July 2021 |
Annual Generation | 166.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 60.00 kV |
Energy Storage | No |
Generator DYER Details Operating July 2021
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 47.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 46.2 MW |
Winter Capacity | 46.2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 19 |
Turbine Details | |
Number Of Turbines | 19 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.5-116 |
Design Wind Speed | 17 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 295.3 |
Generator FRICK Details Operating July 2021
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 4 |
Turbine Details | |
Number Of Turbines | 4 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.5-116 |
Design Wind Speed | 17 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.6 |
Summit Winds Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#755 | Meadow Lake Wind Farm IV | Lafayette, IN | 172.8 GWh |
#756 | Casa Mesa Wind Energy Center Hybrid | House, NM | 172.1 GWh |
#757 | Whitewater Hill Wind Partners | North Palm Springs, CA | 171.9 GWh |
#758 | FPL Energy Oliver Wind I LLC | Center, ND | 171.5 GWh |
#759 | Delta Wind Farm (MS) | Dundee, MS | 169.9 GWh |
#760 | Chevelon Butte Phase 2 | Winslow, AZ | 169.5 GWh |
#761 | Woodward Mountain II | Girvin, TX | 168.8 GWh |
#762 | Allegheny Ridge Wind Farm | Portage, PA | 167.6 GWh |
#763 | Highland North Wind Farm | Sidman, PA | 167.3 GWh |
#764 | Whitetail | Oilton, TX | 166.7 GWh |
#766 | Hawkeye Power Partners LLC | Garner, IA | 166.1 GWh |
#767 | Sweetwater Wind 5 | Roscoe, TX | 165.2 GWh |
#768 | Centennial Wind Farm | Fort Supply, OK | 164.2 GWh |
#769 | Ashtabula Wind III LLC | Luverne, ND | 163.9 GWh |
#770 | Heartland Farms | Middleton, MI | 162.6 GWh |
#771 | Milford Wind Corridor Stage II LLC | Milford, UT | 162.6 GWh |
#772 | Whitney Hill Wind Power LLC | Mt.Pulaski, IL | 162.0 GWh |
#773 | Cedar Ridge | Eden, WI | 161.3 GWh |
#774 | Bliss | Bliss, NY | 160.8 GWh |
#775 | Langdon Wind II LLC | Osnabrock, ND | 159.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Summit Winds.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Altamont Gas Recovery | Livermore, CA | 39.4 GWh | 2.4 mi |
Ameresco Vasco Road | Livermore, CA | 31.5 GWh | 2.1 mi |
Buena Vista Energy LLC | Byron, CA | 90.9 GWh | 3.3 mi |
Byron Highway Solar | Byron, CA | 12.8 GWh | 7.2 mi |
CSD 2 - Heritage High | Brentwood, CA | 1.9 GWh | 11.7 mi |
Diablo Winds LLC | Livermore, CA | 35.8 GWh | 4.2 mi |
Foundation ST | Tracy, CA | 1.8 GWh | 9.8 mi |
Golden Hills North Wind Energy Center | Livermore, CA | 127.1 GWh | 3.4 mi |
Golden Hills Wind | Livermore, CA | 247.8 GWh | 4.3 mi |
Kaiser Owens Dr. Fuel Cell | Pleasanton, CA | 7.6 GWh | 11.9 mi |
Mariposa Energy Project | Byron, CA | 92.8 GWh | 5.2 mi |
Medline Ind. Phase 2 Tracy | Tracy, CA | 2.0 GWh | 10.1 mi |
Pleasanton - Amador Valley High School | Pleasanton, CA | 1.5 GWh | 12.2 mi |
Prologis L.P | Tracy, CA | 2.7 GWh | 9.1 mi |
Santa Rita Jail Fuel Cell | Dublin, CA | 11.1 GWh | 11.1 mi |
Santa Rita Jail Hybrid | Dublin, CA | 13.1 GWh | 11.1 mi |
Tracy 210 | Tracy, CA | 15.9 GWh | 9.1 mi |
Tracy Combined Cycle Power Plant | Tracy, CA | 929.6 GWh | 11.5 mi |
Vasco Winds | Livermore, CA | 216.0 GWh | 2.5 mi |
Whitethorn Solar LLC | Livermore, CA | 5.6 GWh | 5.1 mi |