Spectrum Solar PV Power Project
4040 State Highway 147, Las Vegas, NV 89124Plant Summary Information
Spectrum Solar PV Power Project is ranked #28 out of 54 solar farms in Nevada in terms of total annual net electricity generation.
Spectrum Solar PV Power Project generated 22.7 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Spectrum Solar PV Power Project |
---|---|
Utility Name | Southern Power Co |
Location | Clark County, NV |
Initial Operation Date | September 2013 |
Last Update | Dec 2022 |
Annual Generation | 87.7 GWh |
Annual Consumption | 319.4 k MMBtu |
Ranked #3,261 out of 11,249 Power Plants Nationwide | |
Ranked #553 out of 5,158 Solar Power Plants Nationwide | |
Ranked #66 out of 104 Nevada Power Plants | |
Ranked #28 out of 54 Nevada Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
NVT LICENSES, LLC (2013 to 2013) Southern Power Co (2014 to 2022) |
Map of Spectrum Solar PV Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Spectrum Solar PV Power Project.
Monthly Net Generation for Spectrum Solar PV Power Project
Spectrum Solar PV Power Project Details
Summary Information | |
---|---|
Plant Name | Spectrum Solar PV Power Project (58490) |
Plant Address | 4040 State Highway 147 Las Vegas, NV 89124 |
Utility | Southern Power Co (17650) |
Latitude, Longitude | 36.23, -114.87 |
Generation Dates on File | Sep 2013 to Dec 2022 |
Initial Operation Date | September 2013 |
Annual Generation | 87.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF12-493-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator 1 Details Operating September 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 30.2 MW |
Summer Capacity | 30 MW |
Winter Capacity | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 37.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Spectrum Solar PV Power Project Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Spectrum Nevada Solar, LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#543 | Lost Hills/Blackwell | Lost Hills, CA | 91.1 GWh |
#544 | Chestnut | Lemoore, CA | 86.4 GWh |
#545 | Gulf Coast Solar Center III | Bellview, FL | 90.2 GWh |
#546 | OE_AZ1 | Salome, AZ | 90.1 GWh |
#547 | Seville 2 | Ocotillo Wells, CA | 89.9 GWh |
#548 | Edwards Sanborn S3 | Mojave, CA | 83.6 GWh |
#549 | Big Cypress Solar, LLC | Crawfordsville, AR | 89.2 GWh |
#550 | Cuyama Solar, LLC | Cuyama, CA | 88.2 GWh |
#551 | Hazlehurst III | Hazlehurst, GA | 88.1 GWh |
#552 | Grazing Yak Solar | Calhan, CO | 88.0 GWh |
#554 | Eden Solar LLC | Ellerbe, NC | 87.5 GWh |
#555 | Powells Creek Solar - Hybrid | Alton, VA | 86.2 GWh |
#556 | Whitehorn Solar | Gretna, VA | 85.8 GWh |
#557 | Appaloosa Solar I | Cedar City, UT | 85.0 GWh |
#558 | Crescent Dunes Solar Energy | Tonopah, NV | 84.8 GWh |
#559 | Quinebaug Solar | Canterbury, CT | 83.8 GWh |
#560 | Gulf Coast Solar Center II | Navarre, FL | 83.4 GWh |
#561 | Big Bend II Solar | Apollo Beach, FL | 83.0 GWh |
#562 | Bluebell Solar | Sterling City, TX | 82.6 GWh |
#563 | Tres Bahias | Port Lavaca, TX | 82.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Spectrum Solar PV Power Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apex Generating Station | Las Vegas, NV | 2.6 TWh | 13.8 mi |
Apex Solar PV Power Project | North Las Vegas, NV | 53.9 GWh | 12.4 mi |
Chuck Lenzie Generating Station | Apex, NV | 7.4 TWh | 11 mi |
Clark (NVE) | Las Vegas, NV | 643.7 GWh | 14.1 mi |
Harry Allen | Las Vegas, NV | 2.1 TWh | 14 mi |
Harry Allen Solar Energy LLC | Apex, NV | 312.4 GWh | 14.7 mi |
Las Vegas Generating Station | North Las Vegas, NV | 406.6 GWh | 14.1 mi |
Las Vegas WPCF Solar Plant | Las Vegas, NV | 6.9 GWh | 11.3 mi |
Mountain View Solar | North Las Vegas, NV | 55.8 GWh | 12.3 mi |
Nellis Air Force Base Solar Array | Las Vegas, NV | 20.8 GWh | 10.5 mi |
Nellis Solar PV II | North Las Vegas, NV | 40.1 GWh | 10 mi |
Nevada Cogen Assoc#1 GarnetVly | Las Vegas, NV | 499.4 GWh | 8.3 mi |
Nevada Cogen Associates 2 Black Mountain | Las Vegas, NV | 565.9 GWh | 0.6 mi |
Playa Solar 1, LLC | North Las Vegas, NV | 207.8 GWh | 12.5 mi |
Playa Solar 2 | North Las Vegas, NV | 271.1 GWh | 12.5 mi |
Republic Services Renewable Energy, LLC | Las Vegas, NV | 32.0 GWh | 8.9 mi |
River Mountains Solar | Henderson, NV | 24.6 GWh | 14.1 mi |
Saguaro Power | Henderson, NV | 209.1 GWh | 15.2 mi |
Silverhawk | North Las Vegas, NV | 2.9 TWh | 13.3 mi |
Sun Peak Generating Station | Las Vegas, NV | 40.2 GWh | 11.2 mi |