Spencer Meadow Solar Energy Storage
276 Spencer Meadow Rd, Asheboro, NC 27205Plant Summary Information
Spencer Meadow Solar Energy Storage is ranked #636 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Spencer Meadow Solar Energy Storage generated 847.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Spencer Meadow Solar Energy Storage |
---|---|
Utility Name | North Carolina El Member Corp |
Location | Randolph County, NC |
Initial Operation Date | January 2022 |
Last Update | Dec 2023 |
Annual Generation | 3.7 GWh |
Annual Consumption | 13.6 k MMBtu |
Ranked #8,385 out of 11,835 Power Plants Nationwide | |
Ranked #3,271 out of 5,643 Solar Power Plants Nationwide | |
Ranked #733 out of 862 North Carolina Power Plants | |
Ranked #636 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Spencer Meadow Solar Energy Storage
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Spencer Meadow Solar Energy Storage.
Monthly Net Generation for Spencer Meadow Solar Energy Storage
Spencer Meadow Solar Energy Storage Details
Summary Information | |
---|---|
Plant Name | Spencer Meadow Solar Energy Storage (64520) |
Plant Address | 276 Spencer Meadow Rd, Asheboro, NC 27205 |
Utility | North Carolina El Member Corp (13683) |
Latitude, Longitude | 35.71843, -79.90948 |
Generation Dates on File | Jan 2022 to Dec 2023 |
Initial Operation Date | January 2022 |
Annual Generation | 3.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Randolph Electric Member Corp (15671) NC |
Grid Voltage | 12.47 kV |
Energy Storage | Yes |
Generator BAT1 Details Operating January 2022
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 5 |
---|---|
Maximum Charge Rate | 2 MW |
Maximum Discharge Rate | 2 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 2.5 |
Storage Enclosure Type | CS |
System Peak Shaving | P |
Load Management | Yes |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 64520 |
Direct Support Gen Id | SOL1 |
Support T D Asset | No |
Generator SOL1 Details Operating January 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 2.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Spencer Meadow Solar Energy Storage Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3261 | NHA at Mansfield NJ | Washington, NJ | 3.8 GWh |
#3262 | Exeter Solar | Exeter, CA | 3.8 GWh |
#3263 | Hinton | Hinton, OK | 3.8 GWh |
#3264 | Boring Solar LLC | Sandy, OR | 3.8 GWh |
#3265 | SCCCD - Fresno Community College | Fresno, CA | 3.8 GWh |
#3266 | Hendershot Solar, LLC | Tecumseh, MI | 3.8 GWh |
#3267 | Pivot Solar 2 LLC (CSG) | Brush, CO | 3.8 GWh |
#3268 | Fountain | Fountain, MN | 3.8 GWh |
#3269 | Lowe Solar Energy Storage | Asheboro, NC | 3.7 GWh |
#3270 | Day Hill Solar, LLC | Estacada, OR | 3.8 GWh |
#3272 | City of Bowie | Mitchellville, MD | 3.8 GWh |
#3273 | Franklin Solar 2 | Louisburg, NC | 3.8 GWh |
#3274 | SCE-Snowline-White Rd (Central) | Phelan, CA | 3.8 GWh |
#3275 | 20333 Normandie PV, LLC | Torrance, CA | 3.8 GWh |
#3276 | Kearsarge Granby | Granby, MA | 3.8 GWh |
#3277 | May Shannon Solar, LLC | Clio, MI | 3.8 GWh |
#3278 | Grand Ronde Solar | Grand Ronde, OR | 3.8 GWh |
#3279 | Syncarpha El Rito | El Rito, NM | 3.8 GWh |
#3280 | Ramp Solar, LLC | Goldsboro, NC | 3.8 GWh |
#3281 | Bullhead Solar, LLC | Fayette, MI | 3.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Spencer Meadow Solar Energy Storage.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABD Farms | Asheboro, NC | 9.1 GWh | 9.1 mi |
Changeup | Asheboro, NC | 3.7 GWh | 7.3 mi |
Davidson Gas Producers LLC | Lexington, NC | 12.3 GWh | 17.5 mi |
Eastside WWTP | High Point, NC | 213.0 MWh | 15.5 mi |
Henry Farm | Liberty, NC | 8.7 GWh | 21 mi |
High Point, Pump Station Rd | High Point, NC | 32.0 MWh | 18.6 mi |
High Rock Hydro | Denton, NC | 114.3 GWh | 19.9 mi |
Hopewell Friends | Asheboro, NC | 1.8 GWh | 6.6 mi |
Little River PV 1 | Randolph, NC | 8.8 GWh | 13.7 mi |
Lowe Solar Energy Storage | Asheboro, NC | 3.7 GWh | 0 mi |
Millikan Farm | Randleman, NC | 9.6 GWh | 10.4 mi |
Morning View | Seagrove, NC | 4.0 GWh | 15.1 mi |
Old Cedar Solar Energy Storage | Asheboro, NC | 1.8 GWh | 6.8 mi |
Seagrove | Seagrove, NC | 8.7 GWh | 14.6 mi |
Strider Solar, LLC | Asheboro, NC | 9.0 GWh | 10.6 mi |
Tanager Holdings | Asheboro, NC | 6.8 GWh | 7.4 mi |
Thunderhead | Asheboro, NC | 4.0 GWh | 7.1 mi |
Trinity Solar | Trinity, NC | 8.8 GWh | 10.5 mi |
Ward WTP | High Point, NC | 24.0 MWh | 17.6 mi |
Westside WWTP | Thomasville, NC | 30.0 MWh | 19 mi |