Summer Solar B2
46331 1/4 90th St West, Lancaster, CA 93536Plant Summary Information
Summer Solar B2 is ranked #472 out of 747 solar farms in California in terms of total annual net electricity generation.
Summer Solar B2 generated 945.5 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Summer Solar B2 |
---|---|
Utility Name | AES Distributed Energy |
Location | Los Angeles County, CA |
Initial Operation Date | June 2014 |
Last Update | Dec 2022 |
Annual Generation | 3.7 GWh |
Annual Consumption | 13.4 k MMBtu |
Ranked #8,238 out of 11,249 Power Plants Nationwide | |
Ranked #3,235 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,144 out of 1,501 California Power Plants | |
Ranked #472 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Silverado Power (2013 to 2014) Sustainable Power Group, LLC (2015 to 2020) AES Distributed Energy (2021 to 2022) |
Map of Summer Solar B2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Summer Solar B2.
Monthly Net Generation for Summer Solar B2
Summer Solar B2 Details
Summary Information | |
---|---|
Plant Name | Summer Solar B2 (58754) |
Plant Address | 46331 1/4 90th St West Lancaster, CA 93536 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 34.72306, -118.28972 |
Generation Dates on File | Jun 2014 to Dec 2022 |
Initial Operation Date | June 2014 |
Annual Generation | 3.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator SSB2 Details Operating June 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 193 |
Tilt Angle | 25 |
DC Net Capacity | 2.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Summer Solar B2 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3225 | Lindberg Field Solar 2 | San Diego, CA | 3.7 GWh |
#3226 | County Road 17 (CSG) | Afton, NY | 3.7 GWh |
#3227 | 0 Hammond St CSG | Carver, MA | 3.7 GWh |
#3228 | BlackRock-Matrix | South Brunswick, NJ | 3.7 GWh |
#3229 | Archdiocese of Baltimore J | Perryman, MD | 3.7 GWh |
#3230 | Vermilion Solar 1, LLC CSG | Danville, IL | 3.7 GWh |
#3231 | Centaurus Solar - MA | Ashland, MA | 3.7 GWh |
#3232 | Coronus Adelanto West 2 | Adelanto, CA | 3.7 GWh |
#3233 | Stafford St Solar 1 CSG | Leicester, MA | 3.7 GWh |
#3234 | Costanza Solar | Westerlo, NY | 3.7 GWh |
#3236 | City of Truth or Consequences PV | Truth or Consequences, NM | 3.7 GWh |
#3237 | Saw Solar | China Grove, NC | 3.7 GWh |
#3238 | Bowden Solar LLC | Monson, MA | 3.7 GWh |
#3239 | Adapture CA2, LLC | Orland, CA | 3.7 GWh |
#3240 | ATOOD Solar III LLC | Spartanburg, SC | 3.7 GWh |
#3241 | Hunker Solar River, LLC | Ruffs Dale, PA | 3.7 GWh |
#3242 | Workman Road Solar Farm, LLC | Lake City, MI | 3.7 GWh |
#3243 | PCSP3 Airport | Timberlake, NC | 3.7 GWh |
#3244 | Wachusett Solar | Rutland, MA | 3.7 GWh |
#3245 | Interstate Solar | Gervais, OR | 3.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Summer Solar B2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antelope DSR 3 | Lancaster, CA | 37.0 GWh | 1.3 mi |
Antelope Expansion 1B | Lancaster, CA | 2.4 GWh | 1.8 mi |
Central Antelope Dry Ranch B LLC | Lancaster, CA | 8.5 GWh | 1.4 mi |
Central Antelope Dry Ranch C | Lancaster, CA | 31.7 GWh | 0.6 mi |
Elevation Solar C | Lancaster, CA | 106.1 GWh | 1 mi |
Horn | Lancaster, CA | 3.2 GWh | 1.3 mi |
Lancaster Dry Farm Ranch B | Lancaster, CA | 12.4 GWh | 0.4 mi |
North Lancaster Ranch | Lancaster, CA | 29.4 GWh | 1.3 mi |
Portal Ridge Solar B, LLC | Lancaster, CA | 42.6 GWh | 0.6 mi |
Portal Ridge Solar C, LLC | Lancaster, CA | 25.3 GWh | 1.1 mi |
Rodeo Solar C2 | Lancaster, CA | 4.0 GWh | 0.7 mi |
Rodeo Solar D2 | Lancaster, CA | 3.3 GWh | 0.7 mi |
San Pablo Raceway | Lancaster, CA | 254.4 GWh | 0.5 mi |
Summer North Solar | Lancaster, CA | 13.0 GWh | 0 mi |
Summer Solar A2 | Lancaster, CA | 3.9 GWh | 0 mi |
Summer Solar C2 | Lancaster, CA | 2.6 GWh | 0 mi |
Summer Solar D2 | Lancaster, CA | 1.5 GWh | 0 mi |
Summer Solar LLC | Lancaster, CA | 67.1 GWh | 1.3 mi |
TA-High Desert LLC | Lancaster, CA | 49.4 GWh | 1.3 mi |
Western Antelope Blue Sky B | Lancaster, CA | 56.2 GWh | 1.5 mi |