Stony Brook
Moody Street, Ludlow, MA 1056Plant Summary Information
Stony Brook is ranked #40 out of 1,262 distillate fuel oil power plants nationwide in terms of total annual net electricity generation.
Stony Brook is comprised of 10 generators and generated 16.3 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Stony Brook |
---|---|
Utility Name | Massachusetts Mun Wholes Electric Co |
Location | Hampden County, MA |
Initial Operation Date | November 1981 |
Last Update | Sep 2024 |
Annual Generation | 25.0 GWh |
Annual Consumption | 281.7 k MMBtu |
Ranked #4,790 out of 11,852 Power Plants Nationwide | |
Ranked #40 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #48 out of 598 Massachusetts Power Plants | |
Ranked #1 out of 33 Massachusetts Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil : 98.3% Natural Gas : 1.7% |
Map of Stony Brook
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Stony Brook.
Monthly Net Generation for Stony Brook
Stony Brook Details
Summary Information | |
---|---|
Plant Name | Stony Brook (6081) |
Plant Address | Moody Street, Ludlow, MA 1056 |
Utility | Massachusetts Mun Wholes Electric Co (11806) |
Latitude, Longitude | 42.1978, -72.5106 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | November 1981 |
Annual Generation | 25.0 GWh |
Fuel Types | Distillate Fuel Oil : 98.3% Natural Gas : 1.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Western Massachusetts Electric Company (20455) MA |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | COLUMBIA GAS OF MASSACHUSETTS |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CA1 Details Operating November 1981
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Duct Burners | No |
Nameplate Capacity | 105 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 96 MW |
Winter Capacity | 105 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 1981 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator CT1 Details Operating November 1981
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | UN.STONYBRK13.2ST1A |
RTO ISO Location Designation For Reporting Wholesale Sales Data | .Z.WCMASS |
Nameplate Capacity | 85 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 69.7 MW |
Winter Capacity | 87 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 1981 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | DFO / NG |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 69.7 MW |
Net Winter Capacity With Natural Gas | 69.7 MW |
Net Summer Capacity With Oil | 69.7 MW |
Net Winter Capacity With Oil | 69.7 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator CT2 Details Operating November 1981
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | UN.STONYBRK13.2ST1B |
RTO ISO Location Designation For Reporting Wholesale Sales Data | .Z.WCMASS |
Nameplate Capacity | 85 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 69.7 MW |
Winter Capacity | 87 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 1981 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | DFO / NG |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 69.7 MW |
Net Winter Capacity With Natural Gas | 69.7 MW |
Net Summer Capacity With Oil | 69.7 MW |
Net Winter Capacity With Oil | 69.7 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator CT3 Details Operating November 1981
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | UN.STONYBRK13.2ST1C |
RTO ISO Location Designation For Reporting Wholesale Sales Data | .Z.WCMASS |
Nameplate Capacity | 85 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 69.7 MW |
Winter Capacity | 87 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 1981 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | DFO / NG |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 69.7 MW |
Net Winter Capacity With Natural Gas | 69.7 MW |
Net Summer Capacity With Oil | 69.7 MW |
Net Winter Capacity With Oil | 69.7 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator EDSI Details Operating November 1981
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Jointly Owned |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1981 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 1 Details Operating November 1982
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | UN.STONTBRK13.2ST2A |
RTO ISO Location Designation For Reporting Wholesale Sales Data | .Z.WCMASS |
Nameplate Capacity | 85 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 65 MW |
Winter Capacity | 85 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1982 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating November 1982
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | UN.STONYBRK13.2ST2B |
RTO ISO Location Designation For Reporting Wholesale Sales Data | .Z.WCMASS |
Nameplate Capacity | 85 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 65 MW |
Winter Capacity | 85 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1982 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator BS#1 Details Standby September 2007
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Jointly Owned |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
---|---|
First Operation Date | September 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator BS#2 Details Standby September 2007
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Jointly Owned |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | September 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 5051S Details Operating June 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 4007 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Z.WCMASS |
