Springbok Solar Farm 1
29999 Neuralia Rd., Cantil, CA 93519Plant Summary Information
Springbok Solar Farm 1 is ranked #58 out of 799 solar farms in California in terms of total annual net electricity generation.
Springbok Solar Farm 1 generated 51.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Springbok Solar Farm 1 |
---|---|
Utility Name | 62SK 8me, LLC |
Location | Kern County, CA |
Initial Operation Date | July 2016 |
Last Update | Dec 2023 |
Annual Generation | 291.6 GWh |
Annual Consumption | 1.0 M MMBtu |
Ranked #1,863 out of 11,835 Power Plants Nationwide | |
Ranked #165 out of 5,643 Solar Power Plants Nationwide | |
Ranked #176 out of 1,569 California Power Plants | |
Ranked #58 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Springbok Solar Farm 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Springbok Solar Farm 1.
Monthly Net Generation for Springbok Solar Farm 1
Springbok Solar Farm 1 Details
Summary Information | |
---|---|
Plant Name | Springbok Solar Farm 1 (59532) |
Plant Address | 29999 Neuralia Rd., Cantil, CA 93519 |
Utility | 62SK 8me, LLC (59273) |
Latitude, Longitude | 35.24917, -117.95528 |
Generation Dates on File | Jul 2016 to Dec 2023 |
Initial Operation Date | July 2016 |
Annual Generation | 291.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 16-57-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator SB1 Details Operating July 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 105 MW |
Summer Capacity | 105 MW |
Winter Capacity | 105 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 136.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Springbok Solar Farm 1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#155 | Midway Solar - TX | Fort Stockton, TX | 302.3 GWh |
#156 | Samson Solar Energy III LLC | Cunningham, TX | 301.8 GWh |
#157 | BigBeau Solar, LLC | Rosamond, CA | 299.9 GWh |
#158 | Panoche Valley Solar Farm | Paicines, CA | 298.3 GWh |
#159 | Victory Pass | Desert Center, CA | 296.2 GWh |
#160 | Hudson - High Desert Hybrid | Victorville, CA | 288.5 GWh |
#161 | Wistaria Ranch Solar | Calexico, CA | 295.2 GWh |
#162 | Concho Valley Solar, LLC | San Angelo, TX | 293.4 GWh |
#163 | Blythe Solar IV, LLC | Blythe, CA | 284.6 GWh |
#164 | Montague Solar | Arlington, OR | 292.3 GWh |
#166 | Ganado Solar | Gail, TX | 288.0 GWh |
#167 | Umbriel Solar | Livington, TX | 289.8 GWh |
#168 | Harry Allen Solar Energy LLC | Apex, NV | 287.9 GWh |
#169 | Upton County Solar | McCamey, TX | 287.4 GWh |
#170 | Elm Branch Solar 1 | Bardwell, TX | 287.2 GWh |
#171 | Arlington Energy Center III | Blythe, CA | 263.6 GWh |
#172 | Hardin Solar Energy LLC | Alger, OH | 285.7 GWh |
#173 | Tres Bahias | Port Lavaca, TX | 284.6 GWh |
#174 | East Blackland Solar Project 1 | Manor, TX | 283.4 GWh |
#175 | Colonial Trail West | Spring Grove, VA | 282.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Springbok Solar Farm 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beacon Solar Plant Site 2 | Cantil, CA | 113.0 GWh | 2.7 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 93.1 GWh | 4.5 mi |
CalCity Solar 1 | California City, CA | 7.4 GWh | 7.5 mi |
California City | California City, CA | 5.3 GWh | 6.5 mi |
Difwind Farms Ltd VI | Mojave, CA | 15.3 GWh | 18.4 mi |
Edwards Sanborn S1 | Mojave, CA | 93.5 GWh | 18.3 mi |
Edwards Sanborn S3 | Mojave, CA | 79.4 GWh | 18.7 mi |
Edwards Sanborn S4 | Mojave, CA | 71.4 GWh | 18.8 mi |
Hecate Energy Beacon Solar 1 | Cantil, CA | 129.0 GWh | 3.6 mi |
Hecate Energy Beacon Solar 3 | Cantil, CA | 133.3 GWh | 3.4 mi |
Hecate Energy Beacon Solar 4 | Cantil, CA | 113.7 GWh | 4.1 mi |
North Sky River Energy LLC | Weldon, CA | 386.6 GWh | 14.7 mi |
Pine Tree Solar Project | Owenyo, CA | 6.9 GWh | 13.6 mi |
Pine Tree Wind Power Project | Cantil, CA | 61.0 GWh | 12.4 mi |
RE Barren Ridge 1 | Mojave, CA | 169.5 GWh | 7.1 mi |
Rising Tree Wind Farm | Mojave, CA | 213.4 GWh | 19 mi |
Rising Tree Wind Farm II | Mojave, CA | 47.7 GWh | 18 mi |
Sky River Wind Energy Center | Tehachapi, CA | 201.6 GWh | 16.5 mi |
Springbok 3 Solar Farm Hybrid | Cantil, CA | 242.6 GWh | 6 mi |
Springbok Solar Farm 2 | Cantil, CA | 404.2 GWh | 1.2 mi |