Stanford Campus Solar

360 Oak Road, Stanford, CA 94305

Plant Summary Information

Stanford Campus Solar is ranked #373 out of 801 solar farms in California in terms of total annual net electricity generation.

Stanford Campus Solar generated 920.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameStanford Campus Solar
Utility NameMN8 Energy LLC
LocationSanta Clara County, CA
Initial Operation DateMarch 2017
Last Update Dec 2023
Annual Generation 6.1 GWh
Annual Consumption 21.9 k MMBtu
Ranked #7,246 out of 11,866 Power Plants Nationwide
Ranked #2,514 out of 5,672 Solar Power Plants Nationwide
Ranked #1,016 out of 1,571 California Power Plants
Ranked #373 out of 801 California Solar Power Plants
Fuel Types Solar
Previous Operators Solar Star California XLII, LLC (2018 to 2019)
Goldman Sachs Renewable Power Group (2020 to 2020)
Goldman Sachs Renewable Power LLC (2021 to 2021)
MN8 Energy LLC (2022 to 2023)

Map of Stanford Campus Solar

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Stanford Campus Solar.

Create Your Account Today

Monthly Net Generation for Stanford Campus Solar

Stanford Campus Solar Details

Summary Information
Plant NameStanford Campus Solar (62020)
Plant Address360 Oak Road, Stanford, CA 94305
UtilityMN8 Energy LLC (61944)
Latitude, Longitude37.43434, -122.16077
Generation Dates on FileJan 2018 to Dec 2023
Initial Operation DateMarch 2017
Annual Generation 6.1 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number17-803
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 0.48 kV
Energy StorageNo

Generator STANF Details Operating March 2017

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity3.4 MW
Summer Capacity3.3 MW
Winter Capacity1.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle215
Tilt Angle5
DC Net Capacity4.5 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Stanford Campus Solar Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#2504Linden Hawk Rise Solar CSGLinden, NJ6.2 GWh
#2505RE Dillard 3 LLCSloughhouse, CA6.2 GWh
#2506RE Dillard 1 LLCSloughhouse, CA6.2 GWh
#2507Stromland SolarCochrane, WI6.2 GWh
#2508ZPD-PT Solar Project 2017-006 LLC HybridWarren, MA6.1 GWh
#2509BD Solar Hancock LLCAugusta, ME6.2 GWh
#2510Leggett Solar, LLCLeggett, NC6.2 GWh
#2511Sunpin BlandfordSouthwick, MA6.2 GWh
#2512Sweet Tea Solar, LLCNew Bern, NC6.2 GWh
#2513Springfield Solar PVSpringfield, MA6.2 GWh
#2515Laho Solar PlantMilford, UT6.1 GWh
#2516Blackhorse Farm Solar, LLC CSGWarren, RI6.1 GWh
#2517Beryl Solar PlantBeryl, UT6.1 GWh
#2518Garnet Solar Generation Station I LLCPalm Springs, CA6.1 GWh
#2519Moncure Farm LLCMoncure, NC6.1 GWh
#2520NLP GrangerValley Center, CA6.1 GWh
#2521Milford Flat Solar PlantMilford, UT6.1 GWh
#2522Fitchburg RenewablesFitchburg, MA6.1 GWh
#2523TWE New Bern Solar Project, LLCNew Bern, NC6.1 GWh
#2524CSUF TrigenerationFullerton, CA34.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Stanford Campus Solar.

Plant NamePlant LocationAnnual GenerationDistance
APP Prune A-DCupertino, CA27.1 GWh11 mi
Apple Campus 2 Fuel CellCupertino, CA25.9 GWh11 mi
Apple Campus 2 PVCupertino, CA15.6 GWh11 mi
AT&T - Redwood CityRedwood City, CA7.0 GWh3.9 mi
City of Palo AltoPalo Alta, CA20.6 MWh2.8 mi
Equinix Caspian Dr. Fuel CellSunnyvale, CA35.9 GWh6.1 mi
Franklin Templeton San MateoSan Mateo, CA3.8 GWh10.4 mi
GianeraSanta Clara, CA9.9 GWh10.8 mi
Gilead Foster City Solar ProjectFoster City, CA1.5 GWh11.3 mi
Google Moffett Park Solar ProjectSunnyvale, CA2.7 GWh8.1 mi
Intel Santa ClaraSanta Clara, CA7.3 GWh11.3 mi
JSR000 N Mathilda Fuel CellSunnyvale, CA8.8 GWh7.7 mi
Juniper Networks SunnyvaleSunnyvale, CA5.6 GWh7.6 mi
Mission College Blvd. Fuel CellSanta Clara, CA38.2 GWh11.4 mi
Silicon Valley Clean WaterRedwood City, CA4.7 GWh8.4 mi
Solar Star Palo Alto I, LLCPalo Alto, CA2.1 GWh1.7 mi
SRI International Cogen ProjectMenlo Park, CA25.9 GWh1.6 mi
Sunnyvale City of WPCPSunnyvale, CA9.7 GWh8 mi
Yahoo! - HQSunnyvale, CA4.1 GWh7.5 mi
Zero Waste Energy Development Co LLCSan Jose, CA2.3 GWh11.4 mi