Springbok 3 Solar Farm Hybrid
31997 Cholla Rd, Cantil, CA 93519Plant Summary Information
Springbok 3 Solar Farm Hybrid is ranked #63 out of 747 solar farms in California in terms of total annual net electricity generation.
Springbok 3 Solar Farm Hybrid generated 57.8 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Springbok 3 Solar Farm Hybrid |
---|---|
Utility Name | 64KT 8me LLC |
Location | Kern County, CA |
Initial Operation Date | July 2019 |
Last Update | Mar 2024 |
Annual Generation | 255.2 GWh |
Annual Consumption | 870.7 k MMBtu |
Ranked #2,059 out of 11,249 Power Plants Nationwide | |
Ranked #187 out of 5,158 Solar Power Plants Nationwide | |
Ranked #203 out of 1,501 California Power Plants | |
Ranked #63 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Springbok 3 Solar Farm Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Springbok 3 Solar Farm Hybrid.
Monthly Net Generation for Springbok 3 Solar Farm Hybrid
Springbok 3 Solar Farm Hybrid Details
Summary Information | |
---|---|
Plant Name | Springbok 3 Solar Farm Hybrid (60491) |
Plant Address | 31997 Cholla Rd Cantil, CA 93519 |
Utility | 64KT 8me LLC (60278) |
Latitude, Longitude | 35.17115, -118.00165 |
Generation Dates on File | Jul 2019 to Mar 2024 |
Initial Operation Date | July 2019 |
Annual Generation | 255.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator SB3BS Details Operating July 2019
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 1.5 |
---|---|
Maximum Charge Rate | 1.5 MW |
Maximum Discharge Rate | 1.5 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 1.5 |
Storage Enclosure Type | CT |
Frequency Regulation | Yes |
Voltage Or Reactive Power Support | Yes |
Excess Wind And Solar Generation | Yes |
Generator SB3SF Details Operating July 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 90 MW |
Summer Capacity | 90 MW |
Winter Capacity | 90 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2019 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 119.6 MW |
Crystalline Silicon | Yes |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Springbok 3 Solar Farm Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#177 | Fish Springs | Reno, NV | 260.3 GWh |
#178 | OCI Alamo 7 LLC | Haskell, TX | 269.9 GWh |
#179 | CA Flats Solar 130, LLC | Shandon, CA | 268.2 GWh |
#180 | East Line Solar | Coolidge, AZ | 266.5 GWh |
#181 | Alamo 6 | Fort Stockton, TX | 265.6 GWh |
#182 | Willow Spring Solar, LLC | Rosamond, CA | 263.7 GWh |
#183 | SR Snipesville II | Denton, GA | 259.4 GWh |
#184 | BigBeau Solar, LLC | Rosamond, CA | 255.3 GWh |
#185 | Prairie State Solar Project | Swanwick Township, IL | 257.2 GWh |
#186 | Dressor Plains Solar, LLC | Herrick, IL | 257.1 GWh |
#188 | SR Clay, LLC | Fort Gaines, GA | 254.5 GWh |
#189 | San Pablo Raceway | Lancaster, CA | 254.4 GWh |
#190 | Yellow Pine Solar | Enterprise, NV | 242.3 GWh |
#191 | Copper Mountain Solar 4, LLC | Boulder City, NV | 249.7 GWh |
#192 | West of the Pecos Solar | TBD, TX | 248.8 GWh |
#193 | SR Lumpkin | Lumpkin, GA | 248.0 GWh |
#194 | Antelope Expansion 2 | Lancaster, CA | 247.4 GWh |
#195 | Edwards Sanborn E4 | Mojave, CA | 245.1 GWh |
#196 | Oberon Solar Project | Desert Center, CA | 238.7 GWh |
#197 | Robins Air Force Base Solar | Macon, GA | 244.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Springbok 3 Solar Farm Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alta Wind X | Mojave, CA | 392.2 GWh | 13.6 mi |
Beacon Solar Plant Site 2 | Cantil, CA | 124.7 GWh | 6.5 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 100.9 GWh | 5.7 mi |
CalCity Solar 1 | California City, CA | 7.5 GWh | 2.9 mi |
California City | California City, CA | 5.8 GWh | 1.5 mi |
Difwind Farms Ltd VI | Mojave, CA | 23.8 GWh | 12.7 mi |
Edwards Sanborn S1 | Mojave, CA | 102.8 GWh | 12.4 mi |
Edwards Sanborn S3 | Mojave, CA | 83.6 GWh | 12.7 mi |
Edwards Sanborn S4 | Mojave, CA | 70.9 GWh | 12.8 mi |
Hecate Energy Beacon Solar 1 | Cantil, CA | 141.9 GWh | 6.8 mi |
Hecate Energy Beacon Solar 3 | Cantil, CA | 145.4 GWh | 5.7 mi |
Hecate Energy Beacon Solar 4 | Cantil, CA | 124.6 GWh | 5.9 mi |
Pine Tree Solar Project | Owenyo, CA | 13.1 GWh | 11.7 mi |
Pine Tree Wind Power Project | Cantil, CA | 133.7 GWh | 11.2 mi |
RE Barren Ridge 1 | Mojave, CA | 176.3 GWh | 4.4 mi |
RE Columbia 3 LLC | Mojave, CA | 21.7 GWh | 13.7 mi |
Rising Tree Wind Farm | Mojave, CA | 241.1 GWh | 13.8 mi |
Rising Tree Wind Farm II | Mojave, CA | 55.4 GWh | 12.9 mi |
Springbok Solar Farm 1 | Cantil, CA | 319.0 GWh | 6 mi |
Springbok Solar Farm 2 | Cantil, CA | 444.6 GWh | 5.6 mi |