Subase Microgrid Project
Naval Submarine Base New Londo, Groton, CT 6340Plant Summary Information
Subase Microgrid Project is ranked #37 out of 156 power plants in Connecticut in terms of total annual net electricity generation.
Subase Microgrid Project is comprised of 2 generators and generated 34.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Subase Microgrid Project |
---|---|
Utility Name | Connecticut Mun Elec Engy Coop |
Location | Southeastern Connecticut Planning Region, CT |
Initial Operation Date | December 2022 |
Last Update | Dec 2023 |
Annual Generation | 34.2 GWh |
Annual Consumption | 392.7 k MMBtu |
Ranked #4,374 out of 11,852 Power Plants Nationwide | |
Ranked #1,237 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #37 out of 156 Connecticut Power Plants | |
Ranked #22 out of 55 Connecticut Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Subase Microgrid Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Subase Microgrid Project.
Monthly Net Generation for Subase Microgrid Project
Subase Microgrid Project Details
Summary Information | |
---|---|
Plant Name | Subase Microgrid Project (59701) |
Plant Address | Naval Submarine Base New Londo, Groton, CT 6340 |
Utility | Connecticut Mun Elec Engy Coop (4180) |
Latitude, Longitude | 41.40001, -72.08599 |
Generation Dates on File | Dec 2022 to Dec 2023 |
Initial Operation Date | December 2022 |
Annual Generation | 34.2 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Groton Dept of Utilities - (CT) (7716) CT |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | YANKEE GAS SVC CO |
Natural Gas Storage | No |
Generator SFC1 Details Operating December 2022
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 3.7 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 3.7 MW |
Winter Capacity | 3.7 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Generator SFC2 Details Operating December 2022
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 3.7 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 3.7 MW |
Winter Capacity | 3.7 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Subase Microgrid Project Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Fuel Cell Energy | 3 Great Pasture Road, Danbury, CT 6810 | Generator SFC1 | 100.00% |
Fuel Cell Energy | 3 Great Pasture Road, Danbury, CT 6810 | Generator SFC2 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1227 | University of Tennessee Steam Plant | Knoxville, TN | 34.8 GWh |
#1228 | Domtar Paper Co LLC Plymouth NC | Plymouth, NC | 344.1 GWh |
#1229 | Butler-Warner Generation Plant | Fayetteville, NC | 38.2 GWh |
#1230 | Alpena Cement Plant | Alpena, MI | 176.1 GWh |
#1231 | Kern Oil & Refining Co | Bakersfield, CA | 34.5 GWh |
#1232 | Dartmouth Power Associates LP | Dartmouth, MA | 34.8 GWh |
#1233 | Inland Paperboard Packaging Rome | Rome, GA | 358.0 GWh |
#1234 | Total Energy Facilities | Carson, CA | 168.8 GWh |
#1235 | Keysight - Santa Rosa | Santa Rosa, CA | 34.4 GWh |
#1236 | San Jose Cogeneration | San Jose, CA | 34.3 GWh |
#1238 | Naval Sub Base New London Fuel Cell | Groton, CT | 34.2 GWh |
#1239 | US GSA Heating and Transmission | Washington, DC | 34.2 GWh |
#1240 | Decorative Panels Intl | Alpena, MI | 42.9 GWh |
#1241 | POET Biorefining - Shelbyville | Shelbyville, IN | 34.1 GWh |
#1242 | Greenleaf 2 Power Plant | Yuba City, CA | 34.0 GWh |
#1243 | Gerald Gentleman | Sutherland, NE | 6.8 TWh |
#1244 | College of New Jersey | Ewing, NJ | 33.7 GWh |
#1245 | Princeton University Cogeneration | Princeton, NJ | 53.2 GWh |
#1246 | Warrick | Newburgh, IN | 3.6 TWh |
#1247 | Longview Fibre | Longview, WA | 170.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Subase Microgrid Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antares-GRE 314 East Lyme LLC | East Lyme, CT | 4.1 GWh | 7.8 mi |
Bridge Street 1 & 2 | Groton, CT | 562.0 MWh | 2.6 mi |
CMEEC - Navy NE Trident | Groton, CT | 1.4 GWh | 0.5 mi |
CMEEC - Polaris Park Solar Hybrid | Gordon, CT | 4.9 GWh | 1.4 mi |
Conn Mun Electric Energy Coop | Norwich, CT | 1.3 GWh | 9.7 mi |
Connecticut College | New London, CT | 8.1 GWh | 1.6 mi |
Covanta Southeastern Connecticut Company | Preston, CT | 116.0 GWh | 5.3 mi |
Fort Hill 1, 2, 3 & 4 | Uncasville, CT | 701.0 MWh | 5 mi |
Foxwoods CoGen | Mashantucket, CT | 10.8 GWh | 8.2 mi |
Gary Court 1 & 2 | Groton, CT | 466.0 MWh | 5.6 mi |
Millstone | Waterford, CT | 16.0 TWh | 7.5 mi |
Montville Station | Uncasville, CT | 36.2 GWh | 2.1 mi |
Naval Sub Base New London Fuel Cell | Groton, CT | 34.2 GWh | 0 mi |
North Main Street | Norwich, CT | 138.5 MWh | 8.8 mi |
Norwich WWTP | Norwich, CT | 1.0 MWh | 8.7 mi |
Pfizer Groton Fuel Cell | Groton, CT | 42.1 GWh | 4.6 mi |
Pfizer Groton Plant | Groton, CT | 70.3 GWh | 4.7 mi |
Rand Whitney CHP Plant | Montville, CT | 133.7 GWh | 4.5 mi |
Water Treatment 1 & 2 | Groton, CT | 375.0 MWh | 4.3 mi |
Yale New Haven - New London | New London, CT | 14.6 GWh | 4.5 mi |