Stockton Athletic Center
101 Vera King Farris Drive, Pomona, NJ 8240Plant Summary Information
Stockton Athletic Center is ranked #267 out of 314 solar farms in New Jersey in terms of total annual net electricity generation.
Stockton Athletic Center generated 198.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Stockton Athletic Center |
---|---|
Utility Name | MN8 Energy LLC |
Location | Atlantic County, NJ |
Initial Operation Date | February 2009 |
Last Update | Dec 2023 |
Annual Generation | 1.3 GWh |
Annual Consumption | 4.6 k MMBtu |
Ranked #10,649 out of 11,852 Power Plants Nationwide | |
Ranked #5,282 out of 5,655 Solar Power Plants Nationwide | |
Ranked #330 out of 378 New Jersey Power Plants | |
Ranked #267 out of 314 New Jersey Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Marina Energy LLC (2013 to 2018) GSRP (2019 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2023) |
Map of Stockton Athletic Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Stockton Athletic Center.
Monthly Net Generation for Stockton Athletic Center
Stockton Athletic Center Details
Summary Information | |
---|---|
Plant Name | Stockton Athletic Center (57864) |
Plant Address | 101 Vera King Farris Drive, Pomona, NJ 8240 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 39.48844, -74.53526 |
Generation Dates on File | Jan 2011 to Dec 2023 |
Initial Operation Date | February 2009 |
Annual Generation | 1.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 18-2056 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Atlantic City Electric Co (963) NJ |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 2LOT7 Details Operating October 2009
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ABSECON 69 KV LOAD1 |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 225 |
Tilt Angle | 5 |
DC Net Capacity | 0.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.5 MW |
Virtual Net Metering Agreement | No |
Generator SAC Details Operating February 2009
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ABSECON 69 KV LOAD1 |
Nameplate Capacity | 0.3 MW |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 178 |
Tilt Angle | 5 |
DC Net Capacity | 0.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.3 MW |
Virtual Net Metering Agreement | No |
Generator LOT7 Details Operating April 2009
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ABSECON 69 KV LOAD1 |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 225 |
Tilt Angle | 5 |
DC Net Capacity | 0.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.3 MW |
Virtual Net Metering Agreement | No |
Stockton Athletic Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5272 | FastSun 4 CSG | Hugo, MN | 1.3 GWh |
#5273 | Walnut Grove Demonstration Plant | Walnut Grove, MS | 1.3 GWh |
#5274 | UI RCP Bridgeport Seaside | Bridgeport, CT | 19.7 GWh |
#5275 | Becker Solar 3 CSG | St. Michael, MN | 1.3 GWh |
#5276 | Federalsburg Energy Storage 1 LLC | Federaslburg, MD | 2.6 GWh |
#5277 | FRV SI Transport Solar LP | Sacramento, CA | 1.3 GWh |
#5278 | SMUD at Van Conett | Galt, CA | 1.3 GWh |
#5279 | TCLP Solar Phase 1 | Traverse City, MI | 1.3 GWh |
#5280 | Domino Farms Solar | Ann Arbor, MI | 1.3 GWh |
#5281 | Indian Hill Solar LLC | Palmer, MA | 1.3 GWh |
#5283 | Newberry Solar 1 LLC | Newberry Springs, CA | 1.3 GWh |
#5284 | BBB Corporate Headquarters | Union, NJ | 1.3 GWh |
#5285 | MA Solar Storage 1 Hybrid | Sterling, MA | 1.3 GWh |
#5286 | 500 Virginia Solar | Ft. Washington, PA | 1.3 GWh |
#5287 | Fort Bragg - Camp Mackall PV BESS System | Hoffman, NC | 1.3 GWh |
#5288 | NY - Mines Press | Cortlandt, NY | 1.3 GWh |
#5289 | Western 102 Power Plant | McCarran, NV | 482.7 GWh |
#5290 | Edison 7205 Solar | Edison, NJ | 1.3 GWh |
#5291 | 158th Fighter Wing Solar Farm | South Burlington, VT | 1.3 GWh |
#5292 | Meeting House | North East, MD | 1.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Stockton Athletic Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Absegami | Galloway, NJ | 3.5 GWh | 1.2 mi |
AC Criminal Courts Complex SPE2, LLC | Mays Landing, NJ | 1.4 GWh | 9 mi |
ACCC Mays Landing | Pleasantville, NJ | 1.6 GWh | 8 mi |
ACM - Midtown Thermal | Atlantic City, NJ | 47.1 GWh | 10.4 mi |
Adams Ave MS and HS | Egg Harbor Township, NJ | 3.4 GWh | 5.3 mi |
Atlantic City Convention Center | Atlantic City, NJ | 2.8 GWh | 10 mi |
Barrette Outdoor Living, Inc. | Egg Harbor City, NJ | 2.7 GWh | 3.5 mi |
Cedar Branch | Buena Vista Township, NJ | 9.7 GWh | 22.9 mi |
Cedar Creek | Egg Harbor City, NJ | 2.5 GWh | 6.5 mi |
Corning Pharmaceutical Glass | Vineland, NJ | 2.9 GWh | 25.8 mi |
Cumberland (NJ) | Millville, NJ | 65.6 GWh | 24.2 mi |
Delilah Road Landfill | Egg Harbor, NJ | 12.4 GWh | 5 mi |
DTE Atlantic, LLC | Atlantic City, NJ | 55.3 GWh | 9.5 mi |
Hammonton-High School Solar | Atlantic, NJ | 1.6 GWh | 18.7 mi |
Jersey-Atlantic Wind Farm | Atlantic City, NJ | 18.4 GWh | 8.7 mi |
Maple Solar | Vineland, NJ | 3.3 GWh | 23.8 mi |
McKee City Solar Phase 2 | Egg Harbor Township, NJ | 2.3 GWh | 7.2 mi |
The City of Vineland at North Vineland | Vineland, NJ | 5.3 GWh | 24.7 mi |
Vineland Mays Landing Solar | Millville, NJ | 6.7 GWh | 23.9 mi |
Woodbine Landfill Plant | Woodbine, NJ | 809.0 MWh | 22.1 mi |