Spicer Meadow Project
477 Bret Hart Drive, Murphys, CA 95247Plant Summary Information
Spicer Meadow Project is ranked #115 out of 222 hydroelectric power plants in California in terms of total annual net electricity generation.
Spicer Meadow Project is comprised of 3 generators and generated 7.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Spicer Meadow Project |
---|---|
Utility Name | Northern California Power Agny |
Location | Tuolumne County, CA |
Initial Operation Date | November 1989 |
Last Update | Dec 2023 |
Annual Generation | 29.8 GWh |
Annual Consumption | 104.1 k MMBtu |
Ranked #4,554 out of 11,835 Power Plants Nationwide | |
Ranked #649 out of 1,371 Water Power Plants Nationwide | |
Ranked #615 out of 1,569 California Power Plants | |
Ranked #115 out of 222 California Water Power Plants | |
Fuel Types | Water |
Map of Spicer Meadow Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Spicer Meadow Project.
Monthly Net Generation for Spicer Meadow Project
Spicer Meadow Project Details
Summary Information | |
---|---|
Plant Name | Spicer Meadow Project (54554) |
Plant Address | 477 Bret Hart Drive, Murphys, CA 95247 |
Utility | Northern California Power Agny (40613) |
Latitude, Longitude | 38.3914, -120.0008 |
Generation Dates on File | Jan 2004 to Dec 2023 |
Initial Operation Date | November 1989 |
Annual Generation | 29.8 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Spicer Meadow Reservoir |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating November 1989
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | SPICER_1_UNITS-APND |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SPICER_1_UNITS-APND |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.8 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1989 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator GEN2 Details Operating November 1989
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | SPICER_1_UNITS-APND |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SPICER_1_UNITS-APND |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.8 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1989 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator GEN3 Details Operating November 1989
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | SPICER_1_UNITS-APND |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SPICER_1_UNITS-APND |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Minimum Load | 0.1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1989 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Spicer Meadow Project Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Calaveras County Water Dist | P O Box 846427 East St Charles Street, San Andreas, CA 95246 | Generator GEN1 | 100.00% |
Calaveras County Water Dist | P O Box 846427 East St Charles Street, San Andreas, CA 95246 | Generator GEN2 | 100.00% |
Calaveras County Water Dist | P O Box 846427 East St Charles Street, San Andreas, CA 95246 | Generator GEN3 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#639 | Falcon Dam & Power | Falcon Heights, TX | 30.6 GWh |
#640 | Turnbull Hydro | Fairfield, MT | 30.6 GWh |
#641 | Inghams | Little Falls, NY | 30.5 GWh |
#642 | White River Lock and Dam 3 | Marcella, AR | 30.4 GWh |
#643 | Chalk Hill | Stephenson, MI | 30.2 GWh |
#644 | PHP 2 | Sandy, OR | 30.2 GWh |
#645 | Ashton | Ashton, ID | 30.2 GWh |
#646 | Kingsley | Ogallala, NE | 30.2 GWh |
#647 | South Fork Tolt | North Bend, WA | 30.1 GWh |
#648 | White Rapids | Stephenson, MI | 29.8 GWh |
#650 | South Forks Hydro | Hansen, ID | 29.8 GWh |
#651 | Sugar Island | Potsdam, NY | 29.7 GWh |
#652 | Bypass | Hazelton, ID | 29.6 GWh |
#653 | Wilson Lake Hydroelectric Project | Eden, ID | 29.2 GWh |
#654 | Morgan Falls | Dunwoody, GA | 29.2 GWh |
#655 | Mill C | Town of Plattsburgh, NY | 29.1 GWh |
#656 | Black River | Black River, NY | 29.1 GWh |
#657 | Jones Fork | Fresh Pond, CA | 29.1 GWh |
#658 | Foote | Oscoda, MI | 29.1 GWh |
#659 | Deerfield 4 | Buckland, MA | 29.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Spicer Meadow Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Angels | Angels Camp, CA | 7.2 GWh | 36.6 mi |
Beardsley | None, CA | 82.7 GWh | 13.7 mi |
Camino | Camino, CA | 306.7 GWh | 41.9 mi |
Collierville Powerhouse | Murphys, CA | 536.8 GWh | 26.7 mi |
Dion R Holm | Groveland, CA | 527.1 GWh | 34.2 mi |
Donnells | None, CA | 347.7 GWh | 10.2 mi |
Electra | Jackson, CA | 354.4 GWh | 36.5 mi |
Jones Fork | Fresh Pond, CA | 29.1 GWh | 37.8 mi |
Murphys | Murphys, CA | 17.8 GWh | 29.5 mi |
Phoenix | Sonora, CA | 6.7 GWh | 30.5 mi |
R C Kirkwood | Groveland, CA | 437.6 GWh | 35.6 mi |
Robbs Peak | Fresh Pond, CA | 69.1 GWh | 40.4 mi |
Salt Springs | Pioneer, CA | 200.8 GWh | 13.9 mi |
Sand Bar Power Plant | Stanislaus Ntl. Fores, CA | 124.3 GWh | 16.3 mi |
Sierra Pacific Sonora | Standard, CA | 34.0 GWh | 34 mi |
Spring Gap | Long Barn, CA | 31.1 GWh | 15.4 mi |
Stanislaus | Vallecito, CA | 334.5 GWh | 26.6 mi |
Tiger Creek | Pioneer, CA | 246.0 GWh | 26.9 mi |
Union Valley | Fresh Pond, CA | 168.2 GWh | 40.5 mi |
West Point PH | Pioneer, CA | 81.9 GWh | 29.8 mi |