Storrie Lake Solar Project
480 NM Highway 250, Las Vegas, NM 87701Plant Summary Information
Storrie Lake Solar Project is ranked #72 out of 83 solar farms in New Mexico in terms of total annual net electricity generation.
Storrie Lake Solar Project generated 472.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Storrie Lake Solar Project |
---|---|
Utility Name | MSM Solar LLC |
Location | San Miguel County, NM |
Initial Operation Date | May 2014 |
Last Update | Dec 2023 |
Annual Generation | 2.5 GWh |
Annual Consumption | 9.0 k MMBtu |
Ranked #9,419 out of 11,852 Power Plants Nationwide | |
Ranked #4,207 out of 5,655 Solar Power Plants Nationwide | |
Ranked #122 out of 137 New Mexico Power Plants | |
Ranked #72 out of 83 New Mexico Solar Power Plants | |
Fuel Types | Solar |
Map of Storrie Lake Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Storrie Lake Solar Project.
Monthly Net Generation for Storrie Lake Solar Project
Storrie Lake Solar Project Details
Summary Information | |
---|---|
Plant Name | Storrie Lake Solar Project (58794) |
Plant Address | 480 NM Highway 250, Las Vegas, NM 87701 |
Utility | MSM Solar LLC (58681) |
Latitude, Longitude | 35.65694, -105.18389 |
Generation Dates on File | May 2014 to Dec 2023 |
Initial Operation Date | May 2014 |
Annual Generation | 2.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of New Mexico (PNM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Mora-San Miguel Elec Coop (12901) NM |
Grid Voltage | 24.90 kV |
Energy Storage | No |
Generator MSMPV Details Operating May 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Storrie Lake Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4197 | Woodoak Drive Community Solar Farm CSG | Tusten, NY | 2.5 GWh |
#4198 | Santa Rita Jail Hybrid | Dublin, CA | 13.1 GWh |
#4199 | IKEA Tejon 345 | Lebec, CA | 2.5 GWh |
#4200 | Bryan Solar Field | Bryan, OH | 2.5 GWh |
#4201 | Emmitsburg Solar Arrays | Emmitsburg, MD | 2.5 GWh |
#4202 | Amazon Maryland DCA1 | Sparrows Point, MD | 2.5 GWh |
#4203 | Park St | Rutland, VT | 2.5 GWh |
#4204 | Rancho Cucamonga Dist #1 | Rancho Cucamonga, CA | 2.5 GWh |
#4205 | Chicopee | Chicopee, MA | 2.5 GWh |
#4206 | Middlesex Vo Tech Solar 1 LLC | Piscataway, NJ | 2.5 GWh |
#4208 | DG Infineum | Linden, NJ | 2.5 GWh |
#4209 | SR Skylark C | Windsor, CO | 2.5 GWh |
#4210 | Cedar Creek | Egg Harbor City, NJ | 2.5 GWh |
#4211 | Richmond Hayes Solar | Augusta, GA | 2.5 GWh |
#4212 | Madelyn Solar, LLC | Silver Lake, CA | 2.5 GWh |
#4213 | Herrington Solar | Schaghtiicoke, NY | 2.5 GWh |
#4214 | Cheney Solar | Cheney, KS | 2.5 GWh |
#4215 | MNCPPC Randall Farm | Upper Marlboro, MD | 2.4 GWh |
#4216 | Joe Jenny | Oxford, MA | 2.4 GWh |
#4217 | Andresen Solar | Clara City, MN | 2.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Storrie Lake Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Abiquiu Dam | Abiquiu, NM | 47.8 GWh | 80.2 mi |
Alcalde Solar Array | Alcalde, NM | 6.0 GWh | 56.6 mi |
Angel Fire Energy Facility | Angel Fire, NM | 7.9 GWh | 52.8 mi |
Aragonne Wind LLC | Santa Rosa, NM | 741.5 GWh | 59 mi |
Britton Solar Energy Center | Moriarty, NM | 141.1 GWh | 67.9 mi |
Cimarron Solar Facility | Springer, NM | 57.0 GWh | 63.9 mi |
CNMEC Solar Energy Center | Estancia, NM | 5.5 GWh | 77.7 mi |
El Cabo Wind | Encino, NM | 1.0 TWh | 71.2 mi |
La Joya NM | Encino, NM | 947.1 GWh | 66.4 mi |
Las Vegas Solar Energy Center | Las Vegas, NM | 9.9 GWh | 1.6 mi |
Los Alamos PV Site | Los Alamos, NM | 526.0 MWh | 64.9 mi |
Questa Solar Facility | Questa, NM | 719.0 MWh | 77 mi |
San Miguel I Solar Energy Center | Las Vegas, NM | 26.7 GWh | 1.6 mi |
San Miguel II Solar Energy Center | Las Vegas, NM | 26.3 GWh | 1.6 mi |
Santa Fe Solar Energy Center | Santa Fe, NM | 23.9 GWh | 49.5 mi |
Springer Solar 1 | Springer, NM | 2.2 GWh | 60.9 mi |
Syncarpha Eagle Nest | Eagle Nest, NM | 2.3 GWh | 61.5 mi |
Syncarpha El Rito | El Rito, NM | 3.8 GWh | 73.1 mi |
Syncarpha Taos | Taos, NM | 8.2 GWh | 56.1 mi |
Taos Mesa Energy Facility Hybrid | El Prado, NM | 37.4 GWh | 59.3 mi |