Stikeleather Farm
4498 N Carolina 90, Hiddenite, NC 28144Plant Summary Information
Stikeleather Farm is ranked #190 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Stikeleather Farm generated 2.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Stikeleather Farm |
---|---|
Utility Name | Stikeleather Farm, LLC |
Location | Alexander County, NC |
Initial Operation Date | August 2015 |
Last Update | Dec 2023 |
Annual Generation | 9.5 GWh |
Annual Consumption | 34.1 k MMBtu |
Ranked #6,020 out of 11,835 Power Plants Nationwide | |
Ranked #1,604 out of 5,643 Solar Power Plants Nationwide | |
Ranked #264 out of 862 North Carolina Power Plants | |
Ranked #190 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Stikeleather Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Stikeleather Farm.
Monthly Net Generation for Stikeleather Farm
Stikeleather Farm Details
Summary Information | |
---|---|
Plant Name | Stikeleather Farm (59595) |
Plant Address | 4498 N Carolina 90, Hiddenite, NC 28144 |
Utility | Stikeleather Farm, LLC (59340) |
Latitude, Longitude | 35.90222, -81.10611 |
Generation Dates on File | Aug 2015 to Dec 2023 |
Initial Operation Date | August 2015 |
Annual Generation | 9.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF15-97-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 12.40 kV |
Energy Storage | No |
Generator PV1 Details Operating August 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Other Planned Modifications | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 6.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Stikeleather Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1594 | Cotten Farm, LLC | Sanford, NC | 9.6 GWh |
#1595 | Millikan Farm | Randleman, NC | 9.6 GWh |
#1596 | Wilson Solar Farm 4 | Wilson, NC | 9.6 GWh |
#1597 | Frenchtown III Solar | Frenchtown, NJ | 9.6 GWh |
#1598 | Almond | Lemoore, CA | 9.6 GWh |
#1599 | Bondi Solar | Kinston, NC | 9.6 GWh |
#1600 | RE Rio Grande Solar LLC | Mojave, CA | 9.5 GWh |
#1601 | Oakwood Solar | Mebane, NC | 9.5 GWh |
#1602 | Hamlin Solar 1, LLC | Hamlin, NY | 9.5 GWh |
#1603 | Meadowlark Solar | Dunn, NC | 9.5 GWh |
#1605 | Ventura Solar, LLC | Taylorsville, NC | 9.5 GWh |
#1606 | Siler City Solar 2 | Siler City, NC | 9.5 GWh |
#1607 | Railroad Farm 2 | St. Pauls, NC | 9.5 GWh |
#1608 | Barnwell Solar | Barnwell, SC | 9.5 GWh |
#1609 | TPE Hopkins Solar Holdings1, LLC | West Greenwhich, RI | 9.5 GWh |
#1610 | OYA Wayside Drive | Watertown, NY | 9.5 GWh |
#1611 | OCI Alamo 2, LLC | Converse, TX | 9.5 GWh |
#1612 | Jakana Solar | Williamston, NC | 9.5 GWh |
#1613 | Floyd Solar, LLC | Fairmont, NC | 9.5 GWh |
#1614 | Blodgett Solar CSG | Tyngsboro, MA | 9.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Stikeleather Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
1045 Tomlin Mill Solar | Statesville, NC | 8.1 GWh | 15.2 mi |
Angel Solar | Newton, NC | 8.7 GWh | 18.3 mi |
Apple Data Center - PV2 | Conover, NC | 37.8 GWh | 12.6 mi |
Apple Data Center PV3 | Conover, NC | 30.3 GWh | 13.2 mi |
Apple One | Newton, NC | 9.7 GWh | 19.1 mi |
Arndt Farm | Claremont, NC | 9.0 GWh | 9.3 mi |
Brighter Future Solar | Granite Falls, NC | 21.2 GWh | 16 mi |
Cline Solar Farm, LLC | Hildebran, NC | 8.1 GWh | 21.5 mi |
Dragstrip Farm | Hickory, NC | 9.0 GWh | 20 mi |
Flash Solar | Conover, NC | 8.7 GWh | 12.1 mi |
Iredell County LFG Facility | Statesville, NC | 25.2 GWh | 18.2 mi |
Lookout Shoals | Statesville, NC | 90.3 GWh | 10 mi |
Maiden Creek Solar Power Plant | Maiden, NC | 132.8 GWh | 21.6 mi |
Old Catawba PV 1 | Claremont, NC | 5.8 GWh | 13.3 mi |
Oxford Dam | Conover, NC | 87.3 GWh | 7.4 mi |
Rhodhiss | Rhodhiss, NC | 58.6 GWh | 20.6 mi |
Sigmon Catawba Farm | Newton, NC | 8.7 GWh | 21.5 mi |
Sonne Two | Newton, NC | 9.0 GWh | 17.5 mi |
Taylorsville Solar LLC | Taylorsville, NC | 1.3 GWh | 2.6 mi |
Ventura Solar, LLC | Taylorsville, NC | 9.5 GWh | 4.3 mi |