Strauss Wind Farm
TBD, Lompoc, CA 93436Plant Summary Information
Strauss Wind Farm is ranked #35 out of 108 wind farms in California in terms of total annual net electricity generation.
Strauss Wind Farm generated 46.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Strauss Wind Farm |
---|---|
Utility Name | Strauss Wind LLC |
Location | Santa Barbara County, CA |
Initial Operation Date | December 2023 |
Last Update | Sep 2024 |
Annual Generation | 195.1 GWh |
Annual Consumption | 665.8 k MMBtu |
Ranked #2,341 out of 11,852 Power Plants Nationwide | |
Ranked #713 out of 1,345 Wind Power Plants Nationwide | |
Ranked #262 out of 1,570 California Power Plants | |
Ranked #35 out of 108 California Wind Power Plants | |
Fuel Types | Wind |
Map of Strauss Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Strauss Wind Farm.
Monthly Net Generation for Strauss Wind Farm
Strauss Wind Farm Details
Summary Information | |
---|---|
Plant Name | Strauss Wind Farm (62113) |
Plant Address | TBD, Lompoc, CA 93436 |
Utility | Strauss Wind LLC (61668) |
Latitude, Longitude | 34.57984, -120.56428 |
Generation Dates on File | Dec 2023 to Sep 2024 |
Initial Operation Date | December 2023 |
Annual Generation | 195.1 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator ST-CA Details Operating December 2023
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 95.3 MW |
Summer Capacity | 95.3 MW |
Winter Capacity | 95.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 27 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 27 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 3.8-137 |
Design Wind Speed | 15.1 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 267.4 |
Strauss Wind Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#703 | Windthorst-2 | Archer, TX | 201.0 GWh |
#704 | Flat Water Wind Farm LLC | Du Bois, NE | 200.7 GWh |
#705 | Milo Wind Project LLC | Portales, NM | 200.6 GWh |
#706 | Osceola Windpower II | Harris, IA | 200.3 GWh |
#707 | Buffalo Gap Wind Farm | Merkel, TX | 198.5 GWh |
#708 | Spearville 3 LLC | Spearville, KS | 198.2 GWh |
#709 | NWP Indian Mesa Wind Farm | Iraan, TX | 197.8 GWh |
#710 | Montezuma Wind II | Birds Landing, CA | 196.6 GWh |
#711 | Jericho Rise Wind Farm LLC | Chateaugay, NY | 196.1 GWh |
#712 | Weaver Wind | Township 16, ME | 195.2 GWh |
#714 | Nine Canyon | Kennewick, WA | 194.7 GWh |
#715 | Star Point Wind Project LLC | Wasco, OR | 194.0 GWh |
#716 | Cotton Plains Wind Farm | Floydada, TX | 193.6 GWh |
#717 | Golden Spread Panhandle Wnd Rch | Wilderado, TX | 192.5 GWh |
#718 | Windstar 1 | Tehachapi, CA | 192.5 GWh |
#719 | Shooting Star | Mullinville, KS | 192.4 GWh |
#720 | Jeffers Wind 20 LLC | Jeffers, MN | 192.0 GWh |
#721 | Wheat Field Wind Power Project | Arlington, OR | 190.8 GWh |
#722 | Pebble Springs Wind LLC | Wasco, OR | 190.5 GWh |
#723 | Spring Canyon Expansion Wind Energy Ctr | Peetz, CO | 189.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Strauss Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Atascadero State Hospital | Atascadero, CA | 2.8 GWh | 61.2 mi |
Broadway 3 - UCSB Lot 38 | Santa Barbara, CA | 2.5 GWh | 41.8 mi |
CA Flats Solar 130, LLC | Shandon, CA | 228.5 GWh | 72.1 mi |
CA Flats Solar 150, LLC | Shandon, CA | 327.6 GWh | 72.1 mi |
CA-DGS-California Men's Colony | San Luis Obispo, CA | 3.7 GWh | 52 mi |
California Valley Solar Ranch | California Valley, CA | 623.8 GWh | 63.1 mi |
Cold Canyon 1 | San Luis Obispo, CA | 10.0 GWh | 42 mi |
Cuyama Solar, LLC | Cuyama, CA | 74.5 GWh | 59.3 mi |
Diablo Canyon | Avila Beach, CA | 16.7 TWh | 46.7 mi |
Dome Project | Fellows, CA | 48.7 GWh | 71.1 mi |
Ellwood | Goleta, CA | 3.8 GWh | 39.2 mi |
Firestone Walker Brewery - Phase 1 | Paso Robles, CA | 3.9 GWh | 70.6 mi |
Midway Sunset Cogen | Fellows, CA | 267.3 GWh | 69.3 mi |
SEPV Cuyama Hybrid | New Cuyama, CA | 107.0 MWh | 60 mi |
Stenner Creek Solar | San Luis Obispo, CA | 700.0 MWh | 51.6 mi |
Sunrise Power LLC | Fellows, CA | 2.6 TWh | 70.5 mi |
Tajiguas Resource Recovery Project | Goleta, CA | 8.3 GWh | 26 mi |
Topaz Solar Farm | Santa Margarita, CA | 1.1 TWh | 63.6 mi |
Vandenberg Solar Project | Vandenberg Airforce B, CA | 38.9 GWh | 12.1 mi |
Vintner Solar | Templeton, CA | 3.9 GWh | 67.9 mi |