Sugar Solar, LLC
Country Club & Steelman Road, Yadkinville, NC 27055Plant Summary Information
Sugar Solar, LLC is ranked #26 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Sugar Solar, LLC generated 38.3 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Sugar Solar, LLC |
---|---|
Utility Name | Sugar Solar, LLC |
Location | Yadkin County, NC |
Initial Operation Date | December 2021 |
Last Update | Aug 2024 |
Annual Generation | 109.9 GWh |
Annual Consumption | 418.5 k MMBtu |
Ranked #3,067 out of 11,836 Power Plants Nationwide | |
Ranked #553 out of 5,644 Solar Power Plants Nationwide | |
Ranked #67 out of 862 North Carolina Power Plants | |
Ranked #26 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Sugar Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sugar Solar, LLC.
Monthly Net Generation for Sugar Solar, LLC
Sugar Solar, LLC Details
Summary Information | |
---|---|
Plant Name | Sugar Solar, LLC (63807) |
Plant Address | Country Club & Steelman Road, Yadkinville, NC 27055 |
Utility | Sugar Solar, LLC (63493) |
Latitude, Longitude | 36.1607, -80.6574 |
Generation Dates on File | Jan 2022 to Aug 2024 |
Initial Operation Date | December 2021 |
Annual Generation | 109.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 19-17-000, 19-18-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 100.00 kV |
Energy Storage | No |
Generator PGR29 Details Operating December 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 60 MW |
Summer Capacity | 60 MW |
Winter Capacity | 60 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 60 |
DC Net Capacity | 81.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Sugar Solar, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#543 | Moffett Solar Project | Ridgeland, SC | 113.2 GWh |
#544 | SolaireHolman Solar Project | Alpine, TX | 113.1 GWh |
#545 | Beacon Solar Plant Site 2 | Cantil, CA | 113.0 GWh |
#546 | SR Turkey Creek, LLC | Lancaster, KY | 113.0 GWh |
#547 | Silver State Solar Power North | Primm, NV | 112.8 GWh |
#548 | Southampton Solar, LLC | Newsoms, VA | 111.6 GWh |
#549 | Pineapple | Port St Lucie, FL | 111.5 GWh |
#550 | Sandstone Solar | Florence, AZ | 111.1 GWh |
#551 | Lick Creek Solar, LLC | Walnut Cove, NC | 110.4 GWh |
#552 | Pavant Solar, LLC | Fillmore, UT | 110.1 GWh |
#554 | Luning Energy | Luning, NV | 109.2 GWh |
#555 | Durrance | Mulberry, FL | 109.1 GWh |
#556 | Mule Creek Renewable Energy Center | Panama City, FL | 109.0 GWh |
#557 | Bedford Solar | Chesapeake, VA | 108.4 GWh |
#558 | Oak Solar | Gaston, NC | 108.3 GWh |
#559 | Kellam Solar | Ben Wheeler, TX | 107.7 GWh |
#560 | Adams Solar LLC PA | Gettysburg, PA | 106.8 GWh |
#561 | Riverside Solar | Ruskin, FL | 106.4 GWh |
#562 | Canoe | Holt, FL | 106.4 GWh |
#563 | Turquoise Nevada, LLC | Sparks, NV | 106.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sugar Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
1001 Ebenezer Church Solar | StateRoad, NC | 5.1 GWh | 13.4 mi |
1008 Matthews Solar | East Bend, NC | 8.6 GWh | 7 mi |
1009 Yadkin Solar | Yadkinville, NC | 8.3 GWh | 0.9 mi |
1045 Tomlin Mill Solar | Statesville, NC | 8.1 GWh | 19.6 mi |
1047 Little Mountain Solar, LLC | Jonesville, NC | 3.5 GWh | 8.7 mi |
1051 Lucky Solar, LLC | Hamptonville, NC | 4.6 GWh | 9.1 mi |
Ararat Rock Solar, LLC | Mount Airy, NC | 5.7 GWh | 21 mi |
Ashley Solar Farm | Hamptonville, NC | 7.2 GWh | 8.2 mi |
Carolina Lily Solar | Advance, NC | 7.5 GWh | 18.5 mi |
COC Surry LFG, LLC | Mount Airy, NC | 7.6 GWh | 19.8 mi |
Hayes Solar, LLC | Dobson, NC | 6.8 GWh | 16.3 mi |
Mayberry Solar LLC | Mt. Airy, NC | 1.5 GWh | 22.1 mi |
Mocksville Farm | Mocksville, NC | 9.2 GWh | 20.5 mi |
Partin Solar | Elkin, NC | 38.3 GWh | 11.8 mi |
Pilot Mountain Solar, LLC | King, NC | 10.2 GWh | 17.4 mi |
Ray Wilson Solar | Advance, NC | 8.1 GWh | 22.2 mi |
South Winston Farm, LLC | Winston-Salem, NC | 9.0 GWh | 21.8 mi |
Stony Knoll Solar, LLC | Rockford, NC | 39.4 GWh | 8.8 mi |
Yadkin 601 Farm | Yadkinville, NC | 5.7 GWh | 3.5 mi |
Yadkinville Solar | Yadkinville, NC | 6.3 GWh | 3.8 mi |