Spring Grove I
4150 Beaverdam Road, Spring Grove, VA 23881Plant Summary Information
Spring Grove I is ranked #46 out of 192 power plants in Virginia in terms of total annual net electricity generation.
Spring Grove I generated 36.2 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Spring Grove I |
---|---|
Utility Name | Dominion Energy Inc. |
Location | Surry County, VA |
Initial Operation Date | November 2020 |
Last Update | Mar 2024 |
Annual Generation | 153.8 GWh |
Annual Consumption | 524.6 k MMBtu |
Ranked #2,647 out of 11,249 Power Plants Nationwide | |
Ranked #357 out of 5,158 Solar Power Plants Nationwide | |
Ranked #46 out of 192 Virginia Power Plants | |
Ranked #12 out of 76 Virginia Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Dominion Renewable Energy (2018 to 2020) Dominion Energy Inc (2021 to 2021) Dominion Energy Inc. (2022 to 2022) |
Map of Spring Grove I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Spring Grove I.
Monthly Net Generation for Spring Grove I
Spring Grove I Details
Summary Information | |
---|---|
Plant Name | Spring Grove I (61986) |
Plant Address | 4150 Beaverdam Road Spring Grove, VA 23881 |
Utility | Dominion Energy Inc. (5248) |
Latitude, Longitude | 37.17392, -76.91925 |
Generation Dates on File | Nov 2020 to Mar 2024 |
Initial Operation Date | November 2020 |
Annual Generation | 153.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator SGIS Details Operating November 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 97.9 MW |
Summer Capacity | 97.9 MW |
Winter Capacity | 97.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 135.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Spring Grove I Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#347 | Cattle Ranch | Arcadia, FL | 155.9 GWh |
#348 | Lumina Solar Project | Snyder, TX | 155.8 GWh |
#349 | Midlands | St. Matthews, SC | 155.5 GWh |
#350 | Everglades Solar Energy Center | Homestead, FL | 155.4 GWh |
#351 | Titan Solar 1 (CA) | Borrego Springs, CA | 155.2 GWh |
#352 | Innovative Solar 42 | Fayetteville, NC | 155.2 GWh |
#353 | Oak Trail Solar, LLC | Moyock, NC | 155.1 GWh |
#354 | Hardeetown Solar Power Plant | Chiefland, FL | 154.9 GWh |
#355 | Innovative Solar 46 | Hope Mills, NC | 154.5 GWh |
#356 | Loggerhead Solar Energy Center | Port St. Lucie, FL | 153.8 GWh |
#358 | Golden Fields Solar I, LLC | Rosamond, CA | 153.6 GWh |
#359 | Beulah Solar | Batesburg, SC | 153.5 GWh |
#360 | Ghost Orchid Solar Energy Center | Clewiston, FL | 153.4 GWh |
#361 | Encino Solar Energy Center | Rio Rancho Estates, NM | 153.3 GWh |
#362 | Britton Solar Energy Center | Moriarty, NM | 152.8 GWh |
#363 | Great Bay Solar 1 | Princess Anne, MD | 152.5 GWh |
#364 | Trailside Solar Center | Elkton, FL | 152.4 GWh |
#365 | Blue Springs | Marianna, FL | 151.9 GWh |
#366 | Rutherford Farm | Forest City, NC | 151.6 GWh |
#367 | Santa Fe Solar Power Plant | Archer, FL | 151.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Spring Grove I.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Caden Energix Rives Road LLC | Petersburg, VA | 33.3 GWh | 23 mi |
Charles City | Providence Forge, VA | 66.1 GWh | 21.6 mi |
Chesterfield | Chester, VA | 2.5 TWh | 29.3 mi |
Colonial Trail West | Spring Grove, VA | 292.2 GWh | 2.6 mi |
Correctional Solar LLC | Barhamsville, VA | 34.1 GWh | 21 mi |
Fort Powhatan Solar | Disputanta, VA | 345.2 GWh | 10.7 mi |
Gravel Neck | Surry, VA | 33.2 GWh | 12.6 mi |
Hopewell Cogeneration | Hopewell, VA | 981.5 GWh | 21.5 mi |
Hopewell Mill | Hopewell, VA | 318.6 GWh | 21.5 mi |
Hopewell Power Station | Hopewell, VA | 387.2 GWh | 21.8 mi |
Philip Morris | Chester, VA | 2.2 GWh | 23.3 mi |
Rochambeau Solar | Williamsburg, VA | 33.3 GWh | 15 mi |
Skipjack Solar Center | Wayside, VA | 389.1 GWh | 22.4 mi |
Surry | Surry, VA | 15.2 TWh | 12.2 mi |
TWE Myrtle Solar Farm, LLC | Suffolk, VA | 28.8 GWh | 29.9 mi |
Waste Management Bethel LFGTE | Hampton, VA | 40.1 GWh | 27 mi |
Waste Management Middle Peninsula LFGTE | Glenns, VA | 52.7 GWh | 28.9 mi |
Waverly Solar, LLC | Waverly, VA | 31.6 GWh | 15.4 mi |
WestRock-West Point Mill | West Point, VA | 536.8 GWh | 26 mi |
Woodland Solar Farm | Smithfield, VA | 29.6 GWh | 26 mi |