SSD Clackamas 7, LLC
29233 OR-213, Molalla, OR 97068Plant Summary Information
SSD Clackamas 7, LLC is ranked #77 out of 114 solar farms in Oregon in terms of total annual net electricity generation.
SSD Clackamas 7, LLC generated 892.8 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | SSD Clackamas 7, LLC |
---|---|
Utility Name | Thor Solar 1 CEI, LLC |
Location | Clackamas County, OR |
Initial Operation Date | December 2020 |
Last Update | Dec 2022 |
Annual Generation | 3.8 GWh |
Annual Consumption | 13.4 k MMBtu |
Ranked #8,141 out of 11,249 Power Plants Nationwide | |
Ranked #3,151 out of 5,158 Solar Power Plants Nationwide | |
Ranked #206 out of 254 Oregon Power Plants | |
Ranked #77 out of 114 Oregon Solar Power Plants | |
Fuel Types | Solar |
Map of SSD Clackamas 7, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SSD Clackamas 7, LLC.
Monthly Net Generation for SSD Clackamas 7, LLC
SSD Clackamas 7, LLC Details
Summary Information | |
---|---|
Plant Name | SSD Clackamas 7, LLC (63963) |
Plant Address | 29233 OR-213 Molalla, OR 97068 |
Utility | Thor Solar 1 CEI, LLC (63623) |
Latitude, Longitude | 45.182, -122.591 |
Generation Dates on File | Dec 2020 to Dec 2022 |
Initial Operation Date | December 2020 |
Annual Generation | 3.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 17-1157-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Portland General Electric Company (PGE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Portland General Electric Co (15248) OR |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 2.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
SSD Clackamas 7, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3141 | Mesa CSG 1 Murdock | Grand Junction, CO | 3.8 GWh |
#3142 | CBC Solar Energy Gen Fac Phase 2 | Garner, NC | 3.8 GWh |
#3143 | Columbia University - Johnson Farms | Chester, NY | 3.8 GWh |
#3144 | Mount Hope West | Mount Hope, NY | 3.8 GWh |
#3145 | Jessamine Solar | Marion, SC | 3.8 GWh |
#3146 | Innovative Solar 23 | Kings Mountain, NC | 3.8 GWh |
#3147 | Walpole Solar 2 | Walpole, MA | 3.8 GWh |
#3148 | Guildlerland CSG | Guilderland, NY | 3.8 GWh |
#3149 | SCS Galena 012589 Peoria, LLC | Peoria, IL | 3.8 GWh |
#3150 | Somerville Solar | Somerville, TN | 3.8 GWh |
#3152 | Kearsarge Montague BD(CSG) | Montague, MA | 3.7 GWh |
#3153 | Depot Hill Solar CSG | Charlton, MA | 3.8 GWh |
#3154 | ESIL-PFCHICAGO 2, LLC | Chicago, IL | 3.8 GWh |
#3155 | Frog Hollow CSG | Ellenville, NY | 3.8 GWh |
#3156 | MDFA Devens-Saratoga | Devens, MA | 3.8 GWh |
#3157 | SR Innovation - NIKE PV | Memphis, TN | 3.8 GWh |
#3158 | Livermore Falls CSG | Livermore Falls, ME | 3.8 GWh |
#3159 | Sheep Solar | Turner, OR | 3.8 GWh |
#3160 | Grabinski | Walden, NY | 3.8 GWh |
#3161 | Cream Street Solar | Hyde Park, NY | 3.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding SSD Clackamas 7, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Baldock Solar Highway | Aurora, OR | 1.8 GWh | 10.7 mi |
BristolSolar | Woodburn, OR | 4.4 GWh | 9.9 mi |
Colton Solar | Molalla, OR | 3.6 GWh | 5.8 mi |
Day Hill Solar, LLC | Estacada, OR | 3.8 GWh | 14.1 mi |
Interstate Solar | Gervais, OR | 3.7 GWh | 15.4 mi |
Kaiser Creek Solar (CSG) | Molalla, OR | 63.0 MWh | 2.8 mi |
Minke Solar | Molalla, OR | 3.0 GWh | 1.7 mi |
Mt Hope Solar | Molalla, OR | 4.3 GWh | 3.9 mi |
Pika Solar | Mt. Angel, OR | 3.4 GWh | 10.8 mi |
River Mill | Estacada, OR | 113.0 GWh | 14.3 mi |
River Valley Solar | Woodburn, OR | 1.5 GWh | 12.1 mi |
SSD Clackamas 4, LLC | Molalla, OR | 4.0 GWh | 6.5 mi |
SSD Marion 5, LLC | Woodburn, OR | 3.6 GWh | 10.9 mi |
SSD Marion 6, LLC | Aurora, OR | 3.8 GWh | 11.6 mi |
Sullivan | West Linn, OR | 134.4 GWh | 12 mi |
SulusSolar17 | Oregon City, OR | 4.2 GWh | 13.8 mi |
SulusSolar25 | Aurora, OR | 3.4 GWh | 12.7 mi |
SulusSolar35 | Molalla, OR | 4.6 GWh | 4 mi |
Thomas Creek Solar | Molalla, OR | 3.9 GWh | 3.8 mi |
Williams Acres Solar | Woodburn, OR | 4.2 GWh | 10.6 mi |