State Farm Insur Support Center Central
8225 Brent Branch Drive, Irving, TX 75063Plant Summary Information
State Farm Insur Support Center Central is ranked #43 out of 47 distillate fuel oil power plants in Texas in terms of total annual net electricity generation.
State Farm Insur Support Center Central is comprised of 6 generators and generated 3.0 MWh during the 3-month period between May 2024 to August 2024.
Plant Name | State Farm Insur Support Center Central |
---|---|
Utility Name | State Farm Mutual Auto Ins Co |
Location | Dallas County, TX |
Initial Operation Date | January 1998 |
Last Update | Aug 2024 |
Annual Generation | 7.0 MWh |
Annual Consumption | 93 MMBtu |
Ranked #11,765 out of 11,835 Power Plants Nationwide | |
Ranked #1,145 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #743 out of 749 Texas Power Plants | |
Ranked #43 out of 47 Texas Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of State Farm Insur Support Center Central
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for State Farm Insur Support Center Central.
Monthly Net Generation for State Farm Insur Support Center Central
State Farm Insur Support Center Central Details
Summary Information | |
---|---|
Plant Name | State Farm Insur Support Center Central (55390) |
Plant Address | 8225 Brent Branch Drive, Irving, TX 75063 |
Utility | State Farm Mutual Auto Ins Co (18050) |
Latitude, Longitude | 32.9192, -96.9894 |
Generation Dates on File | Jun 2001 to Aug 2024 |
Initial Operation Date | January 1998 |
Annual Generation | 7.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Monetary Authorities-Central Bank (521) |
Sector | Commercial Non-CHP (4) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 25.00 kV |
Energy Storage | No |
Generator 2A Details Standby January 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | January 1998 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2B Details Standby January 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | January 1998 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3A Details Standby January 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | January 1998 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3B Details Standby January 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | January 1998 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4A Details Standby January 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | January 1998 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4B Details Standby January 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | January 1998 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
State Farm Insur Support Center Central Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1135 | St Louis | St. Louis, MI | 175.0 MWh |
#1136 | Memphis | Memphis, MO | 8.0 MWh |
#1137 | Shelbina Power #3 | Shelbina, MO | 8.0 MWh |
#1138 | JLL-One Rockwood Road | Sleppy Hollow, NY | 8.0 MWh |
#1139 | Van Sant Station | Dover, DE | 643.5 MWh |
#1140 | Erie | Erie, KS | 7.0 MWh |
#1141 | Adrian | Adrian, MN | 7.0 MWh |
#1142 | Shelbina Power #1 | Shelbina, MO | 7.0 MWh |
#1143 | Marceline | Marceline, MO | 7.0 MWh |
#1144 | Argyle | Argyle, WI | 10.0 MWh |
#1146 | WAL5211 | McKinney, TX | 7.0 MWh |
#1147 | Eastern Maine Medical Center | Bangor, ME | 31.2 GWh |
#1148 | High Street Station | Ipswich, MA | 28.0 MWh |
#1149 | David City | David City, NE | 8.0 MWh |
#1150 | Traer Main | Traer, IA | 7.0 MWh |
#1151 | Station H | Independence, MO | 4.7 GWh |
#1152 | Vestaburg | Vestaburg, MI | 1.4 GWh |
#1153 | Weleetka | Weleetka, OK | 7.1 GWh |
#1154 | Brooklyn | Brooklyn, IA | 6.0 MWh |
#1155 | Harlan | Harlan, IA | 6.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding State Farm Insur Support Center Central.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Farmers Branch Renewable Energy Facility | Lewisville, TX | 24.1 GWh | 8 mi |
Handley | Fort Worth, TX | 969.0 GWh | 18.8 mi |
HEB00789 | Frisco, TX | 177.0 MWh | 18.3 mi |
IKEA Grand Prairie Rooftop PV System | Grand Prairie, TX | 1.5 GWh | 7.7 mi |
Mountain Creek | Dallas, TX | 654.1 GWh | 13.9 mi |
OTHERBenEKDallas | Dallas, TX | 107.0 MWh | 10.5 mi |
Toyota HQ Plan | Plano, TX | 8.5 GWh | 14.3 mi |
Verizon Hidden Ridge Solar Project | Irving, TX | 3.0 MWh | 3.6 mi |
Village Creek Water Reclamation Facility | Arlington, TX | 34.2 GWh | 13.3 mi |
WAL1455 | Fort Worth, TX | 69.0 MWh | 14.9 mi |
WAL202 | Frisco, TX | 76.0 MWh | 16.6 mi |
WAL266 | Grapevine, TX | 358.0 MWh | 5.4 mi |
WAL2667 | Dallas, TX | 62.0 MWh | 19.4 mi |
WAL2883 | Plano, TX | 179.0 MWh | 16.5 mi |
WAL2980 | Fort Worth, TX | 315.0 MWh | 17.3 mi |
WAL3406 | Dallas, TX | 291.0 MWh | 10.4 mi |
WAL3777 | Frisco, TX | 3.0 MWh | 19 mi |
WAL5080 | Hurst, TX | 289.0 MWh | 12.3 mi |
WAL5312 | Fort Worth, TX | 296.0 MWh | 20.2 mi |
WAL896 | Grand Prairie, TX | 352.0 MWh | 17.2 mi |