Nameplate Capacity | 6.9 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 6.9 MW |
Winter Capacity | 6.9 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Bifacial | Yes |
Azimuth Angle | 166 |
Tilt Angle | 20 |
DC Net Capacity | 10.4 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Stony Brook Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Green Mountain Power Corp | 163 Acorn Lane, Colchester, VT 5446 | Generator 1 | 8.80% |
The Town of Lyndon Electric Department | P O Box 167, Lyndonville, VT 5851 | Generator 1 | 0.44% |
Massachusetts Mun Wholes Electric Co | P O Box 426 - 327 Moody Street, Ludlow, MA 1056 | Generator 1 | 90.76% |
Green Mountain Power Corp | 163 Acorn Lane, Colchester, VT 5446 | Generator 2 | 8.80% |
The Town of Lyndon Electric Department | P O Box 167, Lyndonville, VT 5851 | Generator 2 | 0.44% |
Massachusetts Mun Wholes Electric Co | P O Box 426 - 327 Moody Street, Ludlow, MA 1056 | Generator 2 | 90.76% |
Green Mountain Power Corp | 163 Acorn Lane, Colchester, VT 5446 | Generator BS#1 | 8.80% |
The Town of Lyndon Electric Department | P O Box 167, Lyndonville, VT 5851 | Generator BS#1 | 0.44% |
Massachusetts Mun Wholes Electric Co | P O Box 426 - 327 Moody Street, Ludlow, MA 1056 | Generator BS#1 | 90.76% |
Green Mountain Power Corp | 163 Acorn Lane, Colchester, VT 5446 | Generator BS#2 | 8.80% |
The Town of Lyndon Electric Department | P O Box 167, Lyndonville, VT 5851 | Generator BS#2 | 0.44% |
Massachusetts Mun Wholes Electric Co | P O Box 426 - 327 Moody Street, Ludlow, MA 1056 | Generator BS#2 | 90.76% |
Green Mountain Power Corp | 163 Acorn Lane, Colchester, VT 5446 | Generator CA1 | 8.80% |
The Town of Lyndon Electric Department | P O Box 167, Lyndonville, VT 5851 | Generator CA1 | 0.44% |
Massachusetts Mun Wholes Electric Co | P O Box 426 - 327 Moody Street, Ludlow, MA 1056 | Generator CA1 | 90.76% |
Green Mountain Power Corp | 163 Acorn Lane, Colchester, VT 5446 | Generator CT1 | 8.80% |
The Town of Lyndon Electric Department | P O Box 167, Lyndonville, VT 5851 | Generator CT1 | 0.44% |
Massachusetts Mun Wholes Electric Co | P O Box 426 - 327 Moody Street, Ludlow, MA 1056 | Generator CT1 | 90.76% |
Green Mountain Power Corp | 163 Acorn Lane, Colchester, VT 5446 | Generator CT2 | 8.80% |
The Town of Lyndon Electric Department | P O Box 167, Lyndonville, VT 5851 | Generator CT2 | 0.44% |
Massachusetts Mun Wholes Electric Co | P O Box 426 - 327 Moody Street, Ludlow, MA 1056 | Generator CT2 | 90.76% |
Green Mountain Power Corp | 163 Acorn Lane, Colchester, VT 5446 | Generator CT3 | 8.80% |
The Town of Lyndon Electric Department | P O Box 167, Lyndonville, VT 5851 | Generator CT3 | 0.44% |
Massachusetts Mun Wholes Electric Co | P O Box 426 - 327 Moody Street, Ludlow, MA 1056 | Generator CT3 | 90.76% |
Green Mountain Power Corp | 163 Acorn Lane, Colchester, VT 5446 | Generator EDSI | 8.80% |
The Town of Lyndon Electric Department | P O Box 167, Lyndonville, VT 5851 | Generator EDSI | 0.44% |
Massachusetts Mun Wholes Electric Co | P O Box 426 - 327 Moody Street, Ludlow, MA 1056 | Generator EDSI | 90.76% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#30 | Gibson | Owensville, IN | 9.9 TWh |
#31 | Belle River | China Twp, MI | 6.1 TWh |
#32 | Rockport | Rockport, IN | 4.6 TWh |
#33 | Pebbly Beach Generating Station Hybrid | Avalon, CA | 29.2 GWh |
#34 | Roxboro | Semora, NC | 5.9 TWh |
#35 | Gordonsville Energy LP | Gordonsville, VA | 1.1 TWh |
#36 | Inver Hills | Inver Grove Heights, MN | 78.2 GWh |
#37 | Northeast (MO) | Kansas City, MO | 25.5 GWh |
#38 | Milton R Young | Center, ND | 4.4 TWh |
#39 | Crystal River | Crystal River, FL | 16.3 TWh |
#41 | Brandon Shores | Baltimore, MD | 1.6 TWh |
#42 | Laramie River Station | Wheatland, WY | 7.0 TWh |
#43 | Naknek | Naknek, AK | 23.5 GWh |
#44 | FirstEnergy Fort Martin Power Station | Maidsville, WV | 4.3 TWh |
#45 | Iatan | Weston, MO | 3.6 TWh |
#46 | Mt Storm | Mount Storm, WV | 3.6 TWh |
#47 | Kotzebue Hybrid | Kotzebue, AK | 24.2 GWh |
#48 | Fayette Power Project | La Grange, TX | 7.0 TWh |
#49 | Springerville | Springerville, AZ | 6.3 TWh |
#50 | Martin Lake | Tatum, TX | 10.8 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Stony Brook.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Chicopee Energy | Chicopee, MA | 14.1 GWh | 2.8 mi |
CED Chicopee Solar | Chicopee, MA | 4.9 GWh | 2.1 mi |
Chicopee | Chicopee, MA | 2.5 GWh | 1.2 mi |
Chicopee River Solar | Springfield, MA | 3.0 GWh | 3.9 mi |
Chicopee Solar | Chicopee, MA | 4.5 GWh | 3.8 mi |
Cottage Street Solar Facility | Springfield, MA | 2.7 GWh | 3.9 mi |
East Springfield Solar PV | Springfield, MA | 1.9 GWh | 4.5 mi |
Granby LFG | Granby, MA | 2.9 GWh | 2.8 mi |
Granby Solar, LLC CSG | Granby, MA | 5.6 GWh | 2.1 mi |
Huxley Solar | Ludlow, MA | 4.2 GWh | 1.6 mi |
Indian Orchard | Indian Orchard, MA | 10.6 GWh | 2.6 mi |
Indian Orchard PV Facility | Springfield, MA | 3.4 GWh | 3.3 mi |
Kearsarge Granby | Granby, MA | 3.8 GWh | 1.7 mi |
Kearsarge Ludlow LLC | Ludlow, MA | 5.8 GWh | 0.9 mi |
Ludlow Landfill | Ludlow, MA | 3.3 GWh | 1.1 mi |
Ludlow Site 72 - Conti | Ludlow, MA | 2.3 GWh | 4 mi |
Masspower | Indian Orchard, MA | 609.1 GWh | 2.9 mi |
Oak Street Solar | Springfield, MA | 5.4 GWh | 3.5 mi |
Putts Bridge | Ludlow, MA | 22.2 GWh | 3 mi |
Riverside Holyoke | Holyoke, MA | 40.4 GWh | 4.3 mi |