St Nicholas Cogen Project
Hwy 54 E, Twp Rt. 851, Shenandoah, PA 17976Plant Summary Information
St Nicholas Cogen Project is ranked #3 out of 14 coal plants nationwide in terms of total annual net electricity generation.
St Nicholas Cogen Project is comprised of 1 generator and generated 181.5 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | St Nicholas Cogen Project |
---|---|
Utility Name | Schuylkill Energy Resource Inc |
Location | Schuylkill County, PA |
Initial Operation Date | September 1990 |
Last Update | Sep 2024 |
Annual Generation | 634.9 GWh |
Annual Consumption | 10.0 M MMBtu |
Ranked #1,043 out of 11,852 Power Plants Nationwide | |
Ranked #3 out of 14 Waste/Other Coal Power Plants Nationwide | |
Ranked #41 out of 231 Pennsylvania Power Plants | |
Ranked #3 out of 10 Pennsylvania Waste/Other Coal Power Plants | |
Fuel Types | Waste/Other Coal : 99.7% |
Map of St Nicholas Cogen Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for St Nicholas Cogen Project.
Monthly Net Generation for St Nicholas Cogen Project
St Nicholas Cogen Project Details
Summary Information | |
---|---|
Plant Name | St Nicholas Cogen Project (54634) |
Plant Address | Hwy 54 E, Twp Rt. 851, Shenandoah, PA 17976 |
Utility | Schuylkill Energy Resource Inc (16793) |
Latitude, Longitude | 40.8222, -76.1736 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | September 1990 |
Annual Generation | 634.9 GWh |
Fuel Types | Waste/Other Coal : 99.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 94-7-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP CHP (3) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | PPL Electric Utilities Corp (14715) PA |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator SNCP Details Operating September 1990
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 50601 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 50601 |
Nameplate Capacity | 99.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 86 MW |
Winter Capacity | 86 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1990 |
Combined Heat & Power | Yes |
---|---|
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Waste/Other Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Fluidized Bed Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
St Nicholas Cogen Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Waste/Other Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Seward (PA) | New Florence, PA | 2.6 TWh |
#2 | Colver Green Energy | Colver, PA | 702.3 GWh |
#4 | John B Rich Memorial Power Station | Frackville, PA | 624.1 GWh |
#5 | Grant Town Power Plant | Grant Town, WV | 598.7 GWh |
#6 | Northampton Generating Company LP | Northampton, PA | 499.4 GWh |
#7 | Panther Creek Energy Facility | Nesquehoning, PA | 476.5 GWh |
#8 | Sunnyside Cogen Associates | Sunnyside, UT | 340.7 GWh |
#9 | Colstrip Energy LP | Colstrip, MT | 306.2 GWh |
#10 | Scrubgrass Reclamation CO. LP. | Kennerdell, PA | 287.6 GWh |
#11 | Ebensburg Power | Ebensburg, PA | 285.1 GWh |
#12 | Westwood Generation LLC | Tremont, PA | 156.3 GWh |
#13 | Healy | Healy, AK | 385.0 GWh |
#14 | Foster Wheeler Mt Carmel Cogen | Marion Heights, PA | 103.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding St Nicholas Cogen Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Broad Mountain | Schuylkill, PA | 38.0 GWh | 15.1 mi |
Foster Wheeler Mt Carmel Cogen | Marion Heights, PA | 103.7 GWh | 14.6 mi |
Hazelton | Hazelton, PA | 12.1 GWh | 10.1 mi |
Hunlock Power Station | Hunlok Creek, PA | 603.0 GWh | 26.7 mi |
Hunlock Unit 4 | Hunlock Green, PA | 50.3 GWh | 26.8 mi |
John B Rich Memorial Power Station | Frackville, PA | 624.1 GWh | 2.6 mi |
Locust Ridge | Mahanoy City, PA | 54.5 GWh | 3.2 mi |
Locust Ridge II LLC | Shenandoah, PA | 187.8 GWh | 1.6 mi |
Masser Farms Realty Solar | Sacramento, PA | 754.0 MWh | 25.9 mi |
Moxie Freedom Generation Plant | Salem Township, PA | 7.9 TWh | 20.1 mi |
Ontelaunee Energy Center | Reading, PA | 3.8 TWh | 30.3 mi |
PA Solar Park | Nesquehoning, PA | 12.3 GWh | 17 mi |
PA Solar Park II | Nesquehoning, PA | 12.3 GWh | 17.3 mi |
Panther Creek Energy Facility | Nesquehoning, PA | 476.5 GWh | 15.6 mi |
Pine Grove | Pine Grove, PA | 22.0 MWh | 21.6 mi |
Romark PA Solar | Hazle Township, PA | 1.7 GWh | 10.6 mi |
Schuylkill Haven PA BTM | Schuylkill Haven, PA | 124.0 MWh | 13.2 mi |
TalenEnergy Susquehanna | Berwick, PA | 19.2 TWh | 18.7 mi |
Weatherly(PA) RTO BTM | Weatherly, PA | 42.0 MWh | 20.1 mi |
Westwood Generation LLC | Tremont, PA | 156.3 GWh | 20.2 mi |