Stromland Solar
Prairie Moon Road, Cochrane, WI 54622Plant Summary Information
Stromland Solar is ranked #26 out of 54 solar farms in Wisconsin in terms of total annual net electricity generation.
Stromland Solar generated 1.1 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Stromland Solar |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | Buffalo County, WI |
Initial Operation Date | December 2021 |
Last Update | Dec 2022 |
Annual Generation | 4.8 GWh |
Annual Consumption | 16.3 k MMBtu |
Ranked #7,567 out of 11,249 Power Plants Nationwide | |
Ranked #2,676 out of 5,158 Solar Power Plants Nationwide | |
Ranked #146 out of 198 Wisconsin Power Plants | |
Ranked #26 out of 54 Wisconsin Solar Power Plants | |
Fuel Types | Solar |
Map of Stromland Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Stromland Solar.
Monthly Net Generation for Stromland Solar
Stromland Solar Details
Summary Information | |
---|---|
Plant Name | Stromland Solar (65088) |
Plant Address | Prairie Moon Road Cochrane, WI 54622 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 44.19955, -91.80897 |
Generation Dates on File | Jan 2022 to Dec 2022 |
Initial Operation Date | December 2021 |
Annual Generation | 4.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Riverland Energy Cooperative (16060) WI |
Grid Voltage | 15.00 kV |
Energy Storage | No |
Generator 510 Details Operating December 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
Tilt Angle | 50 |
DC Net Capacity | 3.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Stromland Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2666 | Grafton PV | Grafton, MA | 4.8 GWh |
#2667 | Shawnee - GA | Waynesboro, GA | 4.8 GWh |
#2668 | Trenton Solar Farm (MO) | Trenton, MO | 4.8 GWh |
#2669 | Kearsarge Haverhill | Haverhill, MA | 4.5 GWh |
#2670 | Bani Solar | Olanta, SC | 4.8 GWh |
#2671 | Adams | Piedmont, SC | 4.8 GWh |
#2672 | Iron Horse Solar I CSG | North Billerica, MA | 4.8 GWh |
#2673 | Lowndes Tycor Farms | Lake Park, GA | 4.8 GWh |
#2674 | Morgan Solar 1b CSG | Meredosia, IL | 4.8 GWh |
#2675 | Steel Sun | Lackawanna, NY | 4.8 GWh |
#2677 | Blue Lake Solar | Shakopee, MN | 4.8 GWh |
#2678 | Blacksmith Road Solar 1 | Falmouth, MA | 4.8 GWh |
#2679 | SR Skylark B | Severance, CO | 4.8 GWh |
#2680 | Crittenden Solar Facility | Dry Ridge, KY | 4.7 GWh |
#2681 | Galloway Landfill | Wall, NJ | 4.7 GWh |
#2682 | Moraine CSG | Downs, IL | 4.7 GWh |
#2683 | Chisago Holdco LLC, CSG | Center City, MN | 4.7 GWh |
#2684 | Titusville Solar | Titusville, NJ | 4.7 GWh |
#2685 | Tyngsborough Solar | Tyngsborough, MA | 4.7 GWh |
#2686 | Shamrock Solar LLC | Black River Falls, WI | 4.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Stromland Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arcadia Electric | Arcadia, WI | 206.1 MWh | 15.6 mi |
Arcadia Solar | Arcadia, WI | 8.2 GWh | 17.6 mi |
Carina Community Solar | Zumbro Falls, MN | 6.5 GWh | 21.6 mi |
FastSun 18 CSG | La Crescent, MN | 1.3 GWh | 33.2 mi |
GL Wind | Lewiston, MN | 12.5 GWh | 14.8 mi |
Hazel | Lanesboro, MN | 6.4 GWh | 29.7 mi |
John P Madgett | Alma, WI | 1.3 TWh | 8.8 mi |
Novel Denzer Solar LLC CSG | Minnesota City, MN | 914.0 MWh | 7.2 mi |
Novel Herber Solar CSG | Rollingstone, MN | 1.8 GWh | 7.5 mi |
Olmsted Waste Energy | Rochester, MN | 43.3 GWh | 33.2 mi |
Rochester Hydro | Mazeppa, MN | 11.4 GWh | 33.3 mi |
Rollingstone Holdco CSG | Rollingstone, MN | 7.1 GWh | 5.9 mi |
Rushford Village | Rushford Village, MN | 1.9 GWh | 27.2 mi |
St. Charles Power Plant | St. Charles, MN | 87.0 MWh | 19.9 mi |
St. Charles Solar | St Charles Township, MN | 3.2 GWh | 19 mi |
Stockton (MN) | Winona, MN | 4.1 GWh | 11.1 mi |
USS Bluff Country Solar CSG | Altura, MN | 2.0 GWh | 6.3 mi |
Wabasha Holdco Solar CSG | Wabasha, MN | 4.8 GWh | 15.6 mi |
Wabasha Solar | Wabasha, MN | 3.2 GWh | 15.4 mi |
Winona Solar | Altura, MN | 6.8 GWh | 6.9 mi |