Star Peak Geothermal Plant
4500 E Frontage Road, Imlay, NV 89418Plant Summary Information
Star Peak Geothermal Plant is ranked #22 out of 26 geothermal power plants in Nevada in terms of total annual net electricity generation.
Star Peak Geothermal Plant is comprised of 5 generators and generated 13.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Star Peak Geothermal Plant |
---|---|
Utility Name | Star Peak Geothermal LLC. |
Location | Pershing County, NV |
Initial Operation Date | August 2022 |
Last Update | Dec 2023 |
Annual Generation | 51.8 GWh |
Annual Consumption | 197.9 k MMBtu |
Ranked #3,828 out of 11,852 Power Plants Nationwide | |
Ranked #57 out of 63 Geothermal Power Plants Nationwide | |
Ranked #76 out of 109 Nevada Power Plants | |
Ranked #22 out of 26 Nevada Geothermal Power Plants | |
Fuel Types | Geothermal |
Map of Star Peak Geothermal Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Star Peak Geothermal Plant.
Monthly Net Generation for Star Peak Geothermal Plant
Star Peak Geothermal Plant Details
Summary Information | |
---|---|
Plant Name | Star Peak Geothermal Plant (65773) |
Plant Address | 4500 E Frontage Road, Imlay, NV 89418 |
Utility | Star Peak Geothermal LLC. (64626) |
Latitude, Longitude | 40.53213, -118.27202 |
Generation Dates on File | Aug 2022 to Dec 2023 |
Initial Operation Date | August 2022 |
Annual Generation | 51.8 GWh |
Fuel Types | Geothermal |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF20-698-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 63.00 kV |
Energy Storage | No |
Generator 3500 Details Operating August 2022
Technology | Geothermal |
---|---|
Prime Mover | Turbines Used in a Binary Cycle |
Ownership | Single Owner |
Nameplate Capacity | 3.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 3.5 MW |
Winter Capacity | 3.5 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Generator 5100A Details Operating August 2022
Technology | Geothermal |
---|---|
Prime Mover | Turbines Used in a Binary Cycle |
Ownership | Single Owner |
Nameplate Capacity | 5.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 5.1 MW |
Winter Capacity | 5.1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Generator 5100B Details Operating August 2022
Technology | Geothermal |
---|---|
Prime Mover | Turbines Used in a Binary Cycle |
Ownership | Single Owner |
Nameplate Capacity | 5.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 5.1 MW |
Winter Capacity | 5.1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Generator 5200 Details Operating August 2022
Technology | Geothermal |
---|---|
Prime Mover | Turbines Used in a Binary Cycle |
Ownership | Single Owner |
Nameplate Capacity | 5.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 5.2 MW |
Winter Capacity | 5.2 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Generator STEAM Details Standby August 2022
Technology | Geothermal |
---|---|
Prime Mover | Turbines Used in a Binary Cycle |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | Yes |
First Operation Date | August 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Star Peak Geothermal Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Geothermal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#43 | Galena 3 Geothermal Power Plant | Reno, NV | 92.1 GWh |
#44 | Desert Peak Power Plant | Fernley, NV | 91.9 GWh |
#45 | Raft River Geothermal Power Plant | Malta, ID | 88.6 GWh |
#46 | Stillwater Facility | Fallon, NV | 123.7 GWh |
#47 | San Emidio | Gerlach, NV | 83.0 GWh |
#48 | Aidlin Geothermal Power Plant | Middletown, CA | 77.3 GWh |
#49 | Salton Sea Power Gen Co Unit 1 | Calipatria, CA | 75.9 GWh |
#50 | ENEL Salt Wells LLC | Fallon, NV | 73.2 GWh |
#51 | Ormesa III | Holtville, CA | 68.5 GWh |
#52 | Jersey Valley Geothermal Power Plant | Imlay, NV | 66.7 GWh |
#53 | Mammoth G2 | Mammoth Lakes, CA | 62.3 GWh |
#54 | Mammoth G1 | Mammoth lakes, CA | 57.7 GWh |
#55 | CE Turbo LLC | Calipatria, CA | 54.8 GWh |
#56 | Thermo No 1 | Milford, UT | 54.8 GWh |
#58 | Steamboat III | Reno, NV | 45.6 GWh |
#59 | Steamboat II | Reno, NV | 42.1 GWh |
#60 | Galena 2 Geothermal Power Plant | Reno, NV | 38.1 GWh |
#61 | Lightning Dock Geothermal HI-01, LLC | Animas, NM | 30.7 GWh |
#62 | North Brawley Geothermal Plant | Brawley, CA | 28.2 GWh |
#63 | Whitegrass No. 1 | Yerington, NV | 17.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Star Peak Geothermal Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Battle Mountain Solar Project | Battle Mountain, NV | 276.4 GWh | 64.8 mi |
Beowawe | Beowawe, NV | 97.4 GWh | 86.9 mi |
Brady | Fallon, NV | 95.0 GWh | 64.1 mi |
Desert Peak Power Plant | Fernley, NV | 91.9 GWh | 64.7 mi |
Dixie Valley | Fallon, NV | 406.2 GWh | 44.8 mi |
Dodge Flat | Reno, NV | 542.9 GWh | 63.9 mi |
EGP Stillwater Solar PV II, LLC | Fallon, NV | 32.4 GWh | 70.1 mi |
ENEL Salt Wells LLC | Fallon, NV | 73.2 GWh | 87 mi |
Jersey Valley Geothermal Power Plant | Imlay, NV | 66.7 GWh | 48.5 mi |
Lahontan | Fallon, NV | 8.4 GWh | 85 mi |
New Lahontan | Fallon, NV | 17.2 GWh | 84.9 mi |
NGP Blue Mountain I LLC | Winnemucca, NV | 193.9 GWh | 32.8 mi |
North Valley | Gerlach, NV | 213.9 GWh | 63.5 mi |
North Valmy | Valmy, NV | 1.2 TWh | 63.4 mi |
Patua Acquisition Project, LLC | Hazen, NV | 137.1 GWh | 77.9 mi |
San Emidio | Gerlach, NV | 83.0 GWh | 60.2 mi |
Soda Lake 3 | Fallon, NV | 110.8 GWh | 74.1 mi |
Stillwater Facility | Fallon, NV | 123.7 GWh | 69.7 mi |
Tesla Reno GigaFactory | Sparks, NV | 11.1 GWh | 92.3 mi |
Tungsten Mountain | Fallon, NV | 349.2 GWh | 67.1 mi |