State Line Combined Cycle
2299 S State Line Ave, Joplin, MO 64804Plant Summary Information
State Line Combined Cycle is ranked #8 out of 120 power plants in Missouri in terms of total annual net electricity generation.
State Line Combined Cycle is comprised of 4 generators and generated 915.6 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | State Line Combined Cycle |
---|---|
Utility Name | Empire District Electric Co |
Location | Jasper County, MO |
Initial Operation Date | May 1995 |
Last Update | Aug 2024 |
Annual Generation | 2.7 TWh |
Annual Consumption | 22.2 M MMBtu |
Ranked #430 out of 11,835 Power Plants Nationwide | |
Ranked #260 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #8 out of 120 Missouri Power Plants | |
Ranked #1 out of 37 Missouri Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.8% |
Map of State Line Combined Cycle
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for State Line Combined Cycle.
Monthly Net Generation for State Line Combined Cycle
State Line Combined Cycle Details
Summary Information | |
---|---|
Plant Name | State Line Combined Cycle (7296) |
Plant Address | 2299 S State Line Ave, Joplin, MO 64804 |
Utility | Empire District Electric Co (5860) |
Latitude, Longitude | 37.0659, -94.614 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | May 1995 |
Annual Generation | 2.7 TWh |
Fuel Types | Natural Gas : 99.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality, Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Empire District Electric Co (5860) MO |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | SOUTHERN STAR CENTRAL GAS PIPELINE |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 1 Details Operating May 1995
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EDESTL4391UN1_ |
RTO ISO Location Designation For Reporting Wholesale Sales Data | EDESTL4391UN1_ |
Nameplate Capacity | 123 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 90 MW |
Winter Capacity | 104 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1995 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Jet Fuel |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 90 MW |
Net Winter Capacity With Natural Gas | 113 MW |
Net Summer Capacity With Oil | 90 MW |
Net Winter Capacity With Oil | 104 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 2-2 Details Operating June 1997
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | EDESTL4391UNCT2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | EDESTL4391UNCT2 |
Nameplate Capacity | 180 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 172 MW |
Winter Capacity | 200 MW |
Minimum Load | 75 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1997 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2-1 Details Operating June 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | EDESTL4391UNCT1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | EDESTL4391UNCT1 |
Nameplate Capacity | 181 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 170 MW |
Winter Capacity | 200 MW |
Minimum Load | 75 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2-3 Details Operating June 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Duct Burners | No |
Nameplate Capacity | 206.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 189 MW |
Winter Capacity | 186 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
State Line Combined Cycle Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Empire District Electric Co | P O Box 127602 Joplin Street, Joplin, MO 64802 | Generator 2-1 | 60.00% |
Evergy Kansas Central, Inc | 818 South Kansas Avenue, Topeka, KS 66601 | Generator 2-1 | 40.00% |
Empire District Electric Co | P O Box 127602 Joplin Street, Joplin, MO 64802 | Generator 2-2 | 60.00% |
Evergy Kansas Central, Inc | 818 South Kansas Avenue, Topeka, KS 66601 | Generator 2-2 | 40.00% |
Empire District Electric Co | P O Box 127602 Joplin Street, Joplin, MO 64802 | Generator 2-3 | 60.00% |
Evergy Kansas Central, Inc | 818 South Kansas Avenue, Topeka, KS 66601 | Generator 2-3 | 40.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#250 | Columbia Energy Center (SC) | Gaston, SC | 2.8 TWh |
#251 | Harquahala Generating Project | Tonopah, AZ | 2.7 TWh |
#252 | Rocky Mountain Energy Center | Keenesburg, CO | 2.7 TWh |
#253 | Port Westward | Clatskanie, OR | 2.7 TWh |
#254 | Emery Station | Clear Lake, IA | 2.7 TWh |
#255 | Holland Energy Facility | Beecher City, IL | 2.7 TWh |
#256 | James E. Rogers Energy Complex | Cliffside, NC | 6.4 TWh |
#257 | Kleen Energy Systems Project | Middletown, CT | 2.7 TWh |
#258 | Gulf Clean Energy Center | Pensacola, FL | 2.7 TWh |
#259 | Northeastern | Oologah, OK | 4.0 TWh |
#261 | Red Oak Power LLC | Sayreville, NJ | 2.7 TWh |
#262 | Eastman Cogeneration Facility | Longview, TX | 2.7 TWh |
#263 | Gila River Power Block 3 | Gila Bend, AZ | 2.6 TWh |
#264 | Mankato Energy Center | Mankato, MN | 2.6 TWh |
#265 | Riverside (MN) | Minneapolis, MN | 2.6 TWh |
#266 | ANP Bellingham Energy Project | Bellingham, MA | 2.6 TWh |
#267 | Sunrise Power LLC | Fellows, CA | 2.6 TWh |
#268 | Colorado Bend Energy Center | Wharton, TX | 2.6 TWh |
#269 | Mountainview Generating Station | Redlands, CA | 2.6 TWh |
#270 | AES Huntington Beach Energy Project | Huntington Beach, CA | 2.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding State Line Combined Cycle.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beaver Dam | Eureka Springs, AR | 117.7 GWh | 61.5 mi |
Carthage | Carthage, MO | 1.7 GWh | 18.9 mi |
Chanute 3 | Chanute, KS | 694.0 MWh | 61.4 mi |
CML&P Generating Facility No. 2 | Coffeyville, KS | 93.2 GWh | 53.6 mi |
Coffeyville | Coffeyville, KS | 10.9 GWh | 55.1 mi |
Empire Energy Center | Sarcoxie, MO | 239.0 GWh | 28.5 mi |
Erie | Erie, KS | 7.0 MWh | 48.7 mi |
Erie Energy Center | Erie, KS | 1.9 GWh | 49.1 mi |
Flint Creek | Gentry, AR | 2.0 TWh | 56.2 mi |
Girard | Girard, KS | 185.0 MWh | 32.9 mi |
Jayhawk Wind Energy Center | Hepler, KS | 687.0 GWh | 49.7 mi |
Kings Point Wind Energy Center | Golden City, MO | 587.8 GWh | 34 mi |
Neosho Ridge Wind Energy Center | Galesburg, KS | 1.2 TWh | 51 mi |
Nevada | Nevada, MO | 1.1 GWh | 56.2 mi |
North Fork Ridge Wind Energy Center | Mindenmines, MO | 547.2 GWh | 23.1 mi |
Oak Grove Power Producers | Arcadia, KS | 20.2 GWh | 39 mi |
Pensacola | Langley, OK | 228.0 GWh | 47.6 mi |
Prosperity Solar Farm CSG | Joplin, MO | 4.0 GWh | 10.8 mi |
Riverton | Riverton, KS | 1.1 TWh | 4.7 mi |
Stockton Hydro | Stockton, MO | 35.0 GWh | 63.5 mi |