Summer Solar B2
46331 1/4 90th St West, Lancaster, CA 93536Plant Summary Information
Summer Solar B2 is ranked #513 out of 799 solar farms in California in terms of total annual net electricity generation.
Summer Solar B2 generated 757.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Summer Solar B2 |
---|---|
Utility Name | AES Distributed Energy |
Location | Los Angeles County, CA |
Initial Operation Date | June 2014 |
Last Update | Dec 2023 |
Annual Generation | 3.2 GWh |
Annual Consumption | 11.5 k MMBtu |
Ranked #8,795 out of 11,835 Power Plants Nationwide | |
Ranked #3,689 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,220 out of 1,569 California Power Plants | |
Ranked #513 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Silverado Power (2013 to 2014) Sustainable Power Group, LLC (2015 to 2020) AES Distributed Energy (2021 to 2023) |
Map of Summer Solar B2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Summer Solar B2.
Monthly Net Generation for Summer Solar B2
Summer Solar B2 Details
Summary Information | |
---|---|
Plant Name | Summer Solar B2 (58754) |
Plant Address | 46331 1/4 90th St West, Lancaster, CA 93536 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 34.72306, -118.28972 |
Generation Dates on File | Jun 2014 to Dec 2023 |
Initial Operation Date | June 2014 |
Annual Generation | 3.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator SSB2 Details Operating June 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 193 |
Tilt Angle | 25 |
DC Net Capacity | 2.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Summer Solar B2 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3679 | Westerlo NY 1 | South Westerlo, NY | 3.3 GWh |
#3680 | San Luis Solar Garden | Antonito, CO | 3.3 GWh |
#3681 | Amazon | Carteret, NJ | 3.3 GWh |
#3682 | Telegraph Rd #2 Community Solar Farm | Pike, NY | 3.2 GWh |
#3683 | Jones Dairy | Fort Atkinson, WI | 3.2 GWh |
#3684 | Conagra Foods at St. Elmo | St. Elmo, IL | 3.2 GWh |
#3685 | TIA Solar | Tampa, FL | 3.2 GWh |
#3686 | Palmer Solar LLC | Palmer, MA | 3.2 GWh |
#3687 | Curtis Hill Solar CSG | Charlton, MA | 3.2 GWh |
#3688 | DGS Central California Womens Facility | Chowchilla, CA | 3.2 GWh |
#3690 | Minisink Community Solar 2 LLC | Minisink, NY | 3.2 GWh |
#3691 | Lafayette Solar I, LLC | Shelby, NC | 3.2 GWh |
#3692 | 100 Lower | Minisink, NY | 3.2 GWh |
#3693 | Mereand CSG | Watertown, NY | 3.2 GWh |
#3694 | Warsaw I | Warsaw, NC | 3.2 GWh |
#3695 | Pearl II | Batavia, NY | 3.2 GWh |
#3696 | Pine Ridge | Apache, OK | 3.2 GWh |
#3697 | Oxon Run CREF | Washington, DC | 3.2 GWh |
#3698 | Porterville 6 and 7 | Porterville, CA | 3.2 GWh |
#3699 | Target Woodland Solar Project | Woodland, CA | 3.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Summer Solar B2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antelope DSR 3 | Lancaster, CA | 36.2 GWh | 1.3 mi |
Antelope Expansion 1B | Lancaster, CA | 46.9 GWh | 1.8 mi |
Central Antelope Dry Ranch B LLC | Lancaster, CA | 7.2 GWh | 1.4 mi |
Central Antelope Dry Ranch C | Lancaster, CA | 28.8 GWh | 0.6 mi |
Elevation Solar C | Lancaster, CA | 97.4 GWh | 1 mi |
Horn | Lancaster, CA | 2.9 GWh | 1.3 mi |
Lancaster Dry Farm Ranch B | Lancaster, CA | 9.4 GWh | 0.4 mi |
North Lancaster Ranch | Lancaster, CA | 28.9 GWh | 1.3 mi |
Portal Ridge Solar B, LLC | Lancaster, CA | 38.6 GWh | 0.6 mi |
Portal Ridge Solar C, LLC | Lancaster, CA | 17.1 GWh | 1.1 mi |
Rodeo Solar C2 | Lancaster, CA | 3.5 GWh | 0.7 mi |
Rodeo Solar D2 | Lancaster, CA | 3.5 GWh | 0.7 mi |
San Pablo Raceway | Lancaster, CA | 266.3 GWh | 0.5 mi |
Summer North Solar | Lancaster, CA | 11.1 GWh | 0 mi |
Summer Solar A2 | Lancaster, CA | 3.4 GWh | 0 mi |
Summer Solar C2 | Lancaster, CA | 1.8 GWh | 0 mi |
Summer Solar D2 | Lancaster, CA | 2.0 GWh | 0 mi |
Summer Solar LLC | Lancaster, CA | 40.9 GWh | 1.3 mi |
TA-High Desert LLC | Lancaster, CA | 45.4 GWh | 1.3 mi |
Western Antelope Blue Sky B | Lancaster, CA | 49.3 GWh | 1.5 mi |