Stevens Point is ranked #25 out of 66 hydroelectric power plants in Wisconsin in terms of total annual net electricity generation.

Stevens Point is comprised of 6 generators and generated 8.1 GWh during the 3-month period between September 2022 to December 2022.

Plant NameStevens Point
Utility NameConsolidated Water Power Co
LocationPortage County, WI
Initial Operation DateJanuary 1918
Last Update Dec 2022
Annual Generation 27.6 GWh
Annual Consumption 108.0 k MMBtu
Ranked #4,553 out of 11,249 Power Plants Nationwide
Ranked #648 out of 1,354 Water Power Plants Nationwide
Ranked #89 out of 198 Wisconsin Power Plants
Ranked #25 out of 66 Wisconsin Water Power Plants
Fuel Types Water

Map of Stevens Point

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Stevens Point.

Create Your Account Today

Monthly Net Generation for Stevens Point

Stevens Point Details

Summary Information
Plant NameStevens Point (3973)
Plant Address707 Arlington Place Stevens Point, WI 54481
UtilityConsolidated Water Power Co (4247)
Latitude, Longitude44.5153, -89.585
Generation Dates on FileJan 2001 to Dec 2022
Initial Operation DateJanuary 1918
Annual Generation 27.6 GWh
Fuel Types Water
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceWisconsin River
Ash Impoundment
Transmission / Distribution OwnerConsolidated Water Power Co (4247) WI
Grid Voltage 46.00 kV
Energy StorageNo

Generator 1 Details Operating January 1918

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1918
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo

Generator 2 Details Operating January 1918

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1918
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo

Generator 3 Details Operating January 1918

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1918
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo

Generator 4 Details Operating January 1918

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1918
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo

Generator 5 Details Operating January 1918

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1918
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo

Generator 6 Details Out of Service January 1918

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOut of Service
First Operation DateJanuary 1918
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo

Stevens Point Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Water.

RankPlant NamePlant LocationAnnual Generation
#638Lower Saranac Hydroelectric FacilityPlattsburgh, NY28.1 GWh
#639East NorfolkNorfolk, NY28.0 GWh
#640Fife BrookFlorida, MA28.0 GWh
#641OneidaRiverdale, ID27.9 GWh
#642Chace Mill Winooski OneWinooski, VT27.8 GWh
#643PetersonMilton, VT27.8 GWh
#644Spaulding 1Emigrant Gap, CA27.7 GWh
#645Deerfield 3Buckland, MA27.6 GWh
#646Middle GorgeBishop, CA27.6 GWh
#647Orono BOrono, ME27.6 GWh
#649WynoocheeMontesano, WA27.5 GWh
#650Berrien SpringsBerrien Springs, MI27.5 GWh
#651RogersBig Rapids, MI27.4 GWh
#652Allens FallsParishville, NY27.3 GWh
#653BypassHazelton, ID27.3 GWh
#654MinettoMinetto, NY27.3 GWh
#655Bishop Creek 4Bishop, CA27.2 GWh
#656ReusensLynchburg, VA27.2 GWh
#657Annex CreekJuneau, AK27.2 GWh
#658Cutler HydroCollinston, UT27.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Stevens Point.

Plant NamePlant LocationAnnual GenerationDistance
AlexanderMerrill, WI22.1 GWh47.2 mi
BironBiron, WI32.4 GWh11.3 mi
Biron MillWisconsin Rapids, WI216.8 GWh11.3 mi
Castle RockAdams, WI85.8 GWh48.4 mi
Domtar Paper Company RothschildRothschild, WI4.1 GWh25.7 mi
Du BayEau Pleine, WI42.5 GWh10.8 mi
Georgia-Pacific Corp - Nekoosa MillNekoosa, WI184.4 GWh20.7 mi
MerrillMerrill, WI9.0 GWh46.1 mi
Mosinee MillMosinee, WI128.3 GWh19.6 mi
PetenwellNecedah, WI111.5 GWh38.3 mi
Port Edwards MillPort Edwards, WI36.1 GWh18.6 mi
Rothschild Biomass Cogen FacilityRothschild, WI186.9 GWh25.8 mi
Stevens Point MillStevens Point, WI17.6 GWh11.2 mi
WausauWausau, WI31.7 GWh30.7 mi
Wautoma SolarWautoma, WI28.5 GWh34.3 mi
WestonRothschild, WI3.6 TWh24.1 mi
Whistling Winds DPC SolarNew Lisbon, WI2.9 GWh44.6 mi
WhitingWhiting, WI26.9 GWh1.9 mi
Wisconsin RapidsWisconsin Rapids, WI46.1 GWh14.5 mi
Wood CountyNekoosa, WI276.1 GWh20.7 mi