Spring Grove I
4150 Beaverdam Road, Spring Grove, VA 23881Plant Summary Information
Spring Grove I is ranked #45 out of 211 power plants in Virginia in terms of total annual net electricity generation.
Spring Grove I generated 54.8 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Spring Grove I |
---|---|
Utility Name | Dominion Energy Inc. |
Location | Surry County, VA |
Initial Operation Date | November 2020 |
Last Update | Aug 2024 |
Annual Generation | 155.4 GWh |
Annual Consumption | 560.9 k MMBtu |
Ranked #2,608 out of 11,835 Power Plants Nationwide | |
Ranked #352 out of 5,643 Solar Power Plants Nationwide | |
Ranked #45 out of 211 Virginia Power Plants | |
Ranked #11 out of 94 Virginia Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Dominion Renewable Energy (2018 to 2020) Dominion Energy Inc (2021 to 2021) Dominion Energy Inc. (2022 to 2023) |
Map of Spring Grove I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Spring Grove I.
Monthly Net Generation for Spring Grove I
Spring Grove I Details
Summary Information | |
---|---|
Plant Name | Spring Grove I (61986) |
Plant Address | 4150 Beaverdam Road, Spring Grove, VA 23881 |
Utility | Dominion Energy Inc. (5248) |
Latitude, Longitude | 37.17392, -76.91925 |
Generation Dates on File | Nov 2020 to Aug 2024 |
Initial Operation Date | November 2020 |
Annual Generation | 155.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator SGIS Details Operating November 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 97.9 MW |
Summer Capacity | 97.9 MW |
Winter Capacity | 97.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 135.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Spring Grove I Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#342 | Alpine Solar | Lancaster, CA | 161.0 GWh |
#343 | Bulldog Solar LLC | Warrenton, GA | 159.2 GWh |
#344 | Hunter Solar, LLC (CO) | Bennett, CO | 159.0 GWh |
#345 | Bluegrass Solar | Church Hill, MD | 158.7 GWh |
#346 | Fort Green Solar Power Plant | Bowling Green, FL | 158.1 GWh |
#347 | Huntley | Bowman, SC | 157.8 GWh |
#348 | Stuttgart Solar | Stuttgart, AR | 157.5 GWh |
#349 | Willow Solar Energy Center | Myakka City, FL | 157.3 GWh |
#350 | Cove Mountain Solar | Beryl, UT | 156.5 GWh |
#351 | Okeechobee Solar | Vero Beach, FL | 156.1 GWh |
#353 | Hardeetown Solar Power Plant | Chiefland, FL | 154.6 GWh |
#354 | Gutenberg Solar | Garysburg, NC | 153.7 GWh |
#355 | Twin Rivers Solar Power Plant | Jasper, FL | 153.7 GWh |
#356 | Sabal Palm Solar Center | Loxahatchee, FL | 153.7 GWh |
#357 | Powells Creek Solar - Hybrid | Alton, VA | 153.1 GWh |
#358 | SR Perry | Perry, GA | 153.1 GWh |
#359 | Pelican Solar Center | Ft. Pierce, FL | 152.8 GWh |
#360 | Charlie Creek Solar Power Plant | Wauchula, FL | 152.8 GWh |
#361 | Badger Hollow II | Cobb, WI | 152.3 GWh |
#362 | Hamilton Solar Power Plant | Jasper, FL | 152.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Spring Grove I.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Caden Energix Rives Road LLC | Petersburg, VA | 28.0 GWh | 23 mi |
Cavalier Solar | Smithfield, VA | 93.7 GWh | 14.8 mi |
Charles City | Providence Forge, VA | 54.0 GWh | 21.6 mi |
Colonial Trail West | Spring Grove, VA | 282.3 GWh | 2.6 mi |
Correctional Solar LLC | Barhamsville, VA | 30.1 GWh | 21 mi |
Fort Powhatan Solar | Disputanta, VA | 320.2 GWh | 10.7 mi |
Gravel Neck | Surry, VA | 89.3 GWh | 12.6 mi |
Hopewell Cogeneration | Hopewell, VA | 1.6 TWh | 21.5 mi |
Hopewell Mill | Hopewell, VA | 284.6 GWh | 21.5 mi |
Hopewell Power Station | Hopewell, VA | 345.0 GWh | 21.8 mi |
Norge Solar Farm | Williamsburg, VA | 1.9 GWh | 15.4 mi |
Park 500 Philip Morris USA | Chester, VA | 13.8 GWh | 22.9 mi |
Philip Morris | Chester, VA | 2.2 GWh | 23.3 mi |
Rochambeau Solar | Williamsburg, VA | 33.6 GWh | 15 mi |
Skipjack Solar Center | Wayside, VA | 353.6 GWh | 22.4 mi |
Solidago Solar | Windsor, VA | 15.9 GWh | 22.8 mi |
Surry | Surry, VA | 13.8 TWh | 12.2 mi |
Waverly Solar, LLC | Waverly, VA | 141.9 GWh | 15.4 mi |
WestRock-West Point Mill | West Point, VA | 525.4 GWh | 26 mi |
Woodland Solar Farm | Smithfield, VA | 30.0 GWh | 26 mi |