SPS3 Lea
NM Highway 176, Eunice, NM 88231Plant Summary Information
SPS3 Lea is ranked #34 out of 83 solar farms in New Mexico in terms of total annual net electricity generation.
SPS3 Lea generated 4.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | SPS3 Lea |
---|---|
Utility Name | SunE SPS3, LLC |
Location | Lea County, NM |
Initial Operation Date | November 2011 |
Last Update | Dec 2023 |
Annual Generation | 23.0 GWh |
Annual Consumption | 82.1 k MMBtu |
Ranked #4,894 out of 11,852 Power Plants Nationwide | |
Ranked #1,128 out of 5,655 Solar Power Plants Nationwide | |
Ranked #82 out of 137 New Mexico Power Plants | |
Ranked #34 out of 83 New Mexico Solar Power Plants | |
Fuel Types | Solar |
Map of SPS3 Lea
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SPS3 Lea.
Monthly Net Generation for SPS3 Lea
SPS3 Lea Details
Summary Information | |
---|---|
Plant Name | SPS3 Lea (57738) |
Plant Address | NM Highway 176, Eunice, NM 88231 |
Utility | SunE SPS3, LLC (57057) |
Latitude, Longitude | 32.46972, -103.32333 |
Generation Dates on File | Nov 2011 to Dec 2023 |
Initial Operation Date | November 2011 |
Annual Generation | 23.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF12-95-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southwestern Public Service Co (17718) NM |
Grid Voltage | 12.50 kV |
Energy Storage | No |
Generator 1 Details Operating November 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 10 MW |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 11.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
SPS3 Lea Plant Owners
Owner Name | Address | Ownership |
---|---|---|
WF-SunE-SPS Solar Statutory Trust | 299 South Main Street, Salt Lake City, UT 84111 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1118 | UC Davis South Campus | Davis, CA | 23.4 GWh |
#1119 | Longview Solar | Hebron, MD | 23.3 GWh |
#1120 | Whitetail Solar | Dillon, SC | 23.3 GWh |
#1121 | Trask East Solar | Beaufort, SC | 23.3 GWh |
#1122 | OR Solar 6, LLC | Lakeview, OR | 23.3 GWh |
#1123 | Naval Air Weapons Station China Lake | Ridgecrest, CA | 23.3 GWh |
#1124 | Big Bend | Apollo Beach, FL | 7.7 TWh |
#1125 | OR Solar 3, LLC | Malin, OR | 23.3 GWh |
#1126 | Rock Garden Solar, LLC | Fort Rock, OR | 23.2 GWh |
#1127 | West Hines Solar I, LLC | Hines, OR | 23.2 GWh |
#1129 | Mars Solar | Bruni, TX | 23.0 GWh |
#1130 | Wapakoneta-Pratt | Wapakoneta, OH | 23.0 GWh |
#1131 | Santolina Solar Energy Center | Albuquerque, NM | 22.9 GWh |
#1132 | Swamp Fox Solar | Pelion, SC | 22.9 GWh |
#1133 | Prescott Solar Plant | Prescott, AZ | 22.9 GWh |
#1134 | Annapolis Solar Park, LLC | Annapolis, MD | 22.8 GWh |
#1135 | CL-Viaduct LLC | Bloom Township, PA | 22.8 GWh |
#1136 | Truman Solar | Colombia, MO | 22.7 GWh |
#1137 | Whitakers | Whitakers, NC | 22.7 GWh |
#1138 | Fort Rock IV | Fort Rock, OR | 22.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding SPS3 Lea.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bakke | Andrews, TX | 877.0 MWh | 47.3 mi |
Cunningham | Hobbs, NM | 1.7 TWh | 16.9 mi |
Frankel | Andrews, TX | 645.0 MWh | 32.1 mi |
Hobbs Generating Station | Hobbs, NM | 3.2 TWh | 17.9 mi |
Jumbo Hill Wind Project | Andrews, TX | 589.0 GWh | 22.6 mi |
Lapetus | Andrews, TX | 186.1 GWh | 37.9 mi |
LCEC Generation LLVC | Lovington, NM | 44.1 GWh | 35.1 mi |
Maddox | Hobbs, NM | 699.8 GWh | 16.9 mi |
Middle Daisy | Lovington, NM | 7.3 GWh | 35.3 mi |
Mustang Station | Denver City, TX | 2.2 TWh | 48.5 mi |
Mustang Station Unit 4 | Denver City, TX | 853.8 GWh | 48.5 mi |
Notrees Windpower Hybrid | Goldsmith, TX | 232.8 GWh | 43.7 mi |
Oso Grande Wind Farm | Maljamar, NM | 572.4 GWh | 37.7 mi |
Prospero Solar | Andrews, TX | 747.8 GWh | 30.9 mi |
Prospero Solar II | Andrews, TX | 675.0 GWh | 31 mi |
SPS1 Dollarhide | Jal, NM | 22.1 GWh | 26 mi |
SPS2 Jal | Jal, NM | 18.9 GWh | 21.4 mi |
SPS4 Monument | Monument, NM | 22.3 GWh | 14.7 mi |
Tumbleweed | Andrews, TX | 903.0 MWh | 45.4 mi |
Wildcat Wind | Lovington, NM | 56.5 GWh | 33.4 mi |