Stuttgart Solar
380 Goodwin Rd, Stuttgart, AR 72160Plant Summary Information
Stuttgart Solar is ranked #31 out of 73 power plants in Arkansas in terms of total annual net electricity generation.
Stuttgart Solar generated 50.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Stuttgart Solar |
---|---|
Utility Name | Stuttgart Solar, LLC |
Location | Arkansas County, AR |
Initial Operation Date | January 2018 |
Last Update | Aug 2024 |
Annual Generation | 157.5 GWh |
Annual Consumption | 597.5 k MMBtu |
Ranked #2,595 out of 11,835 Power Plants Nationwide | |
Ranked #348 out of 5,643 Solar Power Plants Nationwide | |
Ranked #31 out of 73 Arkansas Power Plants | |
Ranked #7 out of 27 Arkansas Solar Power Plants | |
Fuel Types | Solar |
Map of Stuttgart Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Stuttgart Solar.
Monthly Net Generation for Stuttgart Solar
Stuttgart Solar Details
Summary Information | |
---|---|
Plant Name | Stuttgart Solar (61262) |
Plant Address | 380 Goodwin Rd, Stuttgart, AR 72160 |
Utility | Stuttgart Solar, LLC (60871) |
Latitude, Longitude | 34.43972, -91.44 |
Generation Dates on File | Jan 2018 to Aug 2024 |
Initial Operation Date | January 2018 |
Annual Generation | 157.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Entergy Arkansas Inc (814) AR |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator STGRT Details Operating January 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 81 MW |
Summer Capacity | 81 MW |
Winter Capacity | 81 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 14 |
DC Net Capacity | 85.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Stuttgart Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#338 | Crescent Dunes Solar Energy | Tonopah, NV | 162.3 GWh |
#339 | Echo River Solar | Live Oak, FL | 158.9 GWh |
#340 | OE_ALD | Wing, AL | 161.1 GWh |
#341 | Crooked Lake Solar, LLC | Blytheville, AR | 161.0 GWh |
#342 | Alpine Solar | Lancaster, CA | 161.0 GWh |
#343 | Bulldog Solar LLC | Warrenton, GA | 159.2 GWh |
#344 | Hunter Solar, LLC (CO) | Bennett, CO | 159.0 GWh |
#345 | Bluegrass Solar | Church Hill, MD | 158.7 GWh |
#346 | Fort Green Solar Power Plant | Bowling Green, FL | 158.1 GWh |
#347 | Huntley | Bowman, SC | 157.8 GWh |
#349 | Willow Solar Energy Center | Myakka City, FL | 157.3 GWh |
#350 | Cove Mountain Solar | Beryl, UT | 156.5 GWh |
#351 | Okeechobee Solar | Vero Beach, FL | 156.1 GWh |
#352 | Spring Grove I | Spring Grove, VA | 155.4 GWh |
#353 | Hardeetown Solar Power Plant | Chiefland, FL | 154.6 GWh |
#354 | Gutenberg Solar | Garysburg, NC | 153.7 GWh |
#355 | Twin Rivers Solar Power Plant | Jasper, FL | 153.7 GWh |
#356 | Sabal Palm Solar Center | Loxahatchee, FL | 153.7 GWh |
#357 | Powells Creek Solar - Hybrid | Alton, VA | 153.1 GWh |
#358 | SR Perry | Perry, GA | 153.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Stuttgart Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
C&L | Star City, AR | 2.2 GWh | 33.5 mi |
Chicot Solar | Lake Village, AR | 210.7 GWh | 66.6 mi |
Clearwater Paper APP CB | Arkansas City, AR | 110.7 GWh | 52 mi |
Crossroads Energy Center | Clarksdale, MS | 207.9 GWh | 53.1 mi |
Dam 2 | Dumas, AR | 342.3 GWh | 32.1 mi |
Delta Wind Farm (MS) | Dundee, MS | 169.9 GWh | 59.7 mi |
FECC Solar Benton | Benton, AR | 1.1 GWh | 66.2 mi |
Forrest City- Eldridge Road | Forrest City, AR | 2.1 GWh | 54.8 mi |
Forrest City- Prison Site | Forrest City, AR | 2.1 GWh | 51.8 mi |
Gerald Andrus | Greenville, MS | 221.5 GWh | 77.5 mi |
Happy Solar 1 | Searcy, AR | 180.0 GWh | 51.8 mi |
Harry L. Oswald | Little Rock, AR | 941.0 GWh | 45.5 mi |
L L Wilkins | Clarksdale, MS | 90.0 MWh | 53.1 mi |
Murray | North Little Rock, AR | 142.4 GWh | 57.6 mi |
Pine Bluff Energy Center | Pine Bluff, AR | 1.3 TWh | 30.5 mi |
Pine Bluff Mill | Pine Bluff, AR | 289.0 GWh | 30.6 mi |
Searcy Solar Hybrid | Searcy, AR | 208.2 GWh | 56.6 mi |
Sunflower County | Ruleville, MS | 143.6 GWh | 69.9 mi |
Two Pine Landfill Gas Recovery | North Little Rock, AR | 26.5 GWh | 49 mi |
White Bluff | Redfield, AR | 2.8 TWh | 39.9 mi